Permit Number: DP12-0213
Parcel: 99999999A

Review Status: Completed

Review Details: GRADING

Permit Number - DP12-0213
Review Name: GRADING
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
11/21/2012 ELIZABETH EBERBACH ENGINEERING REVIEW Approved DATE: November 21, 2012
TO: Jeff Behrana, P.E., OPTIMUS
ACTIVITY: DP12-0213
PROJECT: Tucson Marketplace Phase 3 Grading - 3rd review
LOCATION: Ward 5
FEMA: 2237K, Zone X-Unshaded
WATERSHED: Mission View Wash Watershed adjacent to Greyhound Wash Detention Area
REVIEWER: Elizabeth Leibold, P.E.
SUMMARY: The revised Development Plan package for the Phase 3 of the Tucson Market Place grading was received and reviewed by Planning & Development Services Department Engineering. PDSD Engineering recommends approval; address the following conditions during grading construction.
PERMIT CONDITIONS:
The following 26 conditions apply to DP12-0213:
1) Call for Pre-construction meeting. For a PDSD Engineering Inspection, call IVR (740-6970), or schedule with a Customer Service Representative at Planning & Development Services Department (PDSD), or contact PDSD Engineering at 837-4888, or schedule inspections online at: http://cms3.tucsonaz.gov/pdsd/inspections
2) Some grading activities will require separate special inspections by EOR or consultants. During these inspections it is recommended that PDSD Engineering Inspectors are present. Discuss during Pre-con or contact PDSD Engineering Inspector to confirm which inspections may be needed.
3) Earthwork, rough grading, and grading construction is approved for Phase 2 grading for the property as shown on the approved plans DP12-0213, within approved grading limits, as shown on plan sealed 10/15/12 by Jeff Behrana, P.E.. See also drainage statement & geotechnical report for this project.
4) Project shall conform to recommendations and requirements found in geotechnical engineering report for this project and any subsequent addenda.
5) If finished grading is not completed under this permit, a separate grading permit may be required for each pad within this commercial site.
6) Tackifiers may be used where the temporary condition applies; any pads that will be applying for permits for building and finished grading, will require permanent erosion control in form of vegetation or decorative rock as accepted by the City of Tucson.
7) Contractor is responsible to protect in place any AT&T Transcontinental fiber optic line. South boundary area may contain an underground fiber optic cable and / or Kinder Morgan Gas Line; all work within these easements must be coordinated with the proper utilities prior to any site construction.
8) A copy of stamped approved grading plan(s), grading permit(s), NOI, AzPDES general permit, geotechnical report/addenda, and other reports shall be kept at site at all times, until final grading approval.
9) Grading / Disturbance Limits shall be maintained and no disturbance outside of grading limits will be allowed. Stop Work Order may be issued if disturbance occurs outside of approved grading limits as shown on approved grading plans. There shall be no disturbance, construction vehicle traffic or parking, or stockpiling outside of approved Grading Limits as shown on Grading Plan. There shall be no disturbance of Mission View Wash Regional Detention system or Greyhound Wash, unless for limited stormwater purposes and as discussed with PDSD Inspector, and as shown on approved plans. Any disturbance of county basin area or Mission View or Greyhound Wash without authorization may result in Stop Work Order and/or other penalties.
10) Interim erosion and sediment controls shall be maintained per approved grading plans at downstream areas of disturbance limits. Interim control measures shall be placed within approved grading limits. Prior to Final Approval all temporary controls shall be removed and permanent controls shall be placed.
11) Grades adjacent to silt fence filter fabric shall be flush with existing grades to allow for flow of stormwater runoff through filter fabric, and not create dam condition that could concentrate flow at another location.
12) Stabilized entrances shall be maintained at all active access entrances. Use of water trucks or other dust controls shall be utilized, and construction entrances shall be maintained to minimize sedimentation, dust issues, and tracking.
13) Storage or placement of construction material, vehicle staging / stockpile area, and/or designated concrete washout locations shall not be located within or near regional basin, washes, floodplain, or water harvesting areas.
14) Any existing trees or transplanted trees from onsite within the SVT's shall be checked and trimmed to assure that they are clear of leaves and branches to a height of at least six feet above grade. The location of trees within existing and future sight visibility triangles may be restricted or modified as determined by the City of Tucson Inspectors in order to preserve visibility.
