Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: DEV PKG
Permit Number - DP12-0088
Review Name: DEV PKG
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 06/07/2012 | FERNE RODRIGUEZ | START | PLANS SUBMITTED | Completed | |
| 06/07/2012 | RONALD BROWN | ADA | REVIEW | Passed | |
| 06/13/2012 | DAVID RIVERA | ZONING | REVIEW | Approv-Cond | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: David Rivera Principal Planner PROJECT: DP12-0088 Salpointe High School - Softball Field and Sidewalk improvements Development Package TRANSMITTAL DATE: June 13, 2012 DUE DATE: July 6, 2012 COMMENTS: Zoning Conditionally approves the Development Package at this time. See comments below, address and revise the plans as requested. Zoning will review the changes when resubmiktted for stamps to assure that the changes requested have been made. 1. Section 5.3.8.2, LUC, permits a maximum of one year from the date of application to obtain approval of a development plan. If, at the end of that time, the development plan has not been approved, it must be revised to be in compliance with all regulations in effect at that time, and must be resubmitted for a full CDRC review. The one-year expiration date for this development plan is June 6, 2013. 2. DS 2-01.3.3 - This project has been assigned the development package case number DP12-0088. Please list the case number in the lower right corner of all plan sheets. 3. DS 2-01.3.8.C - label the new right of way width at the right turn lane area along the north entrance. 4. DS 2-01.3.8.R - DG is not an approved material for pedestrian sidewalks. Per the PAD, page 65 pedestrian facilities are to be accessible. DG is not approved as a material that provides for accessible routes. The PAD is silent on material to be used for pedestrian facilities and therefore defaults back to the Land Use code or Development Standards. DS 2-08 requires that all sidewalks must be constructed of concrete or similar materials in hardness and durability. Revise the type of material to be used for the new pedestrian facilities proposed on this plan. If you have any questions about this transmittal, please call David Rivera, (520) 791-5608. DGR C:\planning\cdrc\developmentplan\DP12-088dp.doc RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development plan |
| 06/19/2012 | MARTIN BROWN | COT NON-DSD | FIRE | Approved | |
| 06/26/2012 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Approved | |
| 06/28/2012 | RONALD BROWN | ZONING HC | REVIEW | Denied | 1. Developemnt Standards does not allow DG for pedestrian ways. Reference Zoning comments. 2. Insure the owner provided bleachers complies with the 2006 IBC, Section 1108.2.2 and ICC A117.1, Section 802. END OF REVIEW |
| 06/29/2012 | JASON GREEN | ENGINEERING | REVIEW | Denied | DATE: June 27, 2012 SUBJECT: Salpointe Catholic High School Development Plan Package- Engineering Review TO: Grenier Engineering; Attn: Jason Morse LOCATION: 1545 E Copper St, T13S R14E S31 Ward 3 REVIEWERS: Jason Green, CFM ACTIVITY: DP12-0088 Softball Field Improvements SUMMARY: Engineering Division of Planning & Development Services Department has received and reviewed the proposed Development Plan Package and Master Drainage Study (Grenier Engineering, Inc., 19MAR12). Engineering Division recommends conditional approval of the Development Plan Package at this time. The following items need to be addressed prior to final approval: SITE PLAN: 1) DS Sec.2-01.3.3: The relevant Development Plan Package number (DP12-0088) may be added to the lower right hand corner of the plan on all sheets. 2) DS Sec.2-01.3.9.J: Revise the development plan document to label all dimensions for the proposed right turn lane from Glenn Street onto the subject property. The new right-of-way needs to be fully dimensioned. Please provide a revised Development Plan Package that addresses the comments provided above. For expedite purposes the development plan package can be reviewed over the counter (PDSD Engineering Division comment only) for stamp approval once all items have been addressed. Please call to schedule an appointment when ready. For any questions or to schedule meetings call me at 837-4929. Jason Green, CFM Senior Engineer Associate Engineering Division Planning & Development Services Department |
