Permit Number: D08-0031
Parcel: 13316030G

Review Status: Completed

Review Details: RESUBMITTAL - CDRC - DEV PLAN

Permit Number - D08-0031
Review Name: RESUBMITTAL - CDRC - DEV PLAN
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
10/09/2008 FERNE RODRIGUEZ START PLANS SUBMITTED Completed
10/10/2008 TERRY STEVENS ZONING REVIEW Approv-Cond CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: Terry Stevens
Lead Planner

PROJECT: D08-0031
Urological Associates of South
Development Plan

TRANSMITTAL: 10/10/2008

DUE DATE: 11/06/08

COMMENTS:

1. The Zoning Review Section approves the development plan for this project, subject to the following changes on the sign-off copies. However, should there be any changes requested by other CDRC members, the Zoning Review Section approval is void, and we request copies of the revised development plan to verify that those changes do not affect any zoning requirements.

2. DS 2-05.2.4.G Provide clarification for the 1' NAE along the property line adjacent to Wilmot Rd. Indicated on the plan is a 1'NAE being abdandoned, a 1' NAE by separate instrument and a 1' NAE granted by dk X pg X all indicating the same line. Clarify and provide docket and page recording information for the new 1' NAE and docket and page recording information for the abandonment of the existing 1' NAE.


If you have any questions about this transmittal, please call Terry Stevens, (520) 837-4961
TLS C:\planning\cdrc\developmentplan\D08-0031dpca.doc
10/10/2008 JASON GREEN ENGINEERING REVIEW Approv-Cond DATE: October 10, 2008
SUBJECT: Urological Associates of Southern Arizona Development Plan- 3rd Engineering Review
TO: Patricia Gehlen, CDRC Manager
LOCATION: 6325 E Tanque Verde, T145S R15