Permit Review Detail
Review Status: Completed
Review Details: REVISION - DEV PLAN
Permit Number - D09-0023
Review Name: REVISION - DEV PLAN
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 11/19/2012 | CPIERCE1 | START | PLANS SUBMITTED | Completed | |
| 11/20/2012 | JOSE ORTIZ | COT NON-DSD | TRAFFIC | Approved | |
| 11/20/2012 | RONALD BROWN | ADA | REVIEW | Passed | |
| 11/21/2012 | STEVE SHIELDS | ZONING | REVIEW | Denied | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: Steve Shields Lead Planner PROJECT: The Salvation Army Hospitality House Development Plan (Revision) D09-0023 TRANSMITTAL DATE: November 26, 2012 DEVELOPMENT PLAN COMMENTS: Please resubmit revised drawings along a response letter, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed. 1. D.S. 2-05.2.4.C As it appears that some of the vehicle parking spaces are now going to be provided in Phase 2 provide a phased vehicle parking calculations. 2. D.S. 2-05.2.4.C As it appears that some of the vehicle parking spaces are now going to be provided in Phase 2 provide a phased lot coverage calculation. 3. D.S. 2-05.2.4.D.3 As it appears that some of the vehicle parking spaces are now going to be provided in Phase 2 demonstrate on the plan how vehicles will be prevented from accessing the unimproved area at the east end of the south parking area. A back-up spur will be required. 4. D.S. 2-05.2.4.M The following general notes need to be revised to reflect the proposed changes to building square footage, 2B & 2E 5. D.S. 2-05.2.4.M If the "ASPHALT" area shown north of the "Hospitality House" is vehicle use area show that area as included in the lot coverage calculation. If you have any questions about this transmittal, please Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.com Sshield1 on DS1/planning/ D09-0023 RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development plan. |
| 11/23/2012 | JOHN BEALL | COT NON-DSD | COMMUNITY PLANNING | Passed | Defer to Rezoning. |
| 11/23/2012 | GARY WITTWER | COT NON-DSD | TDOT | Approv-Cond | I have reviewed the above noted plan and only have one comment. Please add a note to the landscape plans that stated: The contractor is required to obtain a Right-of-Way permit for work in the ROW. I could not find it. All other required notes are there. |
| 11/30/2012 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | Revise the site drawing to include the following information: a. the location and size of the water meter and backflow preventer b. the location of the gas meter (if one exists or is planned) c. the location, invert, and rim elevation of the upstream manhole Reference: City of Tucson Development Standard No. 2-01.0.0, Section 3.8 D and Section 103.2.3, UPC 2006. |
| 12/03/2012 | RONALD BROWN | ZONING HC | REVIEW | Denied | SHEET DP1.0 1. At details 5 and 7: Show max slope in all directions not to exceed 2%, reference ICC A1171. Section 502.5. 2. At detail 4, change the 5'-0" dimension to 7'-0". Adjust the 6'-8" dimension accordingly. SHEET DP1.1 3. Zoning may required a pedestrian access to the 1st Street pedestrian way. If so, this pedestrian must be accessible. Please verify with Zoning. 4. Assure that all slopes of all accessible routes comply with ICC A117.1, Section 403.3; 5% max running slope and 2% max cross slope. END OF REVIEW |
| 12/04/2012 | ELIZABETH LEIBOLD | ENGINEERING | REVIEW | Approved | DATE: December 3, 2012 TO: Jeff Hunt, P.E. REVIEWER: Elizabeth Leibold, PE SUBJECT: Salvation Army Engineering Review - Revision #1 ADDRESS: 1002 N Main Av LOCATION: T14S R13E Sec12 FLOODPLAIN STATUS: X-unshaded zone, 2276L CASE NUMBER: D09-0023 SUMMARY: The Revision to development plan for the Salvation Army was submitted with changes to zoning related items (ie. Building square footage) as well as changes to the proposed finished floor elevations. Engineering Division of Planning & Development Services Department has received and reviewed the revision for the Development Plan including plan sheets dp1.0, dp1.1, dp1.2, landscape plans, and Drainage Statement for Salvation Army Hospitality House (Cyprus Civil Development, Jeffrey P. Hunt, P.E. 10.11.2012). The Transitional Family Apartments on the east side of the project (labeled as Building #2) was approved previously with a minimum finished floor of 2363.0. The Revision set of plans show a FFE of 2362.0. Due to adjacent jurisdictional floodplain limits showing a base flood elevation of 2360.6 (extrapolated), the proposed FFE is acceptable. Engineering Division recommends approval of the Revision #1 of the approved Development Plan with the following suggestions for the grading submittal. Please be aware that a grading permit application will be needed to be submitted, reviewed and approved prior to commencement of construction activity. Building permits are also required. GRADING PERMIT CONSIDERATIONS: 1) Submit Floodplain Use permit application with grading permit application. 2) Submit Drainage Statement clarifying that elevation certificates will be required for each structure. 3) Provide additional proposed spot elevations in the sidewalk areas adjacent to building structure and within accessibility stalls and routes to clarify that maximum slopes have not been exceeded. If you have questions, call me at 837-4934. Elizabeth Leibold, P.E., CPM, CFM Civil Engineer Engineering Division Planning & Development Services Department |
| 12/04/2012 | KBROUIL1 | COT NON-DSD | FIRE | Denied | Would you please indicate the location of the existing or proposed fire hydrants for this project? If they are already noted on a page, then please tell me what page number. |
| 12/06/2012 | PGEHLEN1 | COT NON-DSD | TUCSON POLICE DEPARTMENT | Denied | I cannot approve this until I view the plans for the lighting. I failed to find any plans of lighting in the Development Review. CSO Becky Noel #37968 Tucson Police Dept 837-7428 |
| 12/07/2012 | JOE LINVILLE | NPPO | REVIEW | Approved | |
| 12/07/2012 | JOE LINVILLE | LANDSCAPE | REVIEW | Approved | |
| 12/07/2012 | PATRICIA GEHLEN | ZONING-DECISION LETTER | REVIEW | Denied | This review has been completed. Revision is required. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 02/01/2013 | CPIERCE1 | REJECT SHELF | Completed |