Permit Review Detail
Review Status: Completed
Review Details: REVISION - DEV PLAN
Permit Number - D11-0014
Review Name: REVISION - DEV PLAN
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
04/26/2013 | SPOWELL1 | START | PLANS SUBMITTED | Completed | |
04/26/2013 | RONALD BROWN | ADA | REVIEW | Passed | |
04/26/2013 | ELIZABETH EBERBACH | ENGINEERING | REVIEW | Approv-Cond | Potential ponding issue in the parking area SW of the West Pavilion shall be addressed to allow for runoff to the shallow basin area to the west of parking area. Per email correspondence with EOR, Architect, & Contractor, existing T11BU00620 Reseeding Bond posted by JE Dunn for West Campus shall remain in place for T11BU00620 (for Engineering approval to allow CofO for D11-0014), until remaining West Campus improvements are completed, inspected, and approved by the City. As-builts received 25APR13 show recently installed stormdrain in place. EOR stated 26APR13 that concrete was placed to provide sufficient cover at lower end of pipe; this shall be stated as such in a Substantial Completion letter that needs to be submitted prior to release of any bond. Railing at north end of West Pavilion bldg shall be installed prior to CofO. |
05/02/2013 | KEN BROUILLETTE | FIRE | REVIEW | Approved | |
05/07/2013 | RONALD BROWN | HC SITE | REVIEW | Approved | |
05/08/2013 | PGEHLEN1 | ZONING-DECISION LETTER | WRITE DECISION LETTER | Approv-Cond | Once conditions of approval by Engineering have been addressed, the plans may be signed. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
08/06/2013 | CPIERCE1 | APPROVAL SHELF | Completed |
08/06/2013 | CPIERCE1 | OUT TO CUSTOMER | Completed |