| 01/05/2009 | FERNE RODRIGUEZ | UTILITIES | TUCSON ELECTRIC POWER | Approved | 4350 E. Irvington Road, Tucson, AZ 85714 Post Office Box 711, Tucson, AZ 85702 WR#202820 December 31, 2008 Physical Resource Engineering Attn: Dennis Donovan P.O. Box 36985 Tucson, Arizona 85740 Dear Mr. Donovan : SUBJECT: Rita Ranch/ Lot 14 Brown D08-0041 Tucson Electric Power Company has reviewed and approved the development plan submitted December 15, 2008. It appears that there are no conflicts with the existing facilities within the boundaries of this proposed development. Enclosed is a copy of a TEP facilities map showing the approximate location of the existing facilities. Any relocation costs will be billable to the customer. In order to apply for electric service, call the New Construction Department at (520) 918-8300. Submit a final set of plans including approved site, electrical load, paving off-site improvements and irrigation plans, if available include a CD with the AutoCAD version of the plans. If easements are required, they will be secured by separate instrument. Your final plans should be sent to: Tucson Electric Power Company Attn: Ms. Mary Boice New Business Project Manager P. O. Box 711 (DB-101) Tucson, AZ 85702 520-917-8732 Should you have any technical questions, please call the area Designer Warren McElyea at (520) 918-8268. Sincerely, Elizabeth Miranda Office Support Specialist Design/Build lm Enclosures cc: DSD_CDRC@tucsonaz.gov, City of Tucson (email) W. McElyea, Tucson Electric Power |
| 01/06/2009 | LAITH ALSHAMI | ENGINEERING | REVIEW | Approv-Cond | Laith Alshami, Engineering and Floodplain Review, 01/06/2009, TO: Patricia Gehlen FROM: Laith Alshami, P.E. CDRC Engineering SUBJECT: Lot 14, Brown/Rita Ranch D08-0041, T15S, R15E, SECTION 27 RECEIVED: Development Plan, Landscape Plan and Drainage Report on December 10, 2008 The subject submittal has been reviewed. The Drainage Report is acceptable for Development Plan purposes and it is herby approved. Additional drainage related information may be required with the grading plan submittal. The Landscape Plan is acceptable pertaining to Engineering and Floodplain Review. The Development Plan is recommended for conditional approval, pertaining to Engineering and Floodplain Review, subject to providing the following information on the Development Plan Mylar: 1. Although this parcel is part of a recorded plat, the subject Development Plan is a stand alone document that should include all required information. The Basis of Bearing and the tie between the basis of bearing and one of the subject parcel corners shall be clearly shown and called out, as required by D.S. 2-05.2.3.A. RESUBMITTAL REQUIRED: Development Plan Mylar |
| 01/15/2009 | JENNIFER STEPHENS | PIMA COUNTY | ADDRESSING | Approved | 201 N. STONE AV., 1ST FL TUCSON, AZ 85701-1207 JENNIFER STEPHENS ADDRESSING OFFICIAL PH: 740-6480 FAX #: 740-6370 TO: CITY PLANNING FROM: JENNIFER STEPHENS, ADDRESSING OFFICIAL SUBJECT: D08-0041 LOT 14 BROWN/RITA RANCH/REVISED DEVELOPMENT PLAN DATE: 1/13/09 The above referenced project has been reviewed by this Division for all matters pertaining to street naming/addressing, and we hereby approve this project. Submit a 24 x 36 Reverse Reading Double Matte Photo Mylar of approved Development Plan to City Planning. Signed and dated Mylar will be forwarded to Pima County Addressing prior to assignment of addresses. 2.) All addresses will need to be displayed per Pima County Address Standards at the time of final inspection. |
| 01/16/2009 | PATRICIA GEHLEN | ZONING-DECISION LETTER | REVIEW | Approv-Cond | COMMUNITY DESIGN REVIEW COMMITTEE DEVELOPMENT SERVICES January 16, 2009 Dennis L. Donovan Physical Resource Engineering, Inc. P.O. Box 36985 Tucson, Arizona 85740 Subject: D08-0041 Lot 14 Brown/Rita Ranch Development Plan Dear Dennis: The above referenced development plan has been CONDITIONALLY APPROVED by the Community Design Review Committee. Once the necessary corrections are made per the on-line comments, please submit the following documents for sign-off. 1 Rolled blueline COMPLETE SET of the Development Plan, Landscape Plan, and the Native Plant Preservation Plan (if part of the original submittal). Please include applicable sheets from any other concurrent reviews. AND 1 Rolled blueline set of the Development Plan. AND 1 CD that contains all of the drainage/hydrology and other reports submitted for the review and approval of this plan. The extra rolled blueline set