Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: DP12-0212
Parcel: 99999999A

Review Status: Completed

Review Details: RESUB - SITE and/or GRADING

Permit Number - DP12-0212
Review Name: RESUB - SITE and/or GRADING
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
02/13/2013 MICHAEL ST. PAUL ZONING REVIEW Denied February 13, 2013

Development Services Department
Zoning Review Section

Michael St.Paul
Planning Technician

DP12-0212 Grading Plans for S11-044 (S12-052)

Address: 9046 S. Houghton Rd


Comments:

1. The grading plan has been reviewed by Zoning Review Section but cannot approve the plan until it has been approved by the Engineering, and Landscape Review Sections and until all zoning comments or concerns have been addressed.

2. The subdivision tentative plat must also be approved..

3. Zoning will re-review the grading plan on the next submittal to ensure compliance with the approved development plan. Additional comments may be forthcoming.
03/04/2013 PAUL MACHADO ENGINEERING REVIEW Denied Laith Alshami, Engineering and Floodplain Review, 03/06/2013,

TO: Patricia Gehlen FROM: Laith Alshami, P.E.
CDRC Engineering


SUBJECT: Walmart Store No. 5858-00
DP12-0212, T15S, R15E, SECTION 35

RECEIVED: Development Package on February 4, 2013

The subject submittal has been reviewed and it can not be approved at this time. Address the following comments before review can continue. Prepare a detailed response that explains the revisions that were made and references the exact location in the drainage report and on the Development Package where the revisions were made:

Drainage Report:

1. Clarify, in Appendix B, the locations of all proposed grate inlets.
2. According to Section 10.9.1.8 of the City of Tucson Drainage Manual, a manhole is required every 200 feet for pipes that are 30 inch or less in diameter. Verify that the proposed storm drain is compliance to facilitate the system maintenance.
3. Address, in the report, drainage facilities maintenance requirement and responsibility and specify that the inspection shall be performed by a registered civil engineer annually and/or after every major storm. Additionally, provide a drainage facilities maintenance checklist to facilitate the required maintenance.
4. Explain in the text the building roof drainage direction and explain if sidewalk scuppers will be required. Show the roof drainage direction and provide the scuppers design calculations if proposed.
5. Provide the design calculations for any proposed erosion control structures/pads.
6. Show on the drainage exhibits the 100-year ponding limits, with water surface elevations, around the proposed grate inlets.

Grading Plan:

1. Clarify if the revised site grades will conflict with the overall Houghton Town Center Grading.

If you have any questions, I can be reached at 837-4933 or Laith.Alshami@tucsonaz.gov


RESUBMITTAL REQUIRED: Revised Development Plan Package and drainage report
03/04/2013 ANDREW CONNOR NPPO REVIEW Reqs Change 1. Provide previously approved landscape and NPP plans for reference.

2. Ensure that all Engineering comments and concerns are addressed

3. Additional comments may apply

Final Status

Task End Date Reviewer's Name Type of Review Description
03/21/2013 CPIERCE1 REJECT SHELF Completed