15) To keep construction debris from entering wash, heavy duty construction fencing at approved disturbance limits along regional basin / floodplain / wash area may need to be provided as needed and as determined with consultation between contractor, engineer, and inspector.
16) During construction activities, traffic control plans may be required if there is a safety hazard potential from construction activities conflicting with public traffic. It may be necessary to submit a copy of a traffic control plan to PDSD. Onsite traffic control plans shall minimize traffic hazard conditions between public access to buildings, and construction vehicles & activities.
17) Any revisions to Grading Plan must be reviewed by PDSD Engineering Engineer and may include discussion, details, or a revised grading plan. Call PDSD Engineering at 791-5550 to discuss any revisions.
18) If grading construction is expected to last longer than expiration date of grading permit, contact PDSD to renew/extend Grading Permit. If Final Grading Inspection has not been completed before Grading Permit expires, and permit has not been renewed, additional fees and reviews may be required. Requests for grading permit extensions may be submitted to Planning & Development Services Department (attn: Claudia Buford), prior to grading permit expiration date, for consideration of grading plan extension approval.
19) City of Tucson grading standards to DS Sec.11-01 apply.
20) For inspection purposes, post City of Tucson's "AZPDES - Posting Requirements" green sheet, or the NOI at construction entrance of site, at beginning of construction activities, and maintain this posted document throughout project construction.
21) Operator shall report to ADEQ any noncompliance (including spills) which may endanger human health or the environment. Operator shall orally notify office listed below within 24 hours:
(a) Arizona Department of Environmental Quality
1110 W. Washington, 5th floor (5515B-1)
Phoenix, AZ 85007
Office: 602-771-4466; Fax 602-771-4505
22) Receiving waters are Mission View Wash Regional Detention Basin. Also the following water systems are connected: Greyhound Wash, Tucson Diversion Channel, and downstream: Santa Cruz River.
23) Permitee shall notify PDSD when grading operation is ready for final grading inspection. Final grading approval shall not be given until all work, including installation of all drainage improvements and their permanent protective devices, and all erosion control measures have been completed in accordance with approved grading plan and grading permit, and all conditions of permit are completed.
24) Remaining signatures from Operators must be on site copy of SWPPP (exhibit or report) at or before commencement of construction. All Operators shall be identified and have separate certification statements. Assure these certifications are available on-site.
25) After interim controls are removed, permanent erosion control are required on all disturbed areas, in form of vegetative cover, gravel, a sized decorative rock, and/or other controls.
26) As-builts are required to be submitted for Phase 3. The as-built / "Final Revised Grading Plan" may be submitted under activity number DP12-0213 to PDSD permit clerks. They will be reviewed and then if acceptable, a copy will be provided to PDSD Engineering Inspector for final grading inspections. For Grading Permit Project Closure documentation, submit: one copy of original grading plans, 2 copies of as-builts, letters of completion (one for drainage improvements, and another letter for substantial completion of overall Phase 3 project). As-builts shall include: pad elevations for, inverts drainage pipes/systems, and general grades as determined by RLS to show substantial completion for Phase 3.
If you have questions, call me at 837-4934.
Elizabeth Leibold, PE
Civil Engineer
Engineering Division
Planning & Development Services Department
12/04/2012 MICHAEL ST. PAUL ZONING REVIEW Denied December 4, 2012

Development Services Department
Zoning Review Section

Michael St.Paul
Planning Technician

DP12-0213 Grading Plans for DP12-0113

Address:
1500 East Tucson Market Place Boulevard


Comments:

1. The grading plan has been reviewed by Zoning Review Section but cannot approve the plan until it has been approved at this time.

2. It appears that the grading plans phasing does not match the approved development package plan for Tucson Market Place (DP12-0113). Contact Steve Shields (Steve.Shields@tucsonaz.gov or 837-4956) concerning the revising the phasing and related parking calculations for DP12-0113.

3. Zoning will re-review the grading plan on the next submittal to ensure compliance with the approved development plan. Additional comments may be forthcoming.
12/12/2012 ANDREW CONNOR NPPO REVIEW Approved

Final Status

Task End Date Reviewer's Name Type of Review Description
12/18/2012 FERNE RODRIGUEZ OUT TO CUSTOMER Completed
12/18/2012 FERNE RODRIGUEZ REJECT SHELF Completed