Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: REVISION - DEV PLAN
Permit Number - D11-0013
Review Name: REVISION - DEV PLAN
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 07/12/2012 | FERNE RODRIGUEZ | START | PLANS SUBMITTED | Completed | |
| 08/02/2012 | STEVE SHIELDS | ZONING | REVIEW | Denied | CDRC TRANSMITTAL TO: Planning and Development Services Department Plans Coordination Office FROM: Steve Shields Lead Planner PROJECT: Quebedeaux Auto Dealership Development Plan (Revision) D11-0013 TRANSMITTAL DATE: August 3, 2012 DEVELOPMENT PLAN COMMENTS: Please resubmit revised drawings along a response letter, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed. 1. The phasing calculations are not correct. Phase 1 should include all existing building square footages in the applicable calculations. The lot area that is currently being used should be included in the applicable calculations. Phase 2 should include all existing building square footages in the applicable calculations. The lot area that is currently being used should be included in the applicable calculations. 2. D.S. 2-01.3.9.H.5 Demonstrate on the plan how vehicles access is prevented for the Phase 3 area located in the southwest quadrant of the plan. There does not appear to be any barriers located south and west of the existing Detail Building (7). 3. D.S. 2-01.3.9.H.5.d The bicycle parking calculations are not correct. Per LUC Section 3.3.8.2.B, RETAIL TRADE USE GROUP, Construction Material Sales, Furniture, Carpet, or Appliance Store; Heavy Equipment Sales; and Vehicle Rental and Sales - Short-term required 2, Long-term 1 space per 12,000 sq. ft. GFA. Minimum requirement is 2 spaces. The Long-term bicycle parking calculation is based on gross floor area of all buildings on site. 4. D.S. 2-01.3.9.T The proposed dumpster enclosure called out under keynote 10 will need to be included in the phase 2 as the existing is scheduled to be relocated in phase 2. 5. D.S. 2-01.3.9.X The screen wall, landscape buffer and sidewalk required by re-zoning conditions 11, 16 and 23 will need to be in place by April 14, 2013 see re-zoning condition 8. If you have any questions about this transmittal, please Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.com Sshield1 on DS1/planning/New Development Package/ D11-0013 |
| 08/08/2012 | JOE LINVILLE | LANDSCAPE | REVIEW | Denied | The proposed phasing of the landscape and screening improvements may not be possible for areas reliant on the substitutions and modifications and related conditions approved per DDO-11-74. LUC 5.3.5. Contact Russlyn Wells for additional information on obtaining an updated approval. 520-837-4948 |
| 08/09/2012 | PATRICIA GEHLEN | ZONING-DECISION LETTER | REVIEW | Denied | The review has been completed. Please make requested revisions and resubmit as required. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 08/09/2012 | CINDY AGUILAR | OUT TO CUSTOMER | Completed |