Permit Number: D09-0029
Parcel: 11720029A

Address:
260 S CHURCH AV

Review Status: Completed

Review Details: RESUBMITTAL - CDRC - DEV PLAN

Permit Number - D09-0029
Review Name: RESUBMITTAL - CDRC - DEV PLAN
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/29/2010 FERNE RODRIGUEZ START PLANS SUBMITTED Completed
01/29/2010 RONALD BROWN ZONING HC REVIEW Passed
02/02/2010 JIM EGAN COT NON-DSD FIRE Approved
02/05/2010 PGEHLEN1 ENV SVCS REVIEW Approved Dates Case Number Project Address
Issued by DSD January 29, 2010 D09-0029 260 S. Church Ave. Tucson, AZ 85713
Due Date February 22, 2010
Date Received at Pioneer February 3, 2010
Date Reviewed and Comments submitted to DSD: February 3, 2010
Comments: Approved By Environmental Services Department, February 3, 2010
02/09/2010 TOM FISHER COT NON-DSD TDOT Approved
02/10/2010 LAITH ALSHAMI ENGINEERING REVIEW Approved Laith Alshami, Engineering and Floodplain Review, 02/10/2010,

TO: Patricia Gehlen FROM: Laith Alshami, P.E.
CDRC Engineering

SUBJECT: Tucson Hotel and Convention Center
D09-0029, T14S, R13E, SECTION 13

RECEIVED: Development Package and Drainage Report on January 29, 2010


The subject submittal has been reviewed. The Drainage Report is acceptable for Development Package purposes and it is hereby approved. Additional drainage information may be required during site grading. The Development Package is recommended for approval pertaining to Engineering and Floodplain Review.
02/11/2010 RONALD BROWN ADA REVIEW Denied GENERAL
1. OK
2. OK
SHEET NOS. 6 THROUGH 10
3. OK
4. OK
SHEET 7
5. OK
6. OK
7. OK
8. OK
9. OK
SHEET 8
10. OK

11. At the striped pedestrian area located on the lower end of the East side, please provide a pedestrian (accessible route) separation as per ADAAG, section 4.29.5.

RESUBMITTAL COMMENT:
1. THIS AREA IS AN ACCESS FROM THE EXHIBIT HALL AND THE MEETING ROOMS TO THE PARKING AND IS ACCESSIBLE TO ALL. THIS ACCESSIBLE PEDESTRIAN AREA NEEDS TO BE SEPARATED FROM THE HAZARDOUS VEHICLE TRAFFIC AREA (PAAL) AS PER SECTION 4.29.5.
2. SIMILAR AREAS ON LEVEL 3 OF THE PARKING GARAGE INCLUDING THE STAIR ACCESS NEED ALSO TO COMPLY.
3. WE HAD DISCUSSED THIS IN OUR PREVIOUS MEETING AND AN EVALUATION FROM MARTY DUPONT WAS TO BE OBTAINED.

SHEET NOS 9 AND 10 (SHOULD READ 10 AND 11)
12. ok
c. Please clarify that the passenger loading zone is compliant with IBC 2006, section 1106.7 and ADAAG, section 4.6.6.

SUBMITTAL COMMENTS:
1. THE REFERENCE TO 2006 IBC COMES INTO PLAY AS TO HOW MANY OF THESE SPACES ARE TO BE PROVIDED, SECTION 1106.7.1 CONTINOUS LOADING ZONES, SPECIFIES 1 PER VERY 100 LINEAR FEET. ADAAG DOES NOT SPECIFY A QUANTITY.

13. OK
14. OK

END OF REVIEW
02/11/2010 STEVE SHIELDS ZONING REVIEW Approved CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: Steve Shields
Lead Planner

PROJECT: Tucson Hotel and Convention Center
Development Package (3rd Review)
D09-0029

TRANSMITTAL DATE: February 11, 2010

DUE DATE: February 22, 2010

DEVELOPMENT PLAN COMMENTS: Please resubmit revised drawings along a response letter, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed.

1. The Zoning Review Section approves the development package for this project. However, should there be any changes requested by other CDRC members, the Zoning Review Section approval is void, and we request copies of the revised development package to verify that those changes do not affect any zoning requirements.

If you have any questions about this transmittal, please Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.com

Sshield1 on DS1/planning/ D09-0029

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package and approved PAD document.
02/11/2010 JOSE ORTIZ COT NON-DSD TRAFFIC Approved
02/17/2010 JOE LINVILLE LANDSCAPE REVIEW Approved
02/17/2010 ROGER HOWLETT COT NON-DSD COMMUNITY PLANNING Approved PLANNING AND DEVELOPMENT SERVICES DEPARTMENT
COMMENTS

Regarding

SUBJECT: Community Design Review Committee Application

CASE NUMBER: CASE NAME: DATE SENT

D09-0029 Tucson Hotel and Convention Center - PAD-5

() Tentative Plat
(X) Development Plan
(X) Landscape Plan
() Revised Plan/Plat
() Board of Adjustment
() Other - Elevations

CROSS REFERENCE:

