Review Status: Completed
Review Details: RESUBMITTAL - CDRC - DEV PLAN
Permit Number - D10-0034
Review Name: RESUBMITTAL - CDRC - DEV PLAN
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
04/01/2011 | FERNE RODRIGUEZ | START | PLANS SUBMITTED | Completed | |
04/04/2011 | ROGER HOWLETT | COT NON-DSD | COMMUNITY PLANNING | Approved | PLANNING AND DEVELOPMENT SERVICES DEPARTMENT COMMENTS Regarding SUBJECT: Community Design Review Committee Application CASE NUMBER: CASE NAME: DATE SENT D10-0034 The District: Development Package 4/4/11 () Tentative Plat (X) Development Plan (X) Landscape Plan () Revised Plan/Plat () Board of Adjustment (X) Other - Elevations CROSS REFERENCE: NEIGHBORHOOD PLAN: University Area Plan, West University Area Plan GATEWAY/SCENIC ROUTE: None COMMENTS DUE BY: 04/18/2011 SUBJECT DEVELOPMENT PLAN/PLAT HAS BEEN REVIEWED BY COMMUNITY PLANNING AND PRESERVATION, AND STAFF SUBMITS THE FOLLOWING COMMENTS: () No Annexation or Rezoning Conditions, Not an RCP - No Comment () Proposal Complies with Rezoning (Special Exception) Conditions () RCP Proposal Complies With Plan Policies () See Additional Comments Attached (X) Approved -No Additional Comments - Complies With Planning Comments Submitted on: 3/15/11 REVIEWER: JBeall 791-5505 DATE: 04/4/2011 |
04/07/2011 | DAVID RIVERA | ZONING | REVIEW | Approv-Cond | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: David Rivera Principal Planner PROJECT: D10-0034 The District - Group Dwelling (Student Housing) Development Plan under the development package process TRANSMITTAL DATE: April 7, 2011 DUE DATE: April 18, 2011 COMMENTS: Conditionally approved 1. Zoning conditionally approves the Development Package as submitted. As of this review there is an understanding that the Development Package will be revised in the near future due to ongoing negotiations with the adjacent landowners. It is further acknowledged that the re-submittal of the development package will include a depiction of the new layout for the northwest area of the site which will include a parking lot and revisions to 5th Avenue street design. A revised Final Plat drawing will be required for review and approval based on the final design which may include the additional parcels under negotiations. Once the revised final plat drawing is revised and approved by Mayor and council the plat will be recorded. Per the PDSD Directors concurrence of Paul J. Iezzi's letter, permits for buildings will be issued for construction assuming that complete zoning approval of the development package is granted and any MDR issues related to an appeal or conditions are addressed. PDSD will place a hold on issuance of permits until such time as complete zoning approval is granted. Once the building permits are issued a hold on issuance of the C of O for all buildings will be placed on all buildings until such time the final plat is recorded. 2. While ADA review is not a zoning purview it was noted that the two of the accessible parking spaces along the west side of building one are not keyed with a note as standard ADA or HC spaces. If one of the spaces is for a van, add a note to state which one will be the van accessible space. The reason this has come up is the angle parking. All van accessible parking spaces must have the access aisle on the passenger side. Please address as required. If you have any questions about this transmittal, please call David Rivera, (520) 791-5608. DGR C:\planning\cdrc\developmentplan\D10-0034dpca.doc |
04/08/2011 | JOE LINVILLE | LANDSCAPE | REVIEW | Approved | |
