Permit Review Detail
Review Status: Completed
Review Details: DEV PKG - RESUBMITTAL
Permit Number - DP12-0006
Review Name: DEV PKG - RESUBMITTAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 05/17/2012 | CPIERCE1 | START | PLANS SUBMITTED | Completed | |
| 05/21/2012 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | Comments not resolved. Note that the rim elevation of the upstream manhole or cleanout is needed to determine if a backwater valve is required for the building. Revise the site drawing to include the following information: a. the location and size of the public sanitary sewer b. the location, invert, and rim elevation of the upstream and downstream manholes and cleanouts Reference: City of Tucson Development Standard No. 2-01.0.0, Section 3.8 D and Section 103.2.3, UPC 2006. |
| 06/14/2012 | TERRY STEVENS | ZONING | REVIEW | Approved | |
| 06/14/2012 | RONALD BROWN | HC SITE | REVIEW | Approved | |
| 06/18/2012 | LOREN MAKUS | ENGINEERING | REVIEW | Denied | I will approve the development package once approval from ADOT is provide. I will look at this over-the-counter. Loren Makus |
| 06/18/2012 | ANDREW CONNOR | LANDSCAPE | REVIEW | Denied | 1. A street landscape border, per Sec. 3.7.2.4 of the LUC, is a landscape area with a minimum width of ten (10) feet, running the full length of the street property line(s) bounding the site except for points of ingress-egress. Sidewalks can not be placed within required landscaping along Mission Rd 2. Fifty (50) percent or more of the street landscape border area must have shrubs and vegetative ground cover per LUC 3.7.2.4 3. Indicate square footage of all landscaped areas and calculation of the percentage of vegetative coverage per DS 2-07.2.2.2.g. 4. Note: The screening requirement is in addition to the landscape requirements. The use of vegetation to satisfy the screen requirement is not in any way meant to imply that the vegetative screen can also be used to meet the landscape requirement. 5. The Water Harvestin Implementation Plan shall show how any combination of capture, conveyance, storage, and distribution will be utilized on-site to harvest rainwater. The Water Harvesting summary can only use on-site infiltration areas for calculations. Revise Water Harvesting plan as necessary to include only on-site required landscaping and run-off. 6. The site plan and landscape plan must show identical site layout to avoid conflict between the two plans. Ensure that all changes to the site plan are reflected on the landscape plan. 7. Additional comments may apply. |
| 06/19/2012 | ZELIN CANCHOLA | COT NON-DSD | TRAFFIC | Approved |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 06/22/2012 | GERARDO BONILLA | OUT TO CUSTOMER | Completed |