Permit Number: D11-0035
Parcel: 99999999A

Address:
1000 E 22ND ST

Review Status: Completed

Review Details: REVISION - DEV PLAN

Permit Number - D11-0035
Review Name: REVISION - DEV PLAN
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
04/04/2012 FERNE RODRIGUEZ START PLANS SUBMITTED Completed
04/09/2012 DAVID RIVERA ZONING REVIEW Approved
04/19/2012 JASON GREEN ENGINEERING REVIEW Approv-Cond Per this email from TDOT (see below) the upstream basins are to be built and completed prior to CofO for the Retreat Buildings that are affected by the regulatory floodplain. Since no other infomraiton could be obtained through administration this email will have to suffice;

Gentlemen,
Be advised that the construction of the Kino Parkway and 22nd St Overpass Improvements project should begin within a couple of months. The RTA has decided to release this project along with a couple of others. Politics being what they are has caused the start of this project to be delayed longer than we anticipated. We apologize for the anxiety this may have caused those associated with the Retreat development.

The Kino Parkway and 22nd St Overpass Improvement project includes the construction of a detention basin along the west side of Kino Parkway. We understand it is necessary and must be functional in order for the Retreat to get a CO. We believe we can meet the June 2013 date and at worst, be far enough along to detain the regional drainage enough so to not release more flood waters than what the drainage system required of this new downstream development was designed to handle.

We will have a web page dedicated to our project to provide construction updates so that everyone will know where we are throughout the two years it will take to build the road improvements. On it will be contact numbers should anyone need to get verbal confirmation at any time. The detention basin is planned to be constructed during the early phases of the project. We will make sure it is given the attention needed to meet your concerns.

I hope this helps. Contact me if you need more information or if I can be of further assistance.

Fred

Frederick Felix, P.E.
Engr Project Mgr
Tucson DOT
837-6620, cell 400-1205
04/19/2012 JASON GREEN ENGINEERING REVIEW Approv-Cond DO NOT PROVIDE A FINAL CoO OR GRADING INSPECTION UNTIL VERIFICATION WITH THE ENG REVIEWER AND TDOT THAT THE UPSTREAM BASINS ASSOCIATED WITH THE KINO/22ND STREET OVERPASS ARE CONSTRUCTED. THIS PROJECT IS BASED ON THE COMPLETION OF THE UPSTREAM BASINS TO ALLEVIATE THE EXISTING 100-YEAR FLOODPLAIN. JG
04/19/2012 ZELIN CANCHOLA COT NON-DSD TRAFFIC Approv-Cond Add note to right turn lane indicating work to be done by others.
04/19/2012 MARTIN BROWN COT NON-DSD FIRE Approved
04/19/2012 JOE LINVILLE LANDSCAPE REVIEW Approved
04/23/2012 JOHN WILLIAMS ZONING-DECISION LETTER REVIEW Approv-Cond COMMUNITY DESIGN REVIEW COMMITTEE
PLANNING & DEVELOPMENT SERVICES


April 23, 2012

Tri Miller
Rick Engineering Company Inc.
3945 E. Fort Lowell Road # 111
Tucson, Arizona 85712

Subject: D11-0035 THE RETREAT REVISION Development Package

Dear Tri:

The above referenced Development Package has been CONDITIONALLY APPROVED by the Community Design Review Committee. Once the necessary corrections are made, please submit the following documents for sign-off.

1 Rolled COMPLETE SET of the affected sheets of the Development Package. Please include applicable sheets from any other concurrent reviews.

1 CD that contains all of the drainage/hydrology and other reports submitted for the review and approval of this plan (if applicable).

Additional print copies will be made from the complete set and distributed to various review agencies for their files. These copies will be ordered from the City’s contracted print company and billed to you unless you already have an account at another printing company. Please let us know which printing company you would prefer to use and list them on your attached transmittal form when submitting your plans to the CDRC office for sign-off approval.

Plans will not be signed and released until the CDRC office has been notified by PC Addressing that all fees for this plan have been paid. The CDRC office will need this confirmation in writing.

A Development Package remains valid for a period of three (3) years from the date of approval. This Development Package will expire on April 23, 2015 per LUC 5.3.8.2.B.

PLEASE HAVE THE CITY OF TUCSON APPROVAL STAMP PLACED ON EACH SHEET OF THE SUBMITTAL SET, PREFERABLY IN THE LOWER RIGHT HAND CORNER NEAR THE TITLE BLOCK. THE STAMP IS LOCATED AT http://www.tucsonaz.gov/dsd/CDRC___Rezoning/CDRC/CDRC_Stamp/cdrc_stamp.html BLUELINE SETS THAT DO NOT HAVE THE STAMP WILL BE RETURNED FOR CORRECTION.

Should you have any questions, please call me at 837-4893.

Sincerely,



John Williams
Planning Technician

All comments for this case are available on our website at http://www.tucsonaz.gov/dsd/

Via fax: 322-6956