Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: DP12-0220
Parcel: 14028004A

Address:
2201 E GANLEY RD

Review Status: Completed

Review Details: DEV PKG - RESUBMITTAL

Permit Number - DP12-0220
Review Name: DEV PKG - RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
02/26/2013 CPIERCE1 START PLANS SUBMITTED Completed
02/27/2013 DAVID RIVERA ZONING REVIEW Approved
03/07/2013 JASON GREEN ENGINEERING REVIEW Denied DATE: March 8, 2013
SUBJECT: General Rubber Development Plan Package- 2nd Engineering Review
TO: Amy Hammerstrom
LOCATION: 2201 E Ganley Road; T15S R14E Sec08
REVIEWERS: Jason Green, CFM
ACTIVITY: DP12-0220


SUMMARY: Engineering Division of Planning & Development Services Department has received and reviewed the proposed Development Plan Package, Drainage Report (Greg Carlson Engineering LLC, 20NOV12, revised 20FEB13), Geotechnical Engineering Evaluation (Patterson-Evanoff Engineering LLC, 13FEB13, addendum 21FEB13) and Stormwater Pollution Prevention Plan (Greg Carlson Engineering LLC, 19NOV12). Engineering Division does not recommend approval of the Development Plan Package at this time. This review falls under Development Standard 2-01. The following items need to be addressed:


GEOTECHNICAL REPORT:

1) DS Sec.10-01.3.5.1.3.a: Per the geotechnical addendum dated 23FEB13 provide the new percolation rates for the proposed engineered basin bottom within the detention/retention basin to verify that the drain down time meets the maximum per DS Sec.10-01.3.5.1.3.a. The addendum states that the geotechnical engineer is in the process of performing additional on-site testing of the underlying soils to provide better verification of the actual rates of infiltration due to the engineered basin floor, report should include a safety factor.


GENERAL COMMENTS:

Please provide the geotechnical addendum information requested above for Development Plan Package review and approval. For expedite purposes the Development Plan Package can be reviewed over the counter (PDSD Engineering Division comment only) for stamp approval once the supplemental information is provided.

For any questions or to schedule meetings call me at 837-4929.



Jason Green, CFM
Senior Engineer Associate
Engineering Division
Planning & Development Services Department
03/13/2013 ANDREW CONNOR LANDSCAPE REVIEW Reqs Change A 6' continuous screen along street frontages for storage area must be provided per LUC Table 3.7.2-I. Identify screening element for storage area on the landscape plan.
03/18/2013 RONALD BROWN ZONING HC REVIEW Approved
03/22/2013 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Approved
03/25/2013 PATRICIA GEHLEN ZONING-DECISION LETTER REVIEW Denied This review has been completed. Revisions required. Resubmittal must include:

1) Two rolled sets of the plans
2) All items requested by review staff.
3) All reports and documents used to approved the plans.