Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: DP12-0025
Parcel: 14121024K

Review Status: Completed

Review Details: DEV PKG - RESUBMITTAL

Permit Number - DP12-0025
Review Name: DEV PKG - RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
09/04/2012 CPIERCE1 START PLANS SUBMITTED Completed
09/25/2012 RONALD BROWN ZONING HC REVIEW Approved
09/27/2012 ANDREW CONNOR LANDSCAPE REVIEW Approved
10/01/2012 TERRY STEVENS ZONING REVIEW Denied DSD TRANSMITTAL

FROM: Terry Stevens
Lead Planner

PROJECT: DP12-0025
9245 E. Old Vail Rd.
Development Package

TRANSMITTAL DATE: 10/02/2012

COMMENTS: Please resubmit revised drawings along with redlines and a response letter, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed.

1. This plan cannot be approved until written documentation from El Paso Natural Gas has been provided approving the plans.

2. The parking calculations are incorrect. The total square footage of use area and GFA 18,903. Therefore divided by 300 the number of required parking spaces is 63. The number of provided parking spaces does not include spaces used for bus or van parking. Revise the number of required and provided vehicle parking spaces in the calculations. A count of the parking spaces for the entire site appears to be 88 parking spaces being provided.

3. The zoning final inspection will not be approved until permits have been obtained for the unpermitted structures per keynote #31 on sheet 2 of 17.

4. The above comments are minor in nature and can be approved over the counter by setting an appointment with me.

If you have any questions about this transmittal, please call Terry Stevens, (520) 837-4961

C:\planning\cdrc\DSD\DP12-0025.doc
10/02/2012 PAUL MACHADO ENGINEERING REVIEW Denied Per an email to E. Roll and Patricia Gehlen from Bill Biggs where additional rip-rap and a note that the contractor shall call EPNG prior to the work being done must be shown on the plans . A copy of the email text follows:

On Oct 2, 2012, at 4:33 PM, "Patricia Gehlen" <Patricia.Gehlen@tucsonaz.gov> wrote:

> Bill -
>
> Please understand that we are not in a position to make sure the plans we have here match the one that you have provided. You are welcome to come down and look at the plans if you would like.
>
> Please let me know how you want me to proceed.
>
> Thanks
> Trish
>
>>>> "Biggs Jr, William B (Bill)" <William_Biggs@KinderMorgan.com> 10/02/2012 4:16 PM >>>
> Yes, subject to the revision shown on the attachment. The only conditions EPNG will have is the contractor must call EPNG at 520-574-4925 at least 48 hours prior to start of construction in the vicinity of the pipelines.
>
> Thank you very much for cooperating with us on this project.
>
>
> Bill Biggs
> Land and Right of Way
> 520-663-4260 office
> 602-653-9839 mobile
> william_biggs@kindermorgan.com
>
>
>
>
>
> -----Original Message-----
> From: Patricia Gehlen [mailto:Patricia.Gehlen@tucsonaz.gov]
> Sent: Tuesday, October 02, 2012 4:11 PM
> To: Biggs Jr, William B (Bill)
> Subject: RE: Old Vail Road Bus Facility COT DP12-0025
>
> Bill -
>
> So can the City approve the plans?
>
>
> Thanks
> Trish
>
>>>> "Biggs Jr, William B (Bill)" <William_Biggs@KinderMorgan.com>
>>>> 10/02/2012 4:02 PM >>>
> That solution is acceptable to EPNG. I'll send out a conditional approval letter shortly..........
>
> From: Edward Roll [mailto:eroll@wlbgroup.com]
> Sent: Tuesday, October 02, 2012 3:43 PM
> To: Edward Roll; Biggs Jr, William B (Bill)
> Cc: Patricia Gehlen; Gibson, Vickie L; David Little; Noah
> Subject: RE: Old Vail Road Bus Facility COT DP12-0025
>
> Bill,
>
> Per our conversation, we will extend the riprap as shown on our attachment to the north property line of our parcel. I believe this will alleviate your concerns along with complying with your request to do this riprap extension to obtain your approval. Should you require additional information, please advise.
>
> Ed Roll
> Senior Project Manager
> The WLB Group, Inc.
> Engineering * Planning * Surveying * Urban Design * Landscape Architecture Tucson * Phoenix * Flagstaff * Las Vegas * www.wlbgroup.com<http://www.wlbgroup.com>
> 4444 E. Broadway Blvd. * Tucson, AZ 85711-3508
> 520.881.7480 * 520.881.7492 (fax)
> eroll@wlbgroup.com<mailto:eroll@wlbgroup.com>

Final Status

Task End Date Reviewer's Name Type of Review Description
10/17/2012 CPIERCE1 OUT TO CUSTOMER Completed