Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: CORE REVIEW
Permit Number - D09-0016
Review Name: CORE REVIEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/01/2009 | FERNE RODRIGUEZ | START | PLANS SUBMITTED | Completed | |
05/01/2009 | RONALD BROWN | ADA | REVIEW | Passed | NOT A COT OWNED/OPERTED PROPERTY |
05/04/2009 | RONALD BROWN | ZONING HC SITE | REVIEW | Denied | 1. need to provide an accessible route to the entry of the new animal wash facility. This will probably include a marked crossing and concrete refuge walkways as required by Zoning. Reference Zoning comments. a. Provide all ramps, required slopes and detectable warnings as per ICC/ANSI 117.1. |
05/04/2009 | JIM EGAN | COT NON-DSD | FIRE | Approved | |
05/13/2009 | FERNE RODRIGUEZ | PIMA COUNTY | WASTEWATER | Denied | May 12, 2009 To: ROBERT E PAGE ROBERT PAGE, ARCHITECT Thru: Patricia Gehlen, CDRC Manager City of Tucson Development Services Department ____________________________________________ From: Tom Porter, Sr. CEA (520-740-6719), representing the Pima County Departments of Regional Wastewater Reclamation Department and Environment Quality Subject: RITA ROAD CARWASH & MINI-STORAGE Dev. Plan - 1st Submittal D09-016 The proposed sewer collection lines for the above-referenced project have been reviewed on behalf of the Pima County Department of Environmental Quality (PDEQ) and the Pima County Regional Wastewater Reclamation Department (PCRWRD). This review letter may contain comments pertaining to the concerns of either Department. The following comments are offered for your use. Sheet 1: Show the existing public sewer line on or near the property and include the pipe size and construction plan #. Also show the existing public manholes and include the IMS# with rim and invert elevations. Sheet 1: Show how the existing buildings are connected to the public sewer and mark the lines as existing private sewer. Also show the pipe size. Sheet 1: If no new sewer is proposed then include the following general note: THE ON-SITE SEWERS ARE EXISTING AND PRIVATE. NO NEW SEWERS ARE PROPOSED. Sheet 1: If new sewer is proposed then show it on plan and include all of the required general sewer notes which can be found on line @ Pima County Development Services “Development Plan Review, Checklist Requirements” section J. WASTEWATER, for submittal requirements. The checklist is available at; http://www.pimaxpress.com/SubDivision/Documents/DevPlanReq.pdf This office will require a revised set of bluelines, and a response letter, addressing these comments. Additional comments may be made during the review of these documents. Pima County Code Title 13.20.030.A.2 requires that a wastewater review fee be paid for each submittal of the . The fee for the first submittal is $166 plus $50 per sheet. For the second submittal, the review fee is $50 per sheet. For all subsequent submittals, the review fee is $39 per sheet. The next submittal of this project will be the second (2nd) submittal. A check for the review fee of this submittal in the amount of $50.00 (made out to PIMA COUNTY TREASURER) must accompany the revised set of bluelines and response letter. If the number of sheets changes, please adjust the review fee accordingly. If you have any questions regarding the above-mentioned comments, please contact me. |
05/21/2009 | LIZA CASTILLO | UTILITIES | TUCSON ELECTRIC POWER | Approved | 4350 E. Irvington Road, Tucson, AZ 85714 Post Office Box 711, Tucson, AZ 85702 WR#210878 May 20, 2009 Dear Mr. Page : SUBJECT: Rita Road Carwash/ Mini Storage D09-0016 Tucson Electric Power Company has reviewed and approved the development plan submitted May 7, 2009 It appears that there are no conflicts with the existing facilities within the boundaries of this proposed development. Enclosed is a copy of a TEP facilities map showing the approximate location of the existing facilities. All relocation costs will be billable to the customer. In order to apply for electric service, call the New Construction Department at (520) 918-8300. Submit a final set of plans including approved site, offsite and electrical load plans. Include a CD with the AutoCAD version of the plans. If easements are required, they will be secured by separate instrument. Your final plans should be sent to: Tucson Electric Power Company Attn: Richard Harrington New Business Project Manager P. O. Box 711 (DB-101) Tucson, AZ 85702 520-917-8726 Please call the area Designer Warren McElyea at (520) 918-8268, should you have any questions. Sincerely, Henrietta Noriega Office Specialist Design/Build hn Enclosures Pima County (Email only) cc:W. McElyea |
