Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL - CDRC - DEV PLAN
Permit Number - D10-0035
Review Name: RESUBMITTAL - CDRC - DEV PLAN
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 02/23/2011 | FERNE RODRIGUEZ | START | PLANS SUBMITTED | Completed | |
| 03/02/2011 | JENNIFER STEPHENS | PIMA COUNTY | ADDRESSING | Approv-Cond | AUDREY FARENGA ADDRESSING REVIEW PH #: 740-6800 FAX #: 623-5411 TO: CITY PLANNING FROM: AUDREY FARENGA, ADDRESSING REVIEW SUBJECT: D10-0035 S.E.C. 1ST ST. & NORRIS AVE/REVISED DEVELOPMENT PLAN DATE: March 2, 2011 The above referenced project has been reviewed by this Division for all matters pertaining to street naming/addressing, and we hereby approve this project. On the final development plan add the section, township and range to all the title blocks. Submit a 24 x 36 Reverse Reading Double Matte Photo Mylar of approved Development Plan to City Planning. Signed and dated Mylar will be forwarded to Pima County Addressing prior to assignment of addresses. |
| 03/07/2011 | JASON GREEN | ENGINEERING | REVIEW | Denied | DATE: March 7, 2011 SUBJECT: 1st Street and Norris Avenue Development Plan- 2nd Engineering Review TO: Patricia Gehlen, CDRC Manager LOCATION: 2012 E 1st St, T143S R14E Sec08, Ward 6 REVIEWERS: Jason Green, CFM ACTIVITY: D10-0035 SUMMARY: Engineering Division of Planning & Development Services Department has received and reviewed the proposed development plan. Engineering Division does not recommend approval of the development plan at this time. The following items need to be addressed: DEVELOPMENT PLAN: 1) DS Sec.2-05.2.2.A.2: Provide the name, address and telephone number under the Project Directory Section for the Civil Engineer who prepared the Drainage Statement for the project. 2) DS Sec.2-05.2.4.D.1: Revise Keynote #3 or plan view to provide a construction detail for the proposed 6-inch extruded curbing at the alley and the new garage. If a separate detail is not provided then the Keynote must clearly state "6"x6" extruded curbing", revise. 3) DS Sec.2-05.2.4.D.3: Revise Keynote #4 to add the word "Specification" to the note. For clarity purposes the note should read "..per COT Standard Specification 5.5.p.1 Section 406, Mix #2 specification." 4) DS Sec.2-05.2.4.G: Provide the recordation information for the new TEP easement shown on the plan (Keynote #41 and #53). The recordation information, location, width, and purpose of all easements must be provided in plan view prior to Development Plan approval. 5) DS Sec.2-05.2.4.K: Revise Keynotes #32 and #33 to either reference PC/COT Standard Detail # 200 or the detail provide on Sheet 2 (Detail 5/2). 6) DS Sec.2-05.2.4.L: Revise Keynote #21 to either reference PC/COT Standard Detail # 200 or the detail provide on Sheet 2 (Detail 5/2). 7) DS Sec.2-05.2.4.R: Revise plan view to correctly dimension the near side sight visibility triangle for the intersection of the Alley and Norris Ave. Keynote #29 shows the right dimension however when scaled in plan view it does not meet the 20'x185' dimensions. 8) DS Sec.2-05.2.4.R: Revise Keynote #51 to correct the typographical error shown for the far side sight visibility triangle. The dimension should read 20'x110', revise. GENERAL COMMENTS: Please provide a revised development plan that addresses the comments provided above. Include a comprehensive response letter addressing in detail responses to all of the above comments. Further comments may be generated upon resubmittal of the development plan review. For any questions or to schedule meetings call me at 837-4929. Jason Green, CFM Senior Engineer Associate Engineering Division Planning & Development Services |
| 03/10/2011 | FERNE RODRIGUEZ | PIMA COUNTY | WASTEWATER | Denied | Pima County Regional Wastewater Reclamation Department Jackson Jenkins Director 201 N. Stone Ave., 8th Floor Tucson, Arizona 85701-1207 PH: (520) 740-6500 FAX: (520) 620-0135 March 9, 2011 To: GENE GOLDSTEIN BRAMIC DESIGN GROUP Thru: Patricia Gehlen, CDRC Manager City of Tucson Development Services Department ____________________________________________ From: Tom Porter, Sr. CEA (520-740-6719), Pima County Regional Wastewater Reclamation Department Subject: S.E.C. 1ST ST. & NORRIS AVE. Development Plan – 3rd Submittal D10-0035 The Pima County Regional Wastewater Reclamation Department (PCRWRD) has reviewed the proposed sewer collection lines for the above-referenced project. The following comments are offered for your use: Sheet 1: Add the following General Note: ANY WASTEWATER DISCHARGED INTO THE PUBLIC SANITARY SEWERAGE SYSTEM SHALL MEET THE REQUIREMENTS OF THE INDUSTRIAL WASTE ORDINANCE (PIMA