Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: SITE and/or GRADING
Permit Number - DP12-0135
Review Name: SITE and/or GRADING
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
11/05/2012 | RBROWN1 | ADA | REVIEW | Passed | |
11/09/2012 | STEVE SHIELDS | ZONING | REVIEW | Denied | CDRC TRANSMITTAL TO: Planning and Development Services Department Plans Coordination Office FROM: Steve Shields Lead Planner PROJECT: Tap + Bottle Development Package (1st Review) DP12-0135 TRANSMITTAL DATE: November 15, 2012 DEVELOPMENT PLAN COMMENTS: Please resubmit revised drawings along a response letter, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed. The following comments are based on Development Standard 2-01.0: 1. D.S. 2-01.3.3 Provide the development package number, DP12-0135 adjacent to the title block on each sheet. 2. D.S. 2-01.3.3 Provide any relevant case numbers, MDR, adjacent to the title block on each sheet. 3. D.S. 2-01.3.7.A.1 Remove the "H" from "ZONING AND LAND USE NOTE" #1 as this property is not historic designated. 4. D.S. 2-01.3.7.A.6.b "ZONING AND LAND USE NOTE" #7 remove the references to Davis Monthan and Zoning History from the note as they are not applicable. 5. D.S. 2-01.3.7.A.6.b "ZONING AND LAND USE NOTE" #7 provide the LUC Sections for all applicable overlay zones. 6. D.S. 2-01.3.7.A.9.b "ZONING AND LAND USE NOTE" #10 remove the reference to "LOT COVERAGE" as it is not applicable and provide a Floor Area Ration (FAR) calculation the meets the requirements of LUC Section 3.2.11. 7. D.S. 2-01.3.8.A Provide site boundary perimeter information, including bearing in degrees, minutes, and seconds, for all sides of the parcel. 8. D.S. 2-01.3.9.F Remove the "H" from the "HC-3" zoning shown on the site plan 9. D.S. 2-01.3.9.H.5.a Provide a vehicle parking space calculation on the plan. Until provided comments for the MDR cannot be provided or verified. 10. D.S. 2-01.3.9.H.5.d Provide a bicycle parking space calculation on the plan. Until provided comments for the MDR cannot be provided or verified. If you have any questions about this transmittal, please Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.com Sshield1 on DS1/planning/New Development Package/ DP12-0135 RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package. |
11/19/2012 | CPIERCE1 | PLUMBING-COMMERCIAL | REVIEW | Needs Review | |
11/19/2012 | CPIERCE1 | LANDSCAPE | REVIEW | Needs Review | |
11/19/2012 | CPIERCE1 | NPPO | REVIEW | Needs Review | |
11/19/2012 | CPIERCE1 | FIRE | REVIEW | Needs Review | |
11/19/2012 | CPIERCE1 | H/C SITE | REVIEW | Needs Review | |
11/19/2012 | LOREN MAKUS | ENGINEERING | REVIEW | Needs Review |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
11/19/2012 | CPIERCE1 | OUT TO CUSTOMER | Completed |