04/12/2011 | FERNE RODRIGUEZ | PIMA COUNTY | WASTEWATER | Approved | PIMA COUNTY REGIONAL WASTEWATER RECLAMATION DEPARTMENT 201 NORTH STONE AVENUE TUCSON, ARIZONA 85701-1207 JACKSON JENKINS PH: (520) 740-6500 DIRECTOR FAX: (520) 620-0135 April 8, 2011 To: Tri Miller, PE Rick Engineering Thru: Patricia Gehlen, CDRC Manager City of Tucson Development Services Department __________________________ Prepared by: Tom Porter, Sr CEA PCRWRD Checked by: _____ Subject: The District 550 North 5th Avenue Dev. Plan – 3rd Submittal D10-0034 The Pima County Regional Wastewater Reclamation Department (PCRWRD) has reviewed the proposed sewer collection lines for the above-referenced project. The following comments are offered for your use: The Pima County Regional Wastewater Reclamation Department hereby approves the above referenced submittal of the as submitted. cc: Chad Amateau, P.E., PCRWRD Kristin Greene, PE, DLU Manager DLU Project folder |
04/12/2011 | FRODRIG2 | ENV SVCS | REVIEW | Approved | Date Case Number Project Address April 12, 2011 D10-0034 N. 5Th Avenue THE DISTRICT Student Housing Development Plan Comments: The proposed N.5Th Avenue, The District Student Housing Development, Case No.D10-0034. Does not meet the minimum standard requirements for Environmental Services. However, based on the accepted standard modification submitted for this development the proposed plans are approved for Environmental Services, Solid Waste and Recycle collection Standard 6-01. Environmental Services Department Development Plan Review Reviewer: Tony Teran Office Phone (520) 837-3706 E-mail: Tony.Teran @tucsonaz.gov |
04/13/2011 | JOSE ORTIZ | COT NON-DSD | TRAFFIC | Approved | |
04/13/2011 | JOHN WILLIAMS | ZONING-DECISION LETTER | REVIEW | Approv-Cond | COMMUNITY DESIGN REVIEW COMMITTEE PLANNING & DEVELOPMENT SERVICES April 13, 2011 Tri Miller Rick Engineering Company, Inc. 3945 E. Fort Lowell Rd. # 111 Tucson, Arizona 85712 Subject: D10-0034 THE DISTRICT Development Package Dear Tri: The above referenced development plan has been CONDITIONALLY APPROVED by the Community Design Review Committee. Once the necessary corrections are made, please submit the following documents for sign-off. 1 Rolled blue line COMPLETE SET of the Development Package, Landscape Plan, and the Native Plant Preservation Plan (if part of the original submittal). Please include applicable sheets from any other concurrent reviews. 1 CD that contains all of the drainage/hydrology and other reports submitted for the review and approval of this plan. Additional black line copies will be made from the complete set and distributed to various review agencies for their files. These copies will be ordered from the City's contracted print company and billed to you unless you already have an account at another printing company. Please let us know which printing company you would prefer to use and list them on your attached transmittal form when submitting your plans to the CDRC office for sign-off approval. Plans will not be signed and released until the CDRC office has been notified by PC Addressing that all fees for this plan have been paid. The CDRC office will need this confirmation in writing PLEASE HAVE THE CITY OF TUCSON APPROVAL STAMP PLACED ON EACH SHEET OF THE SUBMITTAL SET, PREFERABLY IN THE LOWER RIGHT HAND CORNER NEAR THE TITLE BLOCK. THE STAMP IS LOCATED AT http://www.tucsonaz.gov/dsd/CDRC___Rezoning/CDRC/CDRC_Stamp/cdrc_stamp.html BLUELINE SETS THAT DO NOT HAVE THE STAMP WILL BE RETURNED FOR CORRECTION. Should you have any questions, please call me at 837-4893. Sincerely, John Williams Planning Technician All comments for this case are available on our website at http://www.tucsonaz.gov/dsd/ Via fax: 322-6956 |
04/13/2011 | LAITH ALSHAMI | ENGINEERING | REVIEW | Approved | Laith Alshami, Engineering and Floodplain Review, 04/13/2011, TO: Patricia Gehlen FROM: Laith Alshami, P.E. CDRC Engineering SUBJECT: The District D10-0034, T14S, R13E, SECTION 12 RECEIVED: Development Plan Package and Drainage Report on April 04, 2011 The subject project has been reviewed. The Drainage Report is acceptable and it is approved. The Development Package is recommended for approval pertaining to Engineering and Floodplain Review. |