COUNTY ORDINANCE NO. 1991-140, AS AMENDED). Sheet 1: Add the following Permitting Note: A PROJECT CONSTRUCTION PERMIT MUST BE SECURED FROM PIMA COUNTY WASTEWATER MANAGEMENT DEPARTMENT BEFORE BEGINNING ANY WORK ON THIS PROJECT. Sheet 1: Clearly show the proposed sewer line for the new building per the symbology in the Legend. As shown currently it looks like the new building is served solely by an existing line with no portion of the sewer line as new HCS. This office will require a revised set of bluelines, and a response letter, addressing these comments. Additional comments may be made during the review of these documents. Pima County Code Title 13.20.030.A.2 requires that a wastewater review fee be paid for each submittal of the development plan. The fee for the first submittal is $166 plus $50 per sheet. For the second submittal, the review fee is $50 per sheet. For all subsequent submittals, the review fee is $39 per sheet. The next submittal of this project will be the fourth(4th) submittal. A check for the review fee of this submittal in the amount of $39.00 (made out to PIMA COUNTY TREASURER) must accompany the revised set of bluelines and response letter. If the number of sheets changes, please adjust the review fee accordingly. If you have any questions please call me at the phone number above. cc: Chad Amateau, PE Checked by:______ Kristin Greene, PE, DLU Manager DLU Project folder |
| 03/22/2011 | PATRICIA KRAUSMAN | DESIGN EXAMINER | REVIEW | Denied | Applicant did not respond to comments from January 2011. |
| 03/22/2011 | STEVE SHIELDS | ZONING | REVIEW | Denied | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: Steve Shields Lead Planner PROJECT: 1st Street and Norris Avenue Development Package (2nd Review) D10-0035 TRANSMITTAL DATE: March 22, 2011 DUE DATE: March 24, 2011 DEVELOPMENT PLAN COMMENTS: Please resubmit revised drawings along a response letter, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed. 1. Section 5.3.8.2, LUC, permits a maximum of one year from the date of application to obtain approval of a development package. If, at the end of that time, the development package has not been approved, it must be revised to be in compliance with all regulations in effect at that time, and must be resubmitted for a full CDRC review. The one-year expiration date for this development plan is October 06, 2011. 2. Zoning acknowledges that the Board of Adjustment for Variance has been approved. Provide the following information on the plan; Board of Adjustment Number, Date of Approval, What was Approved, and the conditions of approval on the plan. 3. Demonstrate on the plan how the conditions of the Board of Adjustment for Variance have been addressed. Depending on how the above comments are addressed addition comments may be forth coming. If you have any questions about this transmittal, please Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.com Sshield1 on DS1/planning/New Development Package/ D10-0035 RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development plan. |
| 03/24/2011 | JOE LINVILLE | LANDSCAPE | REVIEW | Approv-Cond | Revise the landscape plans to include the variance case number for reference and revise the plans if necessary to meet any applicable conditions of approval. |
| 03/24/2011 | JOHN WILLIAMS | ZONING-DECISION LETTER | REVIEW | Denied | COMMUNITY DESIGN REVIEW COMMITTEE PLANNING & DEVELOPMENT SERVICES March 24, 2011 Gene Goldstein Bramic Design Group 6255 N. Camino Pimeria Alta # 136 Tucson, Arizona 85718 Subject: D10-0035 1st STREET & NORRIS AVENUE Development Plan Dear Gene: Your submittal of October 7, 2010 for the above project has been reviewed by the Community Design Review Committee and the comments reflect the outstanding requirements which need to be addressed before approval is granted. Please review the comments carefully. Once you have addressed all of the comments, please submit the following revised documents and a set of 8 DETAILED cover letters explaining how each outstanding requirement has been addressed: ALL BLACKLINES MUST BE FOLDED 8 Copies Revised Development Plan (Zoning, Landscape, Engineering, Wastewater, Design Examiner (2), Addressing, PDSD) 6 Copies Revised Landscape Plan (Zoning, Landscape, Engineering, Design Examiner (2), PDSD) 1 Check Made out to "Pima County Treasurer" for $39.00 (Wastewater) 1 CD Full Digital Set of Plans and Elevations on 300dpi Tiff CD (PDSD) Should you have any questions, please call me at 837-4893. Sincerely, John Williams Planning Technician All comments for this case are available on our website at http://www.ci.tucson.az.us/dsd/ Via Email |