Permit Number: D09-0028
Parcel: 13303301A

Review Status: Completed

Review Details: REVISION - DEV PLAN

Permit Number - D09-0028
Review Name: REVISION - DEV PLAN
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
07/08/2010 FERNE RODRIGUEZ START PLANS SUBMITTED Completed
07/09/2010 JIM EGAN COT NON-DSD FIRE Approved
07/19/2010 FRODRIG2 ENV SVCS REVIEW Approved Due Date Case Number Project Address
July 22, 2010 D09-0028 The Place at Tanque Verde Creek
DEVELOPMENT PLAN

Comments: This Development Plan meets the requirements of the Solid Waste Disposal
Standard 6-01.0 an therefore, is here Approved.

Environmental Services Department
Development Plan Review
Reviewer: Tony Teran
Office Phone (520) 837-3706
E-mail: Tony.Teran @tucsonaz.gov
07/19/2010 STEVE SHIELDS ZONING REVIEW Denied CDRC TRANSMITTAL

TO: Planning and Development Services Department
Plans Coordination Office

FROM: Steve Shields
Lead Planner

PROJECT: The Place At Tanque Verde Creek
Development Plan (Revision)
D09-0028

TRANSMITTAL DATE: July 19, 2010

DUE DATE: July 22, 2010

DEVELOPMENT PLAN COMMENTS: Please resubmit revised drawings along a response letter, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed.


1. As it appears that a lot split is proposed the lot split must be complete prior to approval of the revision to the development plan.

2. As it appears that a lot split is proposed provide all required calculations for Parcel 2 as it will we a separate parcel.

3. D.S. 2-05.2.4.D.3 At the northern and southern area where the phase/parcel line crosses the parking area access lane provide some type of barrier to prevent vehicles from accessing unimproved area, see D.S. 3-05.2.3.C1

4. D.S. 2-05.2.4.D.3 At the northern area where the phase/parcel line crosses the parking area access lane provide a backup spur that meets the requirements of D.S. 3-05.2.2.D.

If you have any questions about this transmittal, please Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.com

Sshield1 on DS1/planning/ D09-0028

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development plan.
07/20/2010 RONALD BROWN ZONING HC REVIEW Denied 1. Please note governing accessibility code for private property is the 2006 IBC, Chapter 11 and ICC (ANSI) 117.1
2. Please note governing authority for all accessibility in the public right of way is the City of Tucson, Department of Transportation.
3. Pedestrian routes to the dumpster areas are not required to be accessible. Please remove all curb ramps and detectable warnings at these areas and maintain a 6" high concrete curb.
4. At detail 9/7of 7, the connecting ramp to the public right of way at Speedway, please comply with 2006 IBC, ICC (ANSI 117.1) Section 405.7.4; ramps that change direction at the landing shall have a turning space as per 304.4, 5' x 5' square.
5. Detectable warnings are not required at the accessible parking aisles. These are safe zones void of hazardous vehicle traffic. Please remove the detectable warnings.
6. Of the 13 accessible parking spaces, provide, 1 of every six and a fraction thereof as "Van Accessible". Three "Van Accessible" spaces will be required. Please identify these space on sheets 2 and 3.
END OF REVIEW


END OF REVIEW
07/20/2010 LAITH ALSHAMI ENGINEERING REVIEW Denied Laith Alshami, Engineering and Floodplain Review, 07/20/2010,

TO: Patricia Gehlen FROM: Laith Alshami, P.E.
CDRC Engineering

SUBJECT: The Place at Tanque Verde Creek
D09-0028, Ref. S07-082, T14S, R15E, SECTION 02

RECEIVED: Revised Development Plan on July 08, 2010

The subject submittal has been reviewed. The proposed project phasing is acceptable, however Zoning comments must be addressed satisfactorily before the revised Development Plan is recommended for approval pertaining to Engineering and Floodplain Review.
07/23/2010 JOE LINVILLE LANDSCAPE REVIEW Approved
07/23/2010 JOHN WILLIAMS ZONING-DECISION LETTER REVIEW Denied COMMUNITY DESIGN REVIEW COMMITTEE
PLANNING & DEVELOPMENT SERVICES

July 23, 2010

Jean Armstrong
Baker & Associates Engineering, Inc.
3561 E. Sunrise Dr. # 225
Tucson, Arizona 85718

Subject: D09-0028 The Place @ Tanque Verde Development Plan Revision

Dear Jean:

Your submittal of July 1, 2010 for the above project has been reviewed by the Community Design Review Committee and the comments reflect the outstanding requirements which need to be addressed before approval is granted. Please review the comments carefully. Once you have addressed all of the comments, please submit the following revised documents and a set of 4 DETAILED cover letters explaining how each outstanding requirement has been addressed:

ALL BLACKLINES MUST BE FOLDED

4 Copies Revised Development Plan (Zoning, HC Site, Engineering, PDSD)


Should you have any questions, please call me at 837-4917.


Sincerely,






John Williams
Planning Technician

All comments for this case are available on our website at http://www.ci.tucson.az.us/dsd/