Review Status: Completed
Review Details: REVISION - DEV PLAN
Permit Number - D08-0037
Review Name: REVISION - DEV PLAN
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 03/17/2011 | FERNE RODRIGUEZ | START | PLANS SUBMITTED | Completed | |
| 03/21/2011 | DAVID MANN | COT NON-DSD | FIRE | Approved | |
| 03/28/2011 | JOSE ORTIZ | COT NON-DSD | TRAFFIC | Approved | |
| 03/30/2011 | STEVE SHIELDS | ZONING | REVIEW | Denied | CDRC TRANSMITTAL TO: Planning & Development Services Department Plans Coordination Office FROM: Steve Shields Lead Planner PROJECT: Lot 34 Brown/Rita Ranch D08-0037 Development Plan (Revision) TRANSMITTAL DATE: March 30, 2011 DUE DATE: April 01, 2011 COMMENTS: Please resubmit revised drawings along a response letter, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed. 1. D.S. 2-05.2.4.D.3 Provide a PAAL width dimension form the eastern most vehicle parking space, located along the north side of the property, to the vehicle parking spaces shown along the east property line. This PAAL width must be 24' wide. 2. D.S. 2-05.2.4.O The loading space calculation is not correct. Per Ordinance #10884 dated March 8, 2011, Industrial Use Group, Less than 25,000 sq. ft., Zero (0) required. Revise the loading calculation to show "0 - REQUIRED, 1 12X 55' PROVIDED" 3. D.S. 2-05.2.4.P The northern most vehicle parking space of the west parking area appears to be restricted by the curbing. 4. D.S. 2-05.2.4.P Provide a width dimension for the vehicle parking space located directly south of the refuse enclosure. Per D.S. 3-05.2.1.3 When the side(s) of a parking space abuts any vertical barrier over six (6) inches in height, other than a vertical support for a carport, the required width for the space is ten (10) feet. 5. D.S. 2-05.2.4.P Provide a width dimension for the vehicle parking space located directly north of the bollards adjacent to the transformer. Show the bollards on the plan. Per D.S. 3-05.2.1.3 When the side(s) of a parking space abuts any vertical barrier over six (6) inches in height, other than a vertical support for a carport, the required width for the space is ten (10) feet. 6. D.S. 2-05.2.4.P The vehicle parking space calculation is not correct. Per Ordinance #10886 dated March 22, 2011, Industrial Use Group, 1 space per 1000 sq. ft. of GFA is required. That said based on a GFA of 7200 / 1000 = 7 vehicle parking spaces required. Revise the vehicle parking space calculation. 7. D.S. 2-05.2.4.Q The bicycle parking space calculation is not correct. Per Ordinance #10886 dated March 22, 2011, Industrial Use Group, Short-term (Class 2) - not required, Long-term (Class 1) is required at 1 space per 15,000 sq ft GFA. Minimum 2 spaces 8. D.S. 2-05.2.4.Q The bicycle parking space calculation is not correct. Per Ordinance #10886 dated March 22, 2011, show how the proposed Long-term bicycle parking meets the requirements of Section 3.3.9.4.B. If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956. C:\planning\cdrc\developmentplan\D08-0037dp.doc RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised tentative plat/development plan. CDRC TRANSMITTAL TO: Planning & Development Services Department Plans Coordination Office FROM: Steve Shields Lead Planner PROJECT: Lot 34 Brown/Rita Ranch D08-0037 Development Plan (Revision) TRANSMITTAL DATE: March 30, 2011 DUE DATE: April 01, 2011 COMMENTS: Please resubmit revised drawings along a response letter, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed. 1. D.S. 2-05.2.4.D.3 Provide a PAAL width dimension form the eastern most vehicle parking space, located along the north side of the property, to the vehicle parking spaces shown along the east property line. This PAAL width must be 24' wide. 2. D.S. 2-05.2.4.O The loading space calculation is not correct. Per Ordinance #10884 dated March 8, 2011, Industrial Use Group, Less than 25,000 sq. ft., Zero (0) required. Revise the loading calculation to show "0 - REQUIRED, 1 12X 55' PROVIDED" 3. D.S. 2-05.2.4.P The northern most vehicle parking space of the west parking area appears to be restricted by the curbing. 4. D.S. 2-05.2.4.P Provide a width dimension for the vehicle parking space located directly south of the refuse enclosure. Per D.S. 3-05.2.1.3 When the side(s) of a parking space abuts any vertical barrier over six (6) inches in height, other than a vertical support for a carport, the required width for the space is ten (10) feet. 5. D.S. 2-05.2.4.P Provide a width dimension for the vehicle parking space located directly north of the bollards adjacent to the transformer. Show the bollards on the plan. Per D.S. 3-05.2.1.3 When the side(s) of a parking space abuts any vertical barrier over six (6) inches in height, other than a vertical support for a carport, the required width for the space is ten (10) feet. 6. D.S. 2-05.2.4.P The vehicle parking space calculation is not correct. Per Ordinance #10886 dated March 22, 2011, Industrial Use Group, 1 space per 1000 sq. ft. of GFA is required. That said based on a GFA of 7200 / 1000 = 7 vehicle parking spaces required. Revise the vehicle parking space calculation. 