that you submit will be delivered to Pima County for permanent recording. Additional blackline copies will be made from the complete set and distributed to various review agencies for their files. These copies will be ordered from the City's contracted print company and billed to you unless you already have an account at another printing company. Please let us know which printing company you would prefer to use and list them on your attached transmittal form when submitting your mylars to the CDRC office for sign-off approval. Your printing company will deliver the rolled bluelines to your office. If you are out of town you will need to contact the printing company for pick up or mailing arrangement options. PLEASE HAVE THE CITY OF TUCSON APPROVAL STAMP PLACED ON EACH SHEET OF THE SUBMITTAL SET, PREFERABLY IN THE LOWER RIGHT HAND CORNER NEAR THE TITLE BLOCK. THE STAMP IS LOCATED AT http://www.tucsonaz.gov/dsd/CDRC___Rezoning/CDRC/CDRC_Stamp/cdrc_stamp.html. BLUELINE SETS THAT DO NOT HAVE THE STAMP WILL BE RETURNED FOR CORRECTION. Should you have any questions, please call me at 837-4919. Sincerely, Patricia Gehlen CDRC Manager All comments for this case are available on our website at http://www.ci.tucson.az.us/dsd/ Via fax: 690-1769 dpapproved |
| 12/10/2008 | FERNE RODRIGUEZ | START | PLANS SUBMITTED | Completed | |
| 12/11/2008 | JIM EGAN | COT NON-DSD | FIRE | Approved | |
| 12/12/2008 | RONALD BROWN | ZONING HC SITE | REVIEW | Denied | 1. AT DETAIL 6 SHEET 4, THE BOTTOM OF THE SIDEWALK RAMP SHOULD BE PUSHED BACK TO THE START OF THE RADII OF THE CURB, LOCATE A 2' DEEP DETECTABLE WARNING STIP AT THE BOTTOM OF THE RAMP AND MAKE THE BOTTOM PORTION OF THE SIDEWALK LANDING LEVEL IN ELEVATION WITH THE ASPHALTIC PAVING WITH A MAXIMUM 2% SLOPE BOTH WAYS. 2. DETAIL 3 PAGE 4: ACCESSIBLE SIGNAGE IS TO BE LOCATED ON THE CENTER LINE OF THE ACCESSIBLE PARKING SPACE, AS PER "PARK WISE" REQUIREMENTS. THIS WILL CONFLICT WITH ENTRANCE DOOR LOCATION. RELOCATE PARKING OR DOOR. |
| 12/17/2008 | STEVE SHIELDS | ZONING | REVIEW | Approved | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: Steve Shields Lead Planner PROJECT: 8165 Camino de Cafe D08-0041 Development Plan (2nd Review) TRANSMITTAL DATE: December 17, 2008 DUE DATE: January 9, 2009 COMMENTS: Please resubmit revised drawings along a response letter, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed. 1. The Zoning Review Section approves the development plan for this project. However, should there be any changes requested by other CDRC members, the Zoning Review Section approval is void, and we request copies of the revised development plan to verify that those changes do not affect any zoning requirements If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956. C:\planning\cdrc\developmentplan\D08-0041-2nd.doc RESUBMITTAL OF THE FOLLOWING IS REQUIRED: |
| 12/23/2008 | FERNE RODRIGUEZ | PIMA COUNTY | WASTEWATER | Approved | December 19, 2008 To: DENNIS DONOVAN, P.E. PHYSICAL RESOURCE ENGINEERING, INC. Thru: Patricia Gehlen, CDRC Manager City of Tucson Development Services Department From: Chandubhai C Patel, P.E. Civil Eng. Manager Development Review Division ( Wastewater) Subject: LOT 14, BROWN/RITA RANCH - 8165 CAMINO DE CAFÉ Dev. Plan – 2nd Submittal D08-041 The proposed sewer collection lines for the above-referenced project have been reviewed on behalf of the Pima County Department of Environmental Quality (PDEQ) and the Pima County Regional Wastewater Reclamation Department (PCRWRD). This review letter may contain comments pertaining to the concerns of either Department. The following comments are offered for your use. The PDEQ and the PCRWRD hereby approve the above referenced submittal of the Development Plan as received by us on December 9, 2008. Please note the following: Approval of the above referenced submittal does not authorize the construction of public or private sewer collection lines, or water distribution lines. Prior to construction of such features, a Construction Authorization (Approval To Construct) may need to be obtained from the Pima County Environmental Quality Department. Also, air quality activity permits must be secured by the developer or prime contractor from the Pima County Department of Environmental Quality before constructing, operating, or engaging in any activity which may cause or contribute to air pollution. If you have any questions regarding the above comments, please do not hesitate to contact me. Copy: Project File . |