Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: DP12-0124
Parcel: 133170630

Address:
350 N WILMOT RD

Review Status: Completed

Review Details: SITE and/or GRADING

Permit Number - DP12-0124
Review Name: SITE and/or GRADING
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
07/27/2012 RBROWN1 ADA REVIEW Passed
08/07/2012 ANDREW CONNOR LANDSCAPE REVIEW Approved
08/08/2012 ANDREW CONNOR NPPO REVIEW Approved
08/14/2012 STEVE SHIELDS ZONING REVIEW Approv-Cond CDRC TRANSMITTAL

TO: Planning and Development Services Department
Plans Coordination Office

FROM: Steve Shields
Lead Planner

PROJECT: St. Joseph's Hospital - Chapel Expansion
Development Package (1st Review)
DP12-0124

TRANSMITTAL DATE: August 14, 2012

DEVELOPMENT PLAN COMMENTS: Please resubmit revised drawings along a response letter, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed.

1. The Zoning Review Section conditionally approves the development package for this project, subject to the following changes on the sign-off copies. However, should there be any changes requested by other CDRC members, the Zoning Review Section approval is void, and we request copies of the revised development plan to verify that those changes do not affect any zoning requirements

The following comments are based on Development Standard 2-01.0:

1. D.S. 2-01.3.3 Provide the development package number, DP12-0124 adjacent to the title block on all sheets.

2. D.S. 2-01.3.7.A.9.c Provide a cumulative building area expansion calculation on the plan. This calculation should go back to the last full code compliance review, D06-0008.

If you have any questions about this transmittal, please Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.com

Sshield1 on DS1/planning/New Development Package/ DP12-0124

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package.
08/15/2012 LAITH ALSHAMI ENGINEERING REVIEW Approved Laith Alshami, Engineering and Floodplain Review, 08/17/2012,

TO: Patricia Gehlen FROM: Laith Alshami, P.E.
CDRC Engineering

SUBJECT: St. Joseph's Hospital - Chapel Expansion
DP12-0124, T14S, R15E, SECTION 07

RECEIVED: Development Package on July 26, 2012

The subject project has been reviewed. The submittal Plan is acceptable and it is hereby recommended for approval pertaining to Engineering and Floodplain Review.

Please be advised that the case number (i.e. DP12-0124) shall be completed on the final approved document.
08/16/2012 JOHN BEALL COT NON-DSD COMMUNITY PLANNING Passed PLANNING AND DEVELOPMENT SERVICES DEPARTMENT
COMMENTS

Regarding

SUBJECT: Community Design Review Committee Application

CASE NUMBER: CASE NAME: DATE SENT

DP12-0124 Hospice Addition - St. Joseph Hospital PAD 8/16/12

() Final Plat
(X) Development Plan
() Landscape Plan
() Revised Plan/Plat
() Board of Adjustment
() Other -

CROSS REFERENCE:

NEIGHBORHOOD PLAN: St. Joseph's Hospital (PAD-13)

GATEWAY/SCENIC ROUTE: No

COMMENTS DUE BY: 8/29/12

SUBJECT DEVELOPMENT PLAN/PLAT HAS BEEN REVIEWED BY COMMUNITY PLANNING AND PRESERVATION, AND STAFF SUBMITS THE FOLLOWING COMMENTS:

(X) No Resubmittal Required:
() Final Plat
() Development Plan
() Landscape Plan
() Other


REVIEWER:msp 837-6971 DATE: 08/16/12
08/17/2012 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied Revise the site drawing to include the following information:
a. the location and size of the water meter and backflow preventer
b. the location of the main water lines and fire hydrants
c. the location of the gas meter (if one exists or is planned)
d. the location and size of the private sanitary sewer
e. the location of the building connection to the private sewer
f. the location, invert, and rim elevation of the upstream and downstream manholes
g. the first floor elevation for the building
Reference: City of Tucson Development Standard No. 2-01.0.0, Section 3.8 D and Section 103.2.3, UPC 2006.
08/20/2012 KEN BROUILLETTE FIRE REVIEW Approved
08/20/2012 RONALD BROWN H/C SITE REVIEW Approved

Final Status

Task End Date Reviewer's Name Type of Review Description
08/27/2012 CINDY AGUILAR OUT TO CUSTOMER Completed