Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL - CDRC - DEV PLAN
Permit Number - D11-0037
Review Name: RESUBMITTAL - CDRC - DEV PLAN
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
11/10/2011 | JWILLIA4 | START | PLANS SUBMITTED | Completed | |
11/15/2011 | LOREN MAKUS | ENGINEERING | REVIEW | Approved | November 15, 2011 The Engineering Division recommends approval of the Development Plan. Loren Makus, EIT Senior Engineering Associate |
11/16/2011 | RONALD BROWN | H/C SITE | REVIEW | Approved | |
11/16/2011 | JWILLIA4 | PIMA COUNTY | WASTEWATER | Denied | PIMA COUNTY REGIONAL WASTEWATER RECLAMATION DEPARTMENT 201 NORTH STONE AVENUE TUCSON, ARIZONA 85701-1207 JACKSON JENKINS PH: (520) 740-6500 DIRECTOR FAX: (520) 620-0135 November 16, 2011 To: DAN SKEEHAN, P.E. KIMLEY-HORN AND ASSOCIATES, INC Thru: Patricia Gehlen, CDRC Manager City of Tucson Development Services Department ____________________________________________ From: Tom Porter, Sr. CEA (520-740-6719), Pima County Regional Wastewater Reclamation Department Subject: WALMART TUCSON (GOLF LINKS), AZ STORE #5799-00 Dev. Plan – 2nd submittal D11-0037 The Pima County Regional Wastewater Reclamation Department (PCRWRD) has reviewed the proposed sewer collection lines for the above-referenced project. The following comments are offered for your use: 1. Sheet 11: Call out the reference number for the sewer line to be built by others which you are proposing to connect to. Ref. A 2. Sheet 11: The public sewer easement shown on plan must be recorded before development plan approval Ref. A. 2nd Request. This office will require a revised set of bluelines, and a response letter, addressing these comments. Additional comments may be made during the review of these documents. Pima County Code Title 13.20.030.A.2 requires that a wastewater review fee be paid for each submittal of the development plan. The fee for the first submittal is $166 plus $50 per sheet. For the second submittal, the review fee is $50 per sheet. For all subsequent submittals, the review fee is $39 per sheet. The next submittal of this project will be the third(3rd) submittal. A check for the review fee of this submittal in the amount of $39.00 (made out to PIMA COUNTY TREASURER) must accompany the revised set of bluelines and response letter. If the number of sheets changes, please adjust the review fee accordingly. cc: Chad Amateau, PE Checked by:_________ Kristin Greene, PE, DLU Manager DLU Project folder Ref. A. Development Plan Checklist Requirements – Chapter 18.71 of the Pima County Code - Section J http://www.pimaxpress.com/SubDivision/Documents/2006/DP_Requirements2Aug04.pdf Ref. C - Arizona Administrative Code, Title 18, Chapters 5 & 9 (R18-5-205) http://www.azsos.gov/public_services/Title_18/18-05.htm and (R-18-9-E301) http://www.azsos.gov/public_services/Title_18/18-09.htm Ref. D - PCRWRD Procedures, Preliminary Sewer Layout Requirements, 1984 (revised April 1988) http://www.pima.gov/wwm/eng/stddet/pdf/procedures.pdf Ref. E - PCRWRD Design Standards for Public Sewerage Facilities, 1983 (revised April 1988) http://www.pima.gov/wwm/eng/stddet/pdf/design_standards.pdf Ref. F - City of Tucson/Pima County Standard Details http://www.pima.gov/wwm/eng/stddet/pdf/all_det.pdf Ref. G - Pima County Code of Ordinances, Title 13 - Public Services, Division II - Sewers http://library.municode.com/index.aspx?clientID=16119&stateID=3&statename=Arizona Ref. H - City of Tucson/Pima County Standard Specifications for Public Improvements, 2003 Edition http://dot.pima.gov/transeng/stdspecsdet/standardspecs2003.pdf Ref. I - PCRWRD Engineering Directives http://www.pima.gov/wwm/eng/directives/ |
11/17/2011 | JOSE ORTIZ | COT NON-DSD | TRAFFIC | Approved | Resubmittal - Approved by Traffic Engineering TDOT |
11/21/2011 | DAVID RIVERA | ZONING | REVIEW | Approv-Cond | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: David Rivera Principal Planner PROJECT: D11-0037 Walmart - Store No. 5799-00 Development Plan TRANSMITTAL DATE: November 21, 2011 DUE DATE: November 29, 2011 COMMENTS: Please resubmit revised drawings along a response letter, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed. 1. The Zoning Review Section approves the development plan for this project, subject to the following changes on the sign-off copies. However, should there be any changes requested by other CDRC members, the Zoning Review Section approval is void, and we request copies of the revised development plan to verify that those changes do not affect any zoning requirements. 2. Revise the following two (2) items: A. On sheet C4.3, Paving Notes, note 11, add the separation distance or refer to ADA detail on sheet C10.8. B. The short term bicycle detail on C10.8 does not match the plan view drawing. The plan view drawing appears to have separate Short term "LOOP" or inverted "U" type facilities and the detail drawing depicts a facility with connected racks. Revise the detail drawing to match the plan view drawing. 3. Zoning also approves the grading plan as it relates to the Zoning review purview of the grading plan. If the grading requires additional changes due to additional review comments, zoning requests that the grading plan be submitted for zoning review to ensure compliance with the approved development plan. If you have any questions about this transmittal, please call David Rivera, (520) 791-5608. DGR C:\planning\cdrc\developmentplan\D11-0037dp2.doc RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development plan |
11/29/2011 | JOE LINVILLE | LANDSCAPE | REVIEW | Approv-Cond | 1) Revise Grading and Drainage Note 19 on sheet C5.3 to refer to a City of Tucson approved detail or provide a new detail for review. 2) The previous response letter indicates that a detail for a drainage wall opening was provided on sheet C10.1. None was detected. Revise as necessary. |
11/30/2011 | JOHN WILLIAMS | ZONING-DECISION LETTER | REVIEW | Denied | COMMUNITY DESIGN REVIEW COMMITTEE PLANNING & DEVELOPMENT SERVICES November 30, 2011 Dan Skeehan Wal-Mart Stores, Inc. 2210 E. Fort Lowell Rd. #200 Tucson, Arizona 85719 Subject: D11-0037 WAL-MART STORE #5799 Development Plan Dear Dan: Your submittal of October 13, 2011 for the above project has been reviewed by the Community Design Review Committee and the comments reflect the outstanding requirements which need to be addressed before approval is granted. Please review the comments carefully. Once you have addressed all of the comments, please submit the following revised documents and a set of 4 DETAILED cover letters explaining how each outstanding requirement has been addressed: ALL BLACKLINES MUST BE FOLDED 4 Copies Revised Development Plan (Wastewater, Zoning, Landscape, PDSD) 3 Copies Revised Landscape Plan (Zoning, Landscape, PDSD) 1 Check Made out to “Pima County Treasurer” for $39.00 (Wastewater) Should you have any questions, please call me at 837-4893. Sincerely, John Williams Planning Technician All comments for this case are available on our website at http://www.ci.tucson.az.us/dsd/ Via Email: dan.skeehan@kimley-horn.com |