Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: DP12-0218
Parcel: 10703141D

Review Status: Completed

Review Details: SITE and/or GRADING

Permit Number - DP12-0218
Review Name: SITE and/or GRADING
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/02/2013 ANDREW CONNOR NPPO REVIEW Approved
11/30/2012 RBROWN1 ADA REVIEW Passed
12/05/2012 STEVE SHIELDS ZONING REVIEW Denied CDRC TRANSMITTAL

TO: Planning and Development Services Department
Plans Coordination Office

FROM: Steve Shields
Lead Planner

PROJECT: Legacy Business Park Lot 21
Development Package (1st Review)
DP12-0218

TRANSMITTAL DATE: December 5, 2012

DEVELOPMENT PLAN COMMENTS: Please resubmit revised drawings along a response letter, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed.

1. This project was reviewed for full code compliance with the Land Use Code and Development Standards for the area of expansion only.

2. Provide a copy of the last approved site plan with your next submittal.

The following comments are based on Development Standard 2-01.0:

1. D.S. 2-01.3.3 Provide the following relevant case numbers on all sheets, DP12-0218, adjacent to the title block on all sheets.

2. D.S. 2-01.3.8.B The proposed canopy addition is located over a "10' easement for communications Dkt. 6224 Pg. 742. This easement will need to be abandoned prior to approval of the development package or a letter from all communication companies that have claims to this easement will need to be provided stating that they have no objection to the canopy being located within there easement.

3. D.S. 2-01.3.9.H.c Until the last approved site plan is provided the loading requirements cannot be verified.

4. D.S. 2-01.3.9.H.d As you have elected to use the new vehicle parking space calculation you are required to use the new bicycle parking, Provide a Long & Short Term bicycle parking spaces calculation on the plan. This calculation should address the number required and number provided. If any new Short or Long term bicycle parking is required provide the location on the plan and provide a detail.

5. D.S. 2-01.3.9.O The street perimeter yard setback (West) requirement shown on sheet 1 is not correct. Per LUC Section 3.2.6.5.A Within established areas, the front street perimeter yard is twenty (20) feet or one and one-half (1 1/2) the height of the proposed wall (H), measured from the street property line, whichever is greater.

If you have any questions about this transmittal, please Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.gov

Sshield1 on DS1/planning/New Development Package/ DP12-0195

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package & Last approved site plan.
12/19/2012 RONALD BROWN H/C SITE REVIEW Approved
12/19/2012 ANDREW CONNOR LANDSCAPE REVIEW Approved
12/26/2012 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Approved
12/26/2012 KEN BROUILLETTE FIRE REVIEW Approved
12/26/2012 LOREN MAKUS ENGINEERING REVIEW Denied Provide clearance from easement holder for construction within the easement.

Final Status

Task End Date Reviewer's Name Type of Review Description
01/25/2013 CPIERCE1 REJECT SHELF Completed
01/03/2013 CPIERCE1 OUT TO CUSTOMER Completed