Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
08/02/2013 | AROMERO4 | START | PLANS SUBMITTED | Completed | |
08/05/2013 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Approved | |
08/05/2013 | STEVE SHIELDS | ZONING | REVIEW | Denied | CDRC TRANSMITTAL TO: Planning and Development Services Department Plans Coordination Office FROM: Steve Shields Lead Planner PROJECT: The HUB at Tucson Development Package (Revision 1) DP12-0186 TRANSMITTAL DATE: August 5, 2013 DEVELOPMENT PLAN COMMENTS: Please resubmit revised drawings along a response letter, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed. 1. D.S. 2-01.3.9.H.2 Keynote 29 calls out "RAILING PER ARCHITECTUREAL PLANS". The proposed railing encroaches in to the sight visibility triangle (SVT) shown near the southeast corner of the building. Remove the railing from the SVT or provide a detail of this railing that demonstrates how the requirements of D.S. 3-01.5.1 are met. 2. D.S. 2-01.3.9.L The proposed water easement will need to be recorded prior to issuing the Certificate of Occupancy for the building. If you have any questions about this transmittal, please Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.com Sshield1 on DS1/planning/New Development Package/ DP12-0186 RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package. |
08/08/2013 | MARTIN BROWN | COT NON-DSD | FIRE | Approved | |
08/09/2013 | LOREN MAKUS | ENGINEERING | REVIEW | Denied | Show how the railing along the southeast corner meets the SVT requirements. If parking is allowed along the perimeter streets, the SVTs may be aligned with the edge of travel lane. Otherwise show how the railing doesn't obstruct visibility. |
08/12/2013 | LIZA CASTILLO | UTILITIES | TUCSON ELECTRIC POWER | Approved | 4350 E. Irvington Road, Tucson, AZ 85714 Post Office Box 711, Tucson, AZ 85702 WR#256127 August 12, 2013 Grenier Engineering Inc Attn: John Grenier 5524 E 4th St Tucson, Arizona 85711 Dear Mr. Grenier: SUBJECT: The Hub of Tucson DP12-0186 Tucson Electric Power Company has reviewed and approved the development plan submitted August 6, 2013. It appears that there are no conflicts with the existing facilities within the boundaries of this proposed development. Enclosed is a copy of a TEP facilities map showing the approximate location of the existing facilities. Any relocation costs will be billable to the customer. In order to apply for electric service, call the New Construction Department at (520) 918-8300. Submit a final set of plans including approved site, electrical load, paving off-site improvements and irrigation plans, if available include a CD with the AutoCAD version of the plans. If easements are required, they will be secured by separate instrument. Your final plans should be sent to: Tucson Electric Power Company Attn: Mr. Richard Harrington New Business Project Manager P. O. Box 711 (DB-101) Tucson, AZ 85702 520-917-8726 Should you have any technical questions, please call the area Designer Mike Kaiser at (520) 918-8244. Sincerely, Elizabeth Miranda Office Support Specialist Design/Build Enclosures cc: DSD_CDRC@tucsonaz.gov, City of Tucson (email) M. Kaiser, Tucson Electric Power |
08/14/2013 | JOSE ORTIZ | COT NON-DSD | TRAFFIC | Approved | |
08/14/2013 | TIM ROWE | PIMA COUNTY | WASTEWATER | Approved | See PCRWRD form in SIRE |
08/16/2013 | JOE LINVILLE | LANDSCAPE | REVIEW | Approved | |
08/19/2013 | JOHN BEALL | COT NON-DSD | COMMUNITY PLANNING | Approved | |
08/20/2013 | PATRICIA GEHLEN | ZONING-DECISION LETTER | REVIEW | Denied | Review has been completed and resubmittal is required. Please resubmit the following items: 1) Two rolled sets of the plans 2) All items requested by review staff 3) All items needed for the review. 4) A disk containing all items submitted. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
09/16/2013 | CPIERCE1 | REJECT SHELF | Completed |