Permit Review Detail
Review Status: Completed
Review Details: RESUB - SITE and/or GRADING
Permit Number - DP12-0108
Review Name: RESUB - SITE and/or GRADING
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
10/05/2012 | MARTIN BROWN | FIRE | REVIEW | Approved | |
10/15/2012 | RONALD BROWN | HC SITE | REVIEW | Approved | |
10/17/2012 | STEVE SHIELDS | ZONING | REVIEW | Denied | CDRC TRANSMITTAL TO: Planning and Development Services Department Plans Coordination Office FROM: Steve Shields Lead Planner PROJECT: Tucson Electric Power - Contractors Yard Development Package (1st Review) DP12-0108 TRANSMITTAL DATE: October 18, 2012 DEVELOPMENT PLAN COMMENTS: Please resubmit revised drawings along a response letter, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed. 1. D.S. 2-01.3.9.H.5 At the north end of the paved vehicle use area, north of the proposed trash enclosure, demonstrate how the requirements of LUC Section 3.3.6.8.A are met or clarify what type of dust control will be used for this area. A permit will be required for the "FUTURE MODULAR BUILDING" shown on the plan. This building can be dealt with in one of two ways; a. Remove the building from the plan and revise the development package when applying for the required permit. The following comments will need to be addressed at that time b. Show the building on the plan and address the following comments. 1. D.S. 2-01.3.7.A.9.a As a general note provide the floor area for all buildings on site, existing and proposed. 2. D.S. 2-01.3.7.A.9.b As a general note provide a Floor Area Ratio calculation (FAR) for the entire site. The calculation should provide the allowed and proposed Floor Area (FA), see LUC Section 3.2.11. 3. D.S. 2-01.3.7.A.9.c As a general note provide a cumulative building expansion calculation for the entire site. 4. D.S. 2-01.3.9.H.5.d Depending on the size of the proposed building Long-term bicycle parking may be required, see LUC Section 3.3.8.2.A.1. D.S. 2-01.3.9.H.5.d Per LUC Section 3.3.8.2.B STORAGE USE GROUP Commercial Storage & Hazardous Material Storage Minimum Long-term bicycle parking requirement is 2 spaces. Provide a bicycle parking calculation on the plan the show the number required and number provided. 5. D.S. 2-01.3.9.Q Provide the square footage and the height of all existing and proposed structures and the specific use proposed within the footprint of the buildings. 6. D.S. 2-01.3.9.R Show on-site pedestrian circulation as required by the LUC utilizing location and the design criteria in Development Standard 2-08.0. 7. Once the above comments are addressed zoning is willing to provide and over-the-counter review. Please call or email to schedule this review. Sshield1 on DS1/planning/New Development Package/ DP12-0108 RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package. |
10/25/2012 | LOREN MAKUS | ENGINEERING | REVIEW | Approved | |
10/29/2012 | ANDREW CONNOR | LANDSCAPE | REVIEW | Approv-Cond | The site plan and landscape plan must show identical site layout to avoid conflict between the two plans. Ensure that all changes to the site plan are reflected on the landscape plan. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
11/07/2012 | CINDY AGUILAR | REJECT SHELF | Completed |