Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: SITE and/or GRADING
Permit Number - DP12-0124
Review Name: SITE and/or GRADING
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
07/27/2012 | RBROWN1 | ADA | REVIEW | Passed | |
08/07/2012 | ANDREW CONNOR | LANDSCAPE | REVIEW | Approved | |
08/08/2012 | ANDREW CONNOR | NPPO | REVIEW | Approved | |
08/14/2012 | STEVE SHIELDS | ZONING | REVIEW | Approv-Cond | CDRC TRANSMITTAL TO: Planning and Development Services Department Plans Coordination Office FROM: Steve Shields Lead Planner PROJECT: St. Joseph's Hospital - Chapel Expansion Development Package (1st Review) DP12-0124 TRANSMITTAL DATE: August 14, 2012 DEVELOPMENT PLAN COMMENTS: Please resubmit revised drawings along a response letter, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed. 1. The Zoning Review Section conditionally approves the development package for this project, subject to the following changes on the sign-off copies. However, should there be any changes requested by other CDRC members, the Zoning Review Section approval is void, and we request copies of the revised development plan to verify that those changes do not affect any zoning requirements The following comments are based on Development Standard 2-01.0: 1. D.S. 2-01.3.3 Provide the development package number, DP12-0124 adjacent to the title block on all sheets. 2. D.S. 2-01.3.7.A.9.c Provide a cumulative building area expansion calculation on the plan. This calculation should go back to the last full code compliance review, D06-0008. If you have any questions about this transmittal, please Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.com Sshield1 on DS1/planning/New Development Package/ DP12-0124 RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package. |
08/15/2012 | LAITH ALSHAMI | ENGINEERING | REVIEW | Approved | Laith Alshami, Engineering and Floodplain Review, 08/17/2012, TO: Patricia Gehlen FROM: Laith Alshami, P.E. CDRC Engineering SUBJECT: St. Joseph's Hospital - Chapel Expansion DP12-0124, T14S, R15E, SECTION 07 RECEIVED: Development Package on July 26, 2012 The subject project has been reviewed. The submittal Plan is acceptable and it is hereby recommended for approval pertaining to Engineering and Floodplain Review. Please be advised that the case number (i.e. DP12-0124) shall be completed on the final approved document. |
08/16/2012 | JOHN BEALL | COT NON-DSD | COMMUNITY PLANNING | Passed | PLANNING AND DEVELOPMENT SERVICES DEPARTMENT COMMENTS Regarding SUBJECT: Community Design Review Committee Application CASE NUMBER: CASE NAME: DATE SENT DP12-0124 Hospice Addition - St. Joseph Hospital PAD 8/16/12 () Final Plat (X) Development Plan () Landscape Plan () Revised Plan/Plat () Board of Adjustment () Other - CROSS REFERENCE: NEIGHBORHOOD PLAN: St. Joseph's Hospital (PAD-13) GATEWAY/SCENIC ROUTE: No COMMENTS DUE BY: 8/29/12 SUBJECT DEVELOPMENT PLAN/PLAT HAS BEEN REVIEWED BY COMMUNITY PLANNING AND PRESERVATION, AND STAFF SUBMITS THE FOLLOWING COMMENTS: (X) No Resubmittal Required: () Final Plat () Development Plan () Landscape Plan () Other REVIEWER:msp 837-6971 DATE: 08/16/12 |
08/17/2012 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | Revise the site drawing to include the following information: a. the location and size of the water meter and backflow preventer b. the location of the main water lines and fire hydrants c. the location of the gas meter (if one exists or is planned) d. the location and size of the private sanitary sewer e. the location of the building connection to the private sewer f. the location, invert, and rim elevation of the upstream and downstream manholes g. the first floor elevation for the building Reference: City of Tucson Development Standard No. 2-01.0.0, Section 3.8 D and Section 103.2.3, UPC 2006. |
08/20/2012 | KEN BROUILLETTE | FIRE | REVIEW | Approved | |
08/20/2012 | RONALD BROWN | H/C SITE | REVIEW | Approved |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
08/27/2012 | CINDY AGUILAR | OUT TO CUSTOMER | Completed |