Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL - CDRC - DEV PLAN
Permit Number - D10-0032
Review Name: RESUBMITTAL - CDRC - DEV PLAN
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 01/07/2011 | RONALD BROWN | ADA | REVIEW | Approved | |
| 01/12/2011 | FERNE RODRIGUEZ | COT NON-DSD | TUCSON POLICE DEPARTMENT | Approved | >>> Rebecca Noel 01/12/2011 3:02 PM >>> I have no issues with this proposal at this time. CSO Becky Noel #37968 Tucson Police Dept 837-7428 |
| 01/13/2011 | FERNE RODRIGUEZ | PIMA COUNTY | WASTEWATER | Denied | PIMA COUNTY REGIONAL WASTEWATER RECLAMATION DEPARTMENT 201 NORTH STONE AVENUE TUCSON, ARIZONA 85701-1207 MICHAEL GRITZUK, P.E. PH: (520) 740-6500 DIRECTOR FAX: (520) 620-0135 January 12, 2011 To: Joesph Vaskovic Parsons Brinckerhoff Thru: Patricia Gehlen, CDRC Manager City of Tucson Development Services Department ____________________________________________ From: Tom Porter, Sr CEA, (520-740-6719), Pima County Regional Wastewater Reclamation Department Subject: Houghton Road and Broadway Boulevard Park & Ride Dev. Plan – 2nd Submittal D10-0032 The Pima County Regional Wastewater Reclamation Department (PCRWRD) has reviewed the proposed sewer collection lines for the above-referenced project. The following comments are offered for your use: All of the applicable General and Permitting Sewer Notes are missing, refer to Pima County Development Services “Development Plan Review, Checklist Requirements” section J. WASTEWATER, for submittal requirements. The checklist is available at; http://www.pimaxpress.com/SubDivision/Documents/DevPlanReq.pdf Create a Legend with symbols for proposed and existing sewer lines/manholes and cleanouts. Create a public sewer ingress/egress blanket access easement over the PAAL’s on site. Sheet 9 and 10: Show the parking locations on plan. As shown it is unclear exactly where the existing manholes are in relation to the proposed parking spaces. Sheet 10: Show depressed curb fronting MH#3858-03 on both sides. Sheet 9: Show the existing sewer invert at crossing in relation to the drainage basin invert. Pima County Code Title 13.20.030.A.2 requires that a wastewater review fee be paid for each submittal of the development plan. The fee for the first submittal is $166 plus $50 per sheet. For the second submittal, the review fee is $50 per sheet. For all subsequent submittals, the review fee is $39 per sheet. The next submittal of this project will be the third (3rd ) submittal. A check for the review fee of this submittal in the amount of $78.00 (made out to PIMA COUNTY TREASURER) must accompany the revised set of bluelines and response letter. If the number of sheets changes, please adjust the review fee accordingly. This comment letter has been reviewed and accepted for substantial conformance to Pima County Code Title 13 by: ___________________________ Chad Amateau, P.E., Civil Engineer PCRWRD, Planning Services Section, Development Liaison Unit cc: Kristin Greene, PE, DLU Manager DLU Project folder |
| 01/19/2011 | STEVE SHIELDS | ZONING | REVIEW | Approv-Cond | CDRC TRANSMITTAL TO: Planning and Development Services Department Plans Coordination Office FROM: Steve Shields Lead Planner PROJECT: Houghton Road & Broadway Blvd. Park & Ride Development Package (2nd Review) D10-0032 TRANSMITTAL DATE: January 19, 2011 DUE DATE: January 28, 2011 DEVELOPMENT PLAN COMMENTS: Please resubmit revised drawings along a response letter, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed. 1. The Zoning Review Section conditionally approves the development package for this project, subject to the following changes on the sign-off copies. However, should there be any changes requested by other CDRC members, the Zoning Review Section approval is void, and we request copies of the revised development plan to verify that those changes do not affect any zoning requirements. The following comments are based on the Development Package Submittal Requirements: 1. This comment was not addressed correctly. The site and grading details should follow the grading plan. The drawing order does not follow the Development Package Submittal Requirements. The details should follow the grading plan and the SWPP should follow the landscape planting details. The following comments are based on the Development Standard 2-01.0: 1. This comment was not addressed. D.S. 2-01.3.7.A.4 Add development designator "29" the General Note 3 next to the proposed use. 2. If applicable ensure all changes are made to the grading and landscape plans. If you have any questions about this transmittal, please Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.com Sshield1 on DS1/planning/New Development Package/ D10-0032 RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development plan. CDRC TRANSMITTAL TO: Planning and Development Services Department Plans Coordination Office FROM: Steve Shields Lead Planner PROJECT: Houghton Road & Broadway Blvd. Park & Ride Development Package (2nd Review) T10BU01438 TRANSMITTAL DATE: January 19, 2011 DUE DATE: January 28, 2011 GRADING PLAN COMMENTS: Please resubmit revised drawings along a response letter, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed. 1. The grading plan has been reviewed by Zoning Review Section but cannot approve the plan until it has been approved by the Engineering, and Landscape Review Sections and until all zoning comments or concerns have been addressed. 2. Zoning cannot approve the grading plan until the development package has been approved. If you have any questions about this transmittal, please Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.com RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package |
| 01/26/2011 | FRODRIG2 | ENV SVCS | REVIEW | Approved | Date Case Number Project Address January 26, 2011 D10-0032 Houghton Road and Broadway Boulevard PARK AND RIDE DEVELOPMENT PLAN Comments: The proposed Development Plan for the New PARK AND RIDE DEVELOPMENT PLAN, Case No.10-0032, meets the minimum requirements for the Environmental Services Solid Waste and Recycle Disposal Standard 6-01.and is here Approved. Environmental Services Department Development Plan Review Reviewer: Tony Teran Office Phone (520) 837-3706 E-mail: Tony.Teran @tucsonaz.gov |
| 01/27/2011 | LOREN MAKUS | ENGINEERING | REVIEW | Approved | January 27, 2011 D10-0032 Development Package The engineering division recommends approval of the Development Package. Loren Makus, EIT Senior Engineering Associate |
| 01/31/2011 | JOE LINVILLE | LANDSCAPE | REVIEW | Approv-Cond | Revise all of the plan sheets to include the current Development Plan case number D10-0032. |
| 02/01/2011 | JOHN WILLIAMS | ZONING-DECISION LETTER | REVIEW | Denied | COMMUNITY DESIGN REVIEW COMMITTEE PLANNING & DEVELOPMENT SERVICES February 1, 2011 Joseph A. Vaskovic Parsons Brinckerhoff Quade & Douglas, Inc. 177 N. Church Avenue, # 500 Tucson, Arizona 85701 Subject: D10-0032 HOUGHTON RD & BROADWAY BLVD PARK AND RIDE Development Package Dear Joseph: Your submittal of September 15, 2010 for the above project has been reviewed by the Community Design Review Committee and the comments reflect the outstanding requirements which need to be addressed before approval is granted. Please review the comments carefully. Once you have addressed all of the comments, please submit the following revised documents and 4 sets of the DETAILED cover letter explaining how each outstanding requirement has been addressed: ALL BLACKLINES MUST BE FOLDED 4 Copies Revised Development Package (Wastewater, Zoning, Landscape, PDSD) 1 Check Made out to "Pima County Treasurer" for $78.00 (Wastewater) Should you have any questions, please call me at 837-4893. Sincerely, John Williams Planning Technician All comments for this case are available on our website at http://www.tucsonaz.gov/dsd/ Via fax: (520) 882-8830 |
| 12/29/2010 | JWILLIA4 | START | PLANS SUBMITTED | Completed |