05/21/2009 | PAUL MACHADO | ENGINEERING | REVIEW | Denied | To: Patricia Gehlen DATE: May 21, 2009 CDRC/Zoning Manager SUBJECT: Carwash and Mini-Storage, 7850 S. Rita Road Development Plan D09-0016 (First Review) T15S, R15E, Section 22 RESUBMITTAL REQUIRED: Development Plan and Drainage Statement. The Development Plan (DP) and Drainage Statement (DS) cannot be approved as submitted. Please address the following review comments prior to the next submittal. Development Plan: 1. Please include a response letter to the comments along with the corrected copies of the DP. 2. The DP provides a lot of information. It is difficult to distinguish what is existing and what is proposed. Provide a brief statement (not on the plans) explaining the scope of this project. 3. As per the Federal ADA requirements, all wheel chair ramps shall have the truncated domes instead of the standard grooves that are shown on COT SD 207. Aside from the Truncated Domes, all wheel chair ramps shall be constructed in accordance with COT SD 207. 4. Please label lot dimensions and bearings per D.S. 2-02.2.1.5. A drawing showing the entire site, all property lines, is required. 5. Label existing and future sight visibility triangles per D.S. 2-02.2.1.10. The Future face of curb is 12' from the right-of-way line. 6. Show all points of egress and ingress including locations and width of driveways and parking area access lanes (P.A.A.L.) per D.S. 2-02.2.1.11. 7. Please label all vehicular, bicycle, pedestrian, and handicapped circulation clearly identified per D.S. 2-02.2.1.12. 8. Fully-dimensioned loading space(s) and maneuvering area(s) per D.S. 2-02.2.1.14. 9. Show the limits of the 100-year floodplain and water surface elevation per D.S. 2-02.2.1.15. 10. Please provide Drainage patterns and finished grades per D.S. 2-02.2.1.16. 11. Please list estimated cut & fill quantities per D.S. 2-02.2.1.17. 12. Please show dimensioned right-of-way, including any applicable Major Streets and Routes (MS&R) Plan right-of-way per D.S. 2-02.2.1.19. 13. All easement of record must be graphically shown on the plan together with recording docket and page per D.S. 2-02.2.1.20. 14. Dimension from street monument lines to existing and proposed curbs, sidewalks, driveways, and utility lines per D.S. 2-02.2.1.21. 15. Location and orientation of existing major physical features, such as railroad tracks and drainageways per D.S. 2-02.2.1.22. 16. Please provide existing topographic contours at intervals not exceeding two (2) feet and/or spot elevations as pertinent and Bench Mark based on City of Tucson Datum, including City Field Book and page number per D.S. 2-02.2.1.23. 17. Show all fences, walls, or vegetation for screening and sight visibility by type, material, height, location and spacing per D.S. 2-02.2.1.27. 18. Show Development plan number (D09-0016) on all sheets per D.S. 2-02.2.1.29. 19. Please show the proposed roof drainage patterns, 100% of the 10-year flow must be conveyed under the sidewalks including any other site drainage as well. Please provide supporting calculations to demonstrate compliance with D.S. 3-01.4.4. If the location(s) of the roof scuppers have not yet been decided, a general note indicating sidewalk scuppers will be used when the roof scuppers locations have been designed and located will suffice. 20. List the consulting engineer and the owner/developer on the plans with the pertinent information. 21. Add note: "Depress all landscaped areas 6" maximum for water harvesting". 22. "A grading permit and Stormwater Pollution Prevention Plans (SWPPP's) may be required for this project. Submit 3 sets of grading and SWPPP's with text, upon completion and submittal of a grading permit application. A grading permit may not be issued prior to site plan approval. Subsequent comments may be necessary, depending upon the nature and extent of revisions that occur to the plans". Drainage Statement: 1. Please include a response letter to the comments along with the corrected copies of the DS. 2. A Drainage Statement is a brief description of drainage conditions applicable for a site which are not affected by 100 year flows of 100 cfs, of more……per S.M.D.D.F.M., chap. II, 2.1.2. The DS must be submitted along with the site plan and accepted with the approval of the grading plan. 3. The content and format of the Drainage Statement should follow S.M.D.D.F.M., chap. II, 2.2. 4. Show the project address or administration address on the cover sheet of the DS. 5. If applicable, add the basin(s) maintenance responsibility note and checklist per S.M.D.D.F.M. 2.3.1.6 C 1 and 2 to the DS. If you have any questions, I can be reached at 837-4932 or Paul.Machado@tucsonaz.gov Paul P. Machado Senior Engineering Associate City of Tucson/Development Services Department 201 N. Stone Avenue P.O. Box 27210 Tucson, Arizona 85726-7210 (520) 837-4932 office (520) 879-8010 fax C:/7850 S. Rita Rd_CDRC |