7. D.S. 2-05.2.4.Q The bicycle parking space calculation is not correct. Per Ordinance #10886 dated March 22, 2011, Industrial Use Group, Short-term (Class 2) - not required, Long-term (Class 1) is required at 1 space per 15,000 sq ft GFA. Minimum 2 spaces 8. D.S. 2-05.2.4.Q The bicycle parking space calculation is not correct. Per Ordinance #10886 dated March 22, 2011, show how the proposed Long-term bicycle parking meets the requirements of Section 3.3.9.4.B. If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956. C:\planning\cdrc\developmentplan\D08-0037dp.doc RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised tentative plat/development plan. |
| 03/30/2011 | RONALD BROWN | ZONING HC | REVIEW | Denied | Accessible parking aisle does not work. Access from aisle may not be onto a 8% sloped ramp. There must be a landing at maximum slope of 2% and then onto the 8% ramp. |
| 03/31/2011 | LAITH ALSHAMI | ENGINEERING | REVIEW | Denied | Laith Alshami, Engineering and Floodplain Review, 03/31/2011 TO: Patricia Gehlen FROM: Laith Alshami, P.E. CDRC Engineering SUBJECT: Lot 34 Brown/Rita Ranch D08-0037, T15S, R15E, SECTION 27 RECEIVED: Revised Development Plan and Landscape Plan on March 17, 2011 The subject submittal has been reviewed and it can not be approved at this time. Address the following comments before review can continue. Prepare a detailed response that explains the revisions that were made and references the exact location in the Drainage Report and on the Development Plan where the revisions were made: 1. Explain why the 4' curb openings have been changed to 2' and verify that the 2' openings are sufficient. 2. Explain why the sidewalk scuppers where eliminated and verify that they are not needed. If concentrated runoff is still proposed across sidewalks, the scuppers are still needed. 3. Generally, address, in a revised drainage report, all proposed drainage related changes and verify that the changes are needed and will not cause adverse impact on site drainage. RESUBMITTAL REQUIRED: Revised Development Plan and Drainage Report |
| 04/01/2011 | JOE LINVILLE | LANDSCAPE | REVIEW | Approv-Cond | Revise the plans such that the parking space in the northwest corner of the parking lot does not overhang into the street landscape border. DS 2-06.3.3.E |
| 04/04/2011 | GLYNDA ROTHWELL | UTILITIES | TUCSON ELECTRIC POWER | Approved | SUBJECT: Lot 34 Brown/ Rita Ranch - Revised D08-0037 Tucson Electric Power Company has reviewed and approved the development plan submitted March 23, 2011 It appears that there are no conflicts with the existing facilities within the boundaries of this proposed development. Please be sure that the fence to be installed does not site directly over the top of our underground electric line and call for blue stake before digging. Please retain a minimum of 10' in front of all equipment. Additional or revised easements may be required. |
| 04/04/2011 | JOHN WILLIAMS | ZONING-DECISION LETTER | REVIEW | Denied | COMMUNITY DESIGN REVIEW COMMITTEE PLANNING & DEVELOPMENT SERVICES April 4, 2011 Jeff Stanley JAS Engineering P.O. Box 1888 Tucson, Arizona 85702 Subject: D08-0037 LOT 34 BROWN RITA RANCH Development Plan Revision Dear Jeff: Your submittal of March 16, 2011 for the above project has been reviewed by the Community Design Review Committee and the comments reflect the outstanding requirements which need to be addressed before approval is granted. Please review the comments carefully. Once you have addressed all of the comments, please submit the following revised documents and a set of 5 DETAILED cover letters explaining how each outstanding requirement has been addressed: ALL BLACKLINES MUST BE FOLDED 5 Copies Revised Development Plan (HC Site, Zoning, Engineering, Landscape, PDSD) 4 Copies Revised Landscape Plan (Zoning, Engineering, Landscape, PDSD 2 Copies Revised Drainage Report (Engineering, PDSD) Should you have any questions, please call me at 837-4893. Sincerely, John Williams Planning Technician All comments for this case are available on our website at http://www.ci.tucson.az.us/dsd/ Via fax: 624-0993 |