Permit Number: DP12-0234
Parcel: 11621302B

Review Status: Completed

Review Details: DEV PKG - REVISION

Permit Number - DP12-0234
Review Name: DEV PKG - REVISION
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
03/05/2015 KROBLES1 START PLANS SUBMITTED Completed
03/13/2015 DAVID RIVERA ZONING REVIEW Approved
03/23/2015 JASON GREEN ENGINEERING REVIEW Reqs Change DATE: March 23, 2015
DUE DATE: April 01, 2015
SUBJECT: El Rio Community Health Center "AsBuilts"- Engineering Review
LOCATION: 839 W Congress Ave, T14S R13E14
REVIEWERS: Jason Green, CFM
ACTIVITY: DP12-0234


SUMMARY: Engineering Division of Planning & Development Services Department has received and reviewed the AsBuilts for the Development Plan Package and Civil Engineers Letter of Completion (13FEB15). Engineering Division does not recommend approval of the AsBuilts Development Plan Package at this time.

The following items need to be addressed:

ASBUILT PLANS:

1) Revise the development plan package with an "Asbuilt" keynote to label the new bollards that have been installed at the patient drop off area at the main entrance to the new building. Per field inspection there have been bollards added to provide for vehicular separation at this point and they need to be clearly shown.

2) Revise the development plan package with an "Asbuilt" keynote for the required handicap parking space located along the north side of the new building. Per the parking table on Sheet 1- 9 handicap spaces are required. Plan view shows a proposed 12; however per field inspection only 6 could be located on site. Either provide all 12 spaces as per the plan or revise the site plan and grading plan sheet to show the required 9 spaces per Zoning and the Parking Table.

3) Revise the development plan package and Detail 17/9 with an "Asbuilt" keynote for Water harvesting Basin A and the constructed side slopes, depth of basin, etc. Per field inspection the basin is deeper with great than 3:1 side slopes. It is acknowledged that the asbuilt grades on Sheet 13A reflect the correct basin depth, but the detail and plan view should also reflect what has been constructed onsite.

GENERAL COMMENTS:

Please provide a revised AsBuilt Development Plan Package and new Certification Letter that addresses the comments above along with the 3 items that are currently on the Final Certification Letter.

For any questions or to schedule meetings call me at 837-4929.



Jason Green, CFM
Senior Engineer Associate
Engineering Division
Planning & Development Services Department
03/27/2015 ANDREW CONNOR NPPO REVIEW Reqs Change Ensure that all Engineering comments and concerns are addressed.
03/27/2015 ANDREW CONNOR LANDSCAPE REVIEW Reqs Change Ensure that all Engineering comments and concerns are addressed.
03/31/2015 PATRICIA GEHLEN ZONING-DECISION LETTER REVIEW Reqs Change This review has been completed and resubmittal is required. Please resubmit the following items:

1) Two rolled sets of the plans
2) All items requested by review staff
3) All items needed to approve this plan