05/22/2009 | STEVE SHIELDS | ZONING | REVIEW | Denied | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: Steve Shields Lead Planner PROJECT: Rita Road - Carwash/Mini Storage Development Plan (1st Review) D09-0016 TRANSMITTAL DATE: May 22, 2009 DUE DATE: June 01, 2009 DEVELOPMENT PLAN COMMENTS: Please resubmit revised drawings along a response letter, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed. 1. Section 5.3.8.2, LUC, permits a maximum of one year from the date of application to obtain approval of a development plan. If, at the end of that time, the development plan has not been approved, it must be revised to be in compliance with all regulations in effect at that time, and must be resubmitted for a full CDRC review. The one-year expiration date for this development plan is April 30, 2010. 2. D.S. 2-05.2.1.D.2 Location map indicates "GOLF LINKS" along the south, this should be Old Vail Road. 3. D.S. 2-05.2.2.B.2 Provide the D09-0016 development plan number in the lower right hand corner adjacent to the title block of all plans. 4. D.S. 2-05.2.2.B.10 Provide a general note stating that the project is designed to meet the overlay zone(s) criteria: Sec. 2.8.3, Major Streets and Routes (MS&R) Setback Zone. 5. D.S. 2-05.2.3.B All easements shall be drawn on the plan. The recordation information, location, width, and purpose of all easements on site will be stated. 6. D.S. 2-05.2.3.C Label Rita Road as an MS&R. 7. D.S. 2-05.2.4.N Based on the most current aerial photos there is a structure located northeast of the southern most storage building within the fire truck turn around area. Provide documentation that this structure was permitted. Show the structure on the plan and revise any applicable calculations. 8. D.S. 2-05.2.4.N Based on the most current aerial photos there is a structure located just northwest of the "EXIST AUTO VAC CANOPY" adjacent to the existing wall. Provide documentation that this structure was permitted. Show the structure on the plan and revise any applicable calculations. 9. D.S. 2-05.2.4.P Based on the most current aerial photos there are only eight (8) vehicle parking spaces adjacent to the existing caretaker building not nine (9) as shown on the plan. 10. D.S. 2-05.2.4.P Based on the most current aerial photos the parking configuration shown along the "STRIPED AUTO DETAIL AREA" is not correct. 11. D.S. 2-05.2.4.P Per D.S. 3-05.2.1.3 the proposed vehicle parking space located directly adjacent to the dog was fenced area is required to be ten (10) feet wide. 12. Additional comments may be forth coming depending on how each comment has been addressed. If you have any questions about this transmittal, please Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.com Sshield1 on DS1/planning/New Development Package/ D09-0016 RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development plan and additional requested documents. |
05/28/2009 | JWILLIA5 | ZONING-DECISION LETTER | REVIEW | Denied | COMMUNITY DESIGN REVIEW COMMITTEE DEVELOPMENT SERVICES May 28, 2009 Robert Page 2102 N. Country Club Road #9 Tucson, Arizona 85716 Subject: D09-0016 Rita Road Carwash/Mini Storage Development Plan Dear Robert: Your submittal of May 1, 2009 for the above project has been reviewed by the Community Design Review Committee and the comments reflect the outstanding requirements which need to be addressed before approval is granted. Please review the comments carefully. Once you have addressed all of the comments, please submit the following revised documents and 5 sets of the DETAILED cover letter explaining how each outstanding requirement has been addressed: ALL BLACKLINES MUST BE FOLDED 5 Copies Revised Development Plan (Zoning, H/C, Engineering, WWM, DSD) 2 Copies Revised Drainage Statement (Engineering, DSD) Should you have any questions, please call me at 837-4919. Sincerely, John Williams Planning Technician All comments for this case are available on our website at http://www.ci.tucson.az.us/dsd/ Via fax: (520) 798-3341 dp-resubmittal |