Permit Review Detail
Review Status: Completed
Review Details: RESUB - SITE and/or GRADING
Permit Number - DP12-0223
Review Name: RESUB - SITE and/or GRADING
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/04/2013 | RONALD BROWN | HC SITE | REVIEW | Approved | |
01/07/2013 | JOE LINVILLE | LANDSCAPE | REVIEW | Approved | |
12/20/2012 | DAVID RIVERA | ZONING | REVIEW | Denied | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: David Rivera Principal Planner PROJECT: D12-0223 Commercial Use Group - Parking Lot Development Package Site Plan TRANSMITTAL DATE: December 20, 2012 DUE DATE: January 4, 2012 COMMENTS: Please resubmit revised drawings along a response letter, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed. 1. Section 5.3.8.2, LUC, permits a maximum of one year from the date of application to obtain approval of a development plan. If, at the end of that time, the development plan has not been approved, it must be revised to be in compliance with all regulations in effect at that time, and must be resubmitted for a full CDRC review. The one-year expiration date for this development plan is November 26, 2013. Comments 2 and 3 are applicable until such time as the lot split application has been completed and the documentation provided to PDSD Zoning Reviewer. 2. DS 2-01.3.2.D - There is a lot split application that has been processed through PDSD but not completed. Once the lot split has been recorded there an address for the new lot must be applied for through Pima County Addressing. List the new address on the cover sheet of the development package. 3. List next to the title block on all plan sheets, the lot split case number. (Previous Comment 4) DS 2-01.3.9.E - AS has been mentioned in comment #2, a lot split application has been processed through PDSD but not completed. Zoning cannot approve the Development package until the recordation of the lot split has been done and the documentation presented to PDSD Zoning Review and the Lot split Application closed out. Also a copy of the address certificate must be provided at the time of presenting the lot split documentation. 4. The zoning comments are related to items that can be completed and reviewed by the Zoning Reviewer at the counter with and appointment, once the lot split documentation and address certificate is available for submittal or for over the counter review. If all the documents are available and if you wish an over the counter please call for an appointment. If you have any questions about this transmittal, please call David Rivera, (520) 791-5608. DGR C:\Documents\DP12-0223.doc RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development plan, additional requested documents. |
12/28/2012 | JASON GREEN | ENGINEERING | REVIEW | Denied | DATE: December 28, 2012 SUBJECT: Convergy's Parking Lot Development Plan Package- Engineering Review TO: Metro TED Attn: Lisa Bowers LOCATION: 3737 N I10 Frontage Road; T13S R13E Sec28; Ward 1 REVIEWERS: Jason Green, CFM ACTIVITY: DP12-0223 SUMMARY: Engineering Division of Planning & Development Services Department has received and reviewed the proposed Development Plan Package, Drainage Statement (Cypress Civil Development, 16NOV12) and Stormwater Pollution Prevention Plan (Cypress Civil Development, 16NOV12). Engineering Division does not recommend approval of the Development Plan Package at this time. The following items need to be addressed: DRAINAGE STATEMENT: 1) Restated: DS Sec.2-01.3.9.N.5: Provide written notarized approval from the adjacent neighbor for all offsite improvements or discharge acceptance. Label the easement in plan view on the development plan document with the Sequence # after recordation. SITE PLAN: 2) Restated: DS Sec.2-01.3.2.D: Acknowledged. Revise the development plan document to provide the new address for the property once the lot split application is completed. List the new address on the cover sheet of the development package. 3) DS Sec.2-01.3.9.N: Per DS Sec.2-01.3.9.N.5 provide written notarized approval from the adjacent neighbor for all offsite improvements or discharge acceptance. Label in plan view the easement (portion of the adjacent property as shown on the plan sheets) on the development plan document with the Sequence # after recordation. SWPPP: 4) Part III.A.3 and VIII.J.2: Ensure the SWPPP is signed by a person meeting the certification requirements of the Permit Part VIII.J. Specifically provide the owners signature on Page 8 under the Owner's Statement Section. GENERAL COMMENTS: Please provide a revised Development Plan Package and SWPPP that addresses the comment provided above. For expedite purposes the development plan package can be reviewed over the counter (PDSD Engineering Division comment only) for stamp approval once all items have been addressed. Please call to schedule an appointment when ready. For any questions or to schedule meetings call me at 837-4929. Jason Green, CFM Senior Engineer Associate Engineering Division Planning & Development Services Department |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
01/10/2013 | CPIERCE1 | REJECT SHELF | Completed |