| 07/03/2012 | JOE LINVILLE | LANDSCAPE | REVIEW | Approved | |
| 07/09/2012 | JOHN BEALL | COT NON-DSD | URBAN PLANNING & DESIGN | Approv-Cond | PLANNING AND DEVELOPMENT SERVICES DEPARTMENT COMMENTS Regarding SUBJECT: Community Design Review Committee Application CASE NUMBER: CASE NAME: DATE SENT DP12-0088 Salpointe Catholic High School (Softball Field) () Tentative Plat (X) Development Plan () Landscape Plan () Revised Plan/Plat () Board of Adjustment () Other - Elevations CROSS REFERENCE: Salpointe Catholic High School PAD -17 NEIGHBORHOOD PLAN: Salpointe Catholic High School PAD -17 GATEWAY/SCENIC ROUTE: NO COMMENTS DUE BY: July 6, 2012 SUBJECT DEVELOPMENT PLAN/PLAT HAS BEEN REVIEWED BY COMMUNITY PLANNING AND PRESERVATION, AND STAFF SUBMITS THE FOLLOWING COMMENTS: () No Annexation or Rezoning Conditions, Not an RCP - No Comment () Proposal Complies with Annexation or Rezoning Conditions () RCP Proposal Complies with Plan Policies (X) See Additional Comments Attached () No Additional Comments - Complies With Planning Comments Submitted on: (X) Resubmittal Required: () Tentative Plat (X) Development Plan (X) Landscape Plan () Other REVIEWER:msp 791-5505 DATE: 07/09/12 Planning and Development Services Department Community Planning Section DP12 088 - Salpointe Catholic High School (Soft Ball Field) July 9, 2012 Staff offers the following comments: 1. Per Salpointe Catholic High School PAD-17, page 89, it requires baseball and softball fields to be completely refurbished with covered bleachers, restrooms, concession stands, and new field lights. Please revise DP12-0088 to address these requirements or address in the key notes if these requirements will be by separate process/permit(s) during building permit reviews. |
| 07/10/2012 | JWILLIA4 | WWM | REVIEW | Approved | PIMA COUNTY REGIONAL WASTEWATER RECLAMATION DEPARTMENT 201 NORTH STONE AVENUE TUCSON, ARIZONA 85701-1207 JACKSON JENKINS PH: (520) 740-6500 DIRECTOR FAX: (520) 620-0135 July 10, 2012 To: JOHN GRENIER GRENIER ENGINEERING, INC. Thru: Patricia Gehlen, CDRC Manager City of Tucson Development Services Department ____________________________________________ From: Tom Porter, Sr. CEA (520-740-6719), Pima County Regional Wastewater Reclamation Department Subject: SALPOINTE CATHOLIC HIGH SCHOOL SOFTBALL FIELD IMPROVEMENTS Development Plan - 1st submittal DP12-0088 The Pima County Regional Wastewater Reclamation Department (PCRWRD) has reviewed the proposed sewer collection lines for the above-referenced project. The following comments are offered for your use: The Pima County Regional Wastewater Reclamation Department hereby approves the above referenced submittal of the development plan. cc: Chad Amateau, PE Checked by:_________ Kristin Greene, PE, DLU Manager DLU Project folder |
| 07/10/2012 | JOHN WILLIAMS | ZONING-DECISION LETTER | REVIEW | Denied | COMMUNITY DESIGN REVIEW COMMITTEE PLANNING & DEVELOPMENT SERVICES July 10, 2012 Jason Morse Grenier Engineering 5524 E. 4th Street Tucson, Arizona 85711 Subject: DP12-0088 SALPOINTE HIGH SCHOOL SOFTBALL Development Package Dear Jason: Your submittal for the above project has been reviewed by the Community Design Review Committee and the comments reflect the outstanding requirements which need to be addressed before approval is granted. Please review the comments carefully. Once you have addressed all of the comments, please submit the following revised documents and 2 sets of the DETAILED cover letter explaining how each outstanding requirement has been addressed: ALL BLACKLINES MUST BE ROLLED 2 Rolled Copies of Revised Development Package (PDSD2) Should you have any questions, please call me at 837-4893. Sincerely, John Williams Planning Technician All comments for this case are available on our website at http://www.tucsonaz.gov/dsd/ Via Email: jmorse@greniereng.com |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 07/31/2012 | CINDY AGUILAR | OUT TO CUSTOMER | Completed |