Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: DP12-0008
Parcel: 137338580

Review Status: Completed

Review Details: DEV PKG

Permit Number - DP12-0008
Review Name: DEV PKG
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/11/2012 GBONILL1 START PLANS SUBMITTED Completed
01/12/2012 RONALD BROWN ADA REVIEW Passed
02/02/2012 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Approved
02/02/2012 RONALD BROWN ZONING HC REVIEW Denied 1. Please provide 1 "Van Accessible" parking space with signage, accessible aisle and access to the accessible route.
2. Decomposed granite is not an acceptable pedesttrian accessible route finish material. Please reference zoning comments.
END OF REVIEW
02/09/2012 LOREN MAKUS ENGINEERING REVIEW Approved
02/09/2012 STEVE SHIELDS ZONING REVIEW Approved
02/14/2012 JOE LINVILLE LANDSCAPE REVIEW Denied 1) Landscaping proposed in right-of-way or MS&R areas must be approved by the City Engineer or designee and comply with the City Engineer's requirements on construction, irrigation, location, and plant type. Provide verification, in writing, of any approvals obtained. Contact Gary Wittwer, DOT Landscape Architect (837-6618) for specific requirements.

2) Revise the landscape plans to include the following standard notes for landscaping in the public right-of-way (if approved):

All planting and irrigation that is proposed within the ROW must receive a permit prior to construction. Plans should be submitted to the City of Tucson Permits and Code section at 201 N. Stone, 4th floor. Once the permit has been approved, the applicant must call for a "Blue Stake " prior to the required pre-construction meeting with the City Landscape Architect, and prior to starting any work.

It is the property owner's responsibility to keep the Sight Visibility Triangles (SVT), and the pedestrian access area clear of vegetation at all times, per Land Use Code (LUC) section 3.7.2.9.

Final plant locations must be in compliance with all utility setback requirements. The owner understands that if the City of Tucson Transportation Department or any utility company needs to work within the ROW in the landscaped area, plants and irrigation may be destroyed without replacement or repair.

The property owner assumes full liability for this landscape and irrigation, and any damage to roadway, sidewalk and utilities within the public right-of-way.

The only private irrigation equipment that is allowed within the ROW is polyethylene type tubing and emitters that are not under constant pressure. All other equipment except for the water meter must be on site.Standard Notes for Planting in ROW
02/15/2012 JOSE ORTIZ COT NON-DSD TRAFFIC Approv-Cond February 15, 2012
ACTIVITY NUMBER: DP12-0008
PROJECT NAME: Headley Midvale Park
PROJECT ADDRESS: Midvale at Headley
PROJECT REVIEWER: Jose E. Ortiz PE, Traffic Engineer

Resubmittal Required: Traffic Engineering recommends a conditional approval of the Development Plan. The following items must be revised or added to the development plan prior to final approval.

1. Illustrate on the plans whether the sidewalk along Elizabeth Drive and Headley Road will be in public right-of-way or in a pedestrian easement.

2. A private improvement agreement (PIA) will be necessary for the proposed work to be performed within the right-of-way. Callout on the plans that the offsite improvements will be reviewed by TDOT through the PIA review process.


If you have any questions, I can be reached at 837-6730 or Jose.Ortiz@tucsonaz.gov
02/15/2012 MARTIN BROWN COT NON-DSD FIRE Approved

Final Status

Task End Date Reviewer's Name Type of Review Description
02/21/2012 FERNE RODRIGUEZ OUT TO CUSTOMER Completed