Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: RESUB - SITE and/or GRADING
Permit Number - DP12-0209
Review Name: RESUB - SITE and/or GRADING
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/02/2013 | ANDREW CONNOR | LANDSCAPE | REVIEW | Denied | 1. Street landscape borders shall be located entirely on site, except that, if approved by the City Engineer or designee. Obtain permission for use of ROW. 2. Screens, whether required or not, are to be located on the development side of the street landscape border so that the entire 10' buffer landscaping is visible from the street. Portion of 5' wall indicated on Cherry Ave. is within required landscape buffer revise as necessary DS 2-06.3.7.B.2. 3. An unpaved planting area, which is a minimum of thirty-four (34) square feet in area and four (4) feet in width, must be provided for each canopy tree within vehicle use area LUC 3.7.2.3.A.1.d. Dimension landscape areas used for canopy tree requirements. 4. Ensure that Zoning comments are addressed. 5. Additional comments may apply. |
01/07/2013 | TERRY STEVENS | ZONING | REVIEW | Denied | DSD TRANSMITTAL FROM: Terry Stevens Lead Planner PROJECT: DP12-0209 124 S. Cherry Av Development Package TRANSMITTAL DATE: 11/27/12 COMMENTS: Please resubmit revised drawings along with redlines and a response letter, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed. 1. This comment has not been addressed. DS 2-01.3.9.Q Provide dimensions of the proposed building on the foot print shown on sheet 2 of 6. 2. The above comment is minor in nature and can be approved over the counter by setting an appointment with me. If you have any questions about this transmittal, please call Terry Stevens, (520) 837-4961 C:\planning\cdrc\DSD\DP12-0209.doc RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised site plan and additional requested documents |
12/28/2012 | JASON GREEN | ENGINEERING | REVIEW | Approved | DATE: December 31, 2012 SUBJECT: South Cherry Residential Development Plan Package- 2nd Engineering Review TO: Metro TED Attn: Lisa Bowers LOCATION: 124 S Cherry St; T14S R14E Sec18; Ward 5 REVIEWERS: Jason Green, CFM ACTIVITY: DP12-0209 SUMMARY: Engineering Division of Planning & Development Services Department has received and reviewed the proposed Development Plan Package. Engineering Division recommends approval of the Development Plan Package at this time. For any questions or to schedule meetings call me at 837-4929. Jason Green, CFM Senior Engineer Associate Engineering Division Planning & Development Services Department |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
01/23/2013 | CPIERCE1 | APPROVAL SHELF | Completed |
01/23/2013 | FERNE RODRIGUEZ | OUT TO CUSTOMER | Completed |