Review Date Reviewer's Name Type of Review Description Status Comments
11/28/2012 CPIERCE1 START PLANS SUBMITTED Completed
11/29/2012 PGEHLEN1 DESIGN EXAMINER REVIEW Approved DESIGN PROFESSIONAL ****
>
> RECOMMENDATIONS & MODIFICATIONS REPORT LETTER****
>
> ** **
>
> PROJECT: COT CDRC DP12-0186 December 3, 2012****
>
> THE HUB AT TUCSON****
>
> 1011 NORTH TYNDALL AVENUE****
>
> MAIN GATE DISTRICT/AREA 1 ****
>
> OVERLAY REVIEW****
>
> ** **
>
> This project has been selected for review by Rick Gonzalez, Architect
> (RGA), a contracted Design Professional for the City of Tucson (COT).
> RGA
> has conducted a Main Gate District (MGD) Urban Overlay District (UOD)
> **review*
> * #2** for compliance with the MGD zoning option on behalf of the Planning
> and
> Development Services Department (PDSD) Director, Ernie Duarte,
> Planning
> Administrator (PA), Jim Mazzocco, and CDRC Manager, Patricia
> Gehlen.****
>
> ** **
>
> * On further review the plans, and the 91 page DRC presentation
> documents,
> *
> *were found to be in *substantial compliance with the MGD UOD
> recommendations and the intent of D-4b (Special Bulk Reduction)**, RGA
> will
> forward this letter of recommendation of compliance to the COT PDSD
> Director and PA. The DRC shall make the final decision on the
> project’s
> compliance with MGD design requirements in this Area 1 development
> (B-2.d.6). The applicant shall include the Design Professional’s
> communication in the development package (B-2.d.5).****
>
> ** **
>
> The Design Review Committee reviewed this Area 1 project for
> compliance
> with Section D and the MGD zoning options in compliance with Section
> B-2.d.
> The project was accepted as presented. The DRC has added several
> conditions
> and commitments to the approval to assure compliance with the intent of
> the
> MGD. Refer to MGD DRC Final Motion - Regarding 1011 North Tyndall
> Avenue
> (parcels 520A and 5240), November 14, 2012 meeting.****
>
> ** **
>
> ****
>
> ** **
>
> ** **
>
> END OF 2ND CDRC REVIEW, DESIGN PROFESSIONAL RECOMMENDATIONS AND
> MODIFICATIONS****
>
> ** **
12/06/2012 TIM ROWE PIMA COUNTY WASTEWATER Approved PIMA COUNTY
REGIONAL WASTEWATER RECLAMATION DEPARTMENT
201 NORTH STONE AVENUE
TUCSON, ARIZONA 85701-1207
JACKSON JENKINS PH: (520) 740-6500
DIRECTOR FAX: (520) 620-0135


December 6, 2012

To: GRENIER ENGINEERING, INC.

Thru: Patricia Gehlen, CDRC Manager
City of Tucson Development Services Department


____________________________________________
From: Tom Porter, Sr. CEA (520-740-6719), Pima County Regional Wastewater Reclamation Department

Subject: THE HUB AT TUCSON
Development Plan - 2nd submittal
DP12-0186

The Pima County Regional Wastewater Reclamation Department (PCRWRD) has reviewed the proposed sewer collection lines for the above-referenced project. The following comments are offered for your use:
The Pima County Regional Wastewater Reclamation Department hereby approves the above referenced submittal of the development plan.
12/11/2012 JOSE ORTIZ COT NON-DSD TRAFFIC Approved
12/12/2012 JOE LINVILLE LANDSCAPE REVIEW Approv-Cond The submitted plans did not appear to address the following comment from the previous review.


Revise General Note 6 on sht. L1.2 as necessary.
12/12/2012 LOREN MAKUS ENGINEERING REVIEW Approv-Cond The engineering section recommends approval of the development package on the condition that recordation of all utility easements is provided.
12/13/2012 JOHN BEALL COT NON-DSD COMMUNITY PLANNING Approved
12/14/2012 PATRICIA GEHLEN ZONING-DECISION LETTER REVIEW Approv-Cond Review has been completed. Minor revisions required.
12/14/2012 STEVE SHIELDS ZONING REVIEW Approv-Cond CDRC TRANSMITTAL

TO: Planning and Development Services Department
Plans Coordination Office

FROM: Steve Shields
Lead Planner

PROJECT: The HUB at Tucson
Development Package (2nd Review)
DP12-0186

TRANSMITTAL DATE: December 4, 2012

DEVELOPMENT PLAN COMMENTS: Please resubmit revised drawings along a response letter, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed.

The following comments are based on Development Standard 2-01.0:

1. Until a building plan is submitted for review a conditional approval cannot be provided for the development package. D.S. 2-01.3.8.B All existing easement shown to be abandoned will need to abandoned prior to approval of this development package.

2. Until a building plan is submitted for review a conditional approval cannot be provided for the development package. D.S. 2-01.3.9.E Provide a copy of the approved Pima County Combination Request form for combining the existing parcels with you next submittal. The combination will need to be completed prior to approval of this development package.

3. D.S. 2-01.3.9.H.5.d Show the location for the Long-term bicycle parking that is required for the retail portion of the plan.

4. D.S. 2-01.3.9.H.5.d It is not clear how the proposed Short-term Bicycle "BAR-TYPE" rack meets the requirements of LUC 3.3.9.2.B.2. Demonstrate how the requirement is met.

5. Until a building plan is submitted for review a conditional approval cannot be provided for the development package. There appears to be architectural features proposed within the right-of-way (ROW). These features will need to be approved by the Department of Transportation and any required permits, licenses or easements will need to be obtained.

If you have any questions about this transmittal, please Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.com

Sshield1 on DS1/planning/New Development Package/ DP12-0186

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package.

Final Status

Task End Date Reviewer's Name Type of Review Description
02/27/2013 PGEHLEN1 APPROVAL SHELF Completed
02/27/2013 PGEHLEN1 OUT TO CUSTOMER Completed
02/27/2013 PGEHLEN1 REJECT SHELF Completed