Permit Number: DP12-0211
Parcel: 137070280

Address:
5147 S 12TH AV

Review Status: Completed

Review Details: SITE and/or GRADING

Permit Number - DP12-0211
Review Name: SITE and/or GRADING
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
12/12/2012 RBROWN1 ADA REVIEW Passed
12/24/2012 STEVE SHIELDS ZONING REVIEW Denied CDRC TRANSMITTAL

TO: Planning and Development Services Department
Plans Coordination Office

FROM: Steve Shields
Lead Planner

PROJECT: Cricket Store @ 5147 S. 12th Avenue
Development Package (1st Review)
DP12-0211

TRANSMITTAL DATE: December 24, 2012

DEVELOPMENT PLAN COMMENTS: Please resubmit revised drawings along a response letter, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed.

The proposed façade addition appears to be located within the future right-of-way, a temporary revolkable easement (TRE) or some other document may be required if the variance is approved. Contact COT Transportation Real Estate Department to verify requirements.

The following comments are based on Development Standard 2-01.0:

1. D.S. 2-01.3.9.O Per LUC Section 3.2.6.5.B & Table 3.2.6.I the required street perimeter yard setback is 21' or the height of the proposed exterior building wall, which ever is greater. That said per Table 3.2.6.I, and an average daily traffic (ADT) of 1000 or greater, and a proposed wall height of less than 21', the required street perimeter yard setback is 21' measured from the back of future curb. As a setback dimension was not provided from the proposed façade to the back of future curb the variance required cannot be determined. Provide a setback dimension from the proposed façade to the back of future curb.

Once the drawings have been revised please call or email to set up an appointment to review and provide Board of Adjustment for Variance comments for this project.

If you have any questions about this transmittal, please Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.com

Sshield1 on DS1/planning/New Development Package/ DP12-0211

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package.
12/26/2012 SPOWELL1 PLUMBING-COMMERCIAL REVIEW Needs Review
12/26/2012 SPOWELL1 LANDSCAPE REVIEW Needs Review
12/26/2012 SPOWELL1 NPPO REVIEW Needs Review
12/26/2012 SPOWELL1 FIRE REVIEW Needs Review
12/26/2012 SPOWELL1 H/C SITE REVIEW Needs Review
12/26/2012 PAUL MACHADO ENGINEERING REVIEW Needs Review

Final Status

Task End Date Reviewer's Name Type of Review Description
12/26/2012 SHANAE POWELL OUT TO CUSTOMER Completed