Permit Number: DP12-0099
Parcel: 11811010B

Review Status: Completed

Review Details: REVISION - GRADING

Permit Number - DP12-0099
Review Name: REVISION - GRADING
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
12/02/2014 JASON GREEN ENGINEERING REVIEW Reqs Change DATE: December 2, 2014
SUBJECT: Discount Cab Development Plan Package "AsBuilts"- Engineering Review
LOCATION: 829 W Silverlake Rd, T14S R13E 2 Ward 1
REVIEWERS: Jason Green, CFM
ACTIVITY: DP12-0099 and T12OT01005


SUMMARY: Engineering Division of Planning & Development Services Department has received and reviewed the AsBuilts for the Development Plan Package and Civil Engineers Letter of Completion (10NOV14). Engineering Division does not recommend approval of the AsBuilts Development Plan Package at this time.

The following items need to be addressed:

ASBUILT PLANS:

1) Revise the AsBuilts to provide a Keynote on each sheet submitted to clearly state that the pedestrian access areas along the back and sides of the building that has sidewalk constructed with 0" reveal is not for public access. Cloud the areas of the sidewalk that fall within the area that was constructed with 0" reveal to show that it is around the building that has zero public access.

2) Verify the 2 Fire Hydrants (Keynote #35) that are shown on the plan set but not constructed within the field. If the Fire Hydrants are to be constructed this must be done prior to Final Inspection, if the Hydrants are not to be constructed they must be removed from the plan set and APPROVAL from the FIRE Department will be required prior to AsBuilt approval and/or Final approval.

3) Per field inspection 8 of the trees that were to remain onsite per the Landscape Sheets have been removed. Provide verification from the Landscape reviewer that the trees are not required or provided approval that new trees will be constructed in place to satisfy all Landscaping requirements.

GENERAL COMMENTS:

Please provide a revised AsBuilt Development Plan Package and new Certification Letter that addresses the comments above.

For any questions or to schedule meetings call me at 837-4929.



Jason Green, CFM
Senior Engineer Associate
Engineering Division
Planning & Development Services Department
12/03/2014 DAVID RIVERA ZONING REVIEW Reqs Change From: David Rivera, Principal Planner
Date: december 3, 2014

Project: DP12-0099 (AS-Built Drawings)


Zoning concurs with the Engineering review comments. Address comments as noted by Jason Green and re-submit for review. Zoning is willing to review the revised plans over the counter once the plamns have been addressed.
12/12/2014 JOE LINVILLE NPPO REVIEW Approved

Final Status

Task End Date Reviewer's Name Type of Review Description
12/31/2014 CPIERCE1 REJECT SHELF Completed