NEIGHBORHOOD PLAN: Tucson Community PAD-5

GATEWAY/SCENIC ROUTE: NO

COMMENTS DUE BY: 02/22/10

SUBJECT DEVELOPMENT PLAN/PLAT HAS BEEN REVIEWED BY COMMUNITY PLANNING AND PRESERVATION, AND STAFF SUBMITS THE FOLLOWING COMMENTS:

() No Annexation or Rezoning Conditions, Not an RCP - No Comment
() Proposal Complies with Annexation or Rezoning Conditions
() RCP Proposal Complies With Plan Policies
() See Additional Comments Attached
(X) No Additional Comments - Complies With Planning Comments Submitted on: 08/18/09







REVIEWER: msp 791-5505 DATE: 02/17/10
02/23/2010 TOM MARTINEZ OTHER AGENCIES AZ DEPT TRANSPORTATION Approved ADOT, Regional Traffic Engineering, has these comments on this submittal:


* Where, in the report, is there an analysis of the I 10 ramps at Congress and how will the development affect their operation.
* What mitigation will be needed in the intersection with the current counts on the frontage road, please describe in the report?
* Will signals in the intersection need to be modified in any way?

Thank you.

________________________________
Confidentiality and Nondisclosure Notice: This email transmission and any attachments are intended for use by the person(s)/entity(ies) named above and may contain confidential/privileged information. Any unauthorized use, disclosure or distribution is strictly prohibited. If you are not the intended recipient, please contact the sender by email, and delete or destroy all copies plus attachments.
.
02/23/2010 PGEHLEN1 COT NON-DSD TUCSON POLICE DEPARTMENT Approved
02/23/2010 FERNE RODRIGUEZ PIMA COUNTY WASTEWATER Approved February 3, 2010

To: Dan Castro
Rick Engineering Company, Inc.

Thru: Patricia Gehlen, CDRC Manager
City of Tucson Development Services Department

From: Tom Porter, Sr. CEA (520-740-6719), representing the Pima County Departments of Regional Wastewater Reclamation Department and Environment Quality

Subject: Tucson Hotel & Convention Center
Dev. Plan – 3rd Submittal
D09-029


The proposed sewer collection lines for the above-referenced project have been reviewed on behalf of the Pima County Department of Environmental Quality (PDEQ) and the Pima County Regional Wastewater Reclamation Department (PCRWRD). This review letter may contain comments pertaining to the concerns of either Department. The following comments are offered for your use.

The Pima County Department of Environmental Quality and Regional Wastewater Reclamation Department hereby approve the above referenced submittal of the development plan as submitted.

Please note the following: Approval of the above referenced submittal does not authorize the construction of public or private sewer collection lines, or water distribution lines. Prior to the construction of such features, a Construction Authorization (Approval To Construct) may need to be obtained from the Pima County Environmental Quality.

Also, air quality activity permits must be secured by the developer or prime contractor from the Pima County Department of Environmental Quality before constructing, operating or engaging in an activity which may cause or contribute to air pollution.


If you have any questions regarding the above-mentioned comments, please contact me.
02/23/2010 TOM MARTINEZ OTHER AGENCIES AZ DEPT TRANSPORTATION Approved Daniel -

ADOT will include the letter as part of the TIA and recommend the Tucson
Hotel and Convention Center project be approved by the CDRC. Thank you.
TM.
03/04/2010 JOHN WILLIAMS ZONING-DECISION LETTER REVIEW Approv-Cond COMMUNITY DESIGN REVIEW COMMITTEE
PLANNING & DEVELOPMENT SERVICES
*** REVISION ***

March 4, 2010

Dan Castro
Rick Engineering Company
3945 E. Fort Lowell Road # 111
Tucson, Arizona 85712

Subject: D09-0029 Tucson Hotel & Convention Center Development Package

Dear Dan:

The above referenced development plan has been CONDITIONALLY APPROVED by the Community Design Review Committee. Once the necessary corrections are made per ADA, please submit the following documents for sign-off.

1 Rolled blue line COMPLETE SET of the Development Package, Landscape Plan, and the Native Plant Preservation Plan (if part of the original submittal). Please include applicable sheets from any other concurrent reviews.

1 Rolled blue line set of the Development Package.

1 CD that contains all of the drainage/hydrology and other reports submitted for the review and approval of this plan.

The additional copies that will be made from the complete set will be distributed to various review agencies for their files. These additional copies will be ordered from the City's contracted print company and billed to you unless you already have an account at another printing company. Please let us know which printing company you would prefer to use and list them on your attached transmittal form when submitting your plans to the CDRC office for sign-off approval.

PLEASE HAVE THE CITY OF TUCSON APPROVAL STAMP PLACED ON EACH SHEET OF THE SUBMITTAL SET, PREFERABLY IN THE LOWER RIGHT HAND CORNER NEAR THE TITLE BLOCK. THE STAMP IS LOCATED AT http://www.tucsonaz.gov/dsd/CDRC___Rezoning/CDRC/CDRC_Stamp/cdrc_stamp.html BLUELINE SETS THAT DO NOT HAVE THE STAMP WILL BE RETURNED FOR CORRECTION.

Should you have any questions, please call me at 837-4917.
Sincerely,



John Williams
Planning Technician

All comments for this case are available on our website at http://www.tucsonaz.gov/dsd/

Via fax: (520) 322-6956