Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL - CDRC - DEV PLAN
Permit Number - D08-0047
Review Name: RESUBMITTAL - CDRC - DEV PLAN
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 04/30/2009 | FERNE RODRIGUEZ | START | PLANS SUBMITTED | Completed | |
| 05/05/2009 | JASON GREEN | ENGINEERING | REVIEW | Approv-Cond | DATE: May 5, 2009 SUBJECT: QuikTrip #1453 Development Plan Core Review- 3rd Engineering Review TO: Patricia Gehlen, CDRC Manager LOCATION: 1884 S Craycroft Road, T145S R14E Sec23 Ward 5 REVIEWERS: Jason Green, CFM ACTIVITY: D08-0047 SUMMARY: Engineering Division of Development Services Department has received and reviewed the proposed Development Plan Package, and Stormwater Pollution Prevention Plan (DOWL Engineers, 30APR09). Engineering Division recommends approval of the Development Plan Package and Stormwater Pollution Prevention Plan (SWPPP) at this time. " Provide the Recordation information for all easement abandonment prior to final Development Plan Mylar approval. " Call for a Pre-construction meeting prior to start of earthwork. To schedule a DSD Pre-construction meeting, SWPPP inspection or general Engineering Inspections, call IVR (740-6970), or schedule with a Customer Service Representative at the Development Services Department, or contact DSD Engineering at 791-5550 extension 2101, or schedule inspections online at: http://www.ci.tucson.az.us/dsd/Online_Services/Online_Permits/online_permits.html " Approval from TDOT Permits and Codes will be required for all improvements within the public right-of-way and for the connection of the private storm drains into the public infrastructure. A right-of-way use permit application will be required prior to construction. Contact Thad Harvison, (520)-837-6592 or Thad.Harvison@tucsonaz.gov for all right-of-way requirements and permit applications. GENERAL COMMENTS: Provide the final recordation for the abandonment of all existing easements as shown on the development plan documents. The recordation information is required prior to Final CDRC approval. For any questions or to schedule meetings call me at 837-4929. Jason Green, CFM Senior Engineer Associate Engineering Division Development Services |
| 05/12/2009 | INPL | COT NON-DSD | OCSD | Approved | |
| 05/18/2009 | JOSE ORTIZ | COT NON-DSD | TRAFFIC | Approved | |
| 05/19/2009 | PATRICIA GEHLEN | ZONING-DECISION LETTER | REVIEW | Approv-Cond | COMMUNITY DESIGN REVIEW COMMITTEE DEVELOPMENT SERVICES May 19, 2009 Richard Cordova DOWL HKM 166 West Alameda Tucson, Arizona 85701 Subject: D08-0047 QuikTrip #1453 Development Plan Dear Richard: The above referenced development plan has been CONDITIONALLY APPROVED by the Community Design Review Committee. Once the necessary corrections are made per the on-line comments, please submit the following documents for sign-off. 1 Rolled blueline COMPLETE SET of the Development Plan, Landscape Plan, and the Native Plant Preservation Plan (if part of the original submittal). Please include applicable sheets from any other concurrent reviews. AND 1 Rolled blueline set of the Development Plan. AND 1 CD that contains all of the drainage/hydrology and other reports submitted for the review and approval of this plan. The extra rolled blueline set that you submit will be delivered to Pima County for permanent recording. Additional blackline copies will be made from the complete set and distributed to various review agencies for their files. These copies will be ordered from the City's contracted print company and billed to you unless you already have an account at another printing company. Please let us know which printing company you would prefer to use and list them on your attached transmittal form when submitting your mylars to the CDRC office for sign-off approval. Your printing company will deliver the rolled bluelines to your office. If you are out of town you will need to contact the printing company for pick up or mailing arrangement options. PLEASE HAVE THE CITY OF TUCSON APPROVAL STAMP PLACED ON EACH SHEET OF THE SUBMITTAL SET, PREFERABLY IN THE LOWER RIGHT HAND CORNER NEAR THE TITLE BLOCK. THE STAMP IS LOCATED AT http://www.tucsonaz.gov/dsd/CDRC___Rezoning/CDRC/CDRC_Stamp/cdrc_stamp.html. BLUELINE SETS THAT DO NOT HAVE THE STAMP WILL BE RETURNED FOR CORRECTION. Should you have any questions, please call me at 837-4919. Sincerely, Patricia Gehlen CDRC Manager All comments for this case are available on our website at http://www.ci.tucson.az.us/dsd/ Via fax: 624-0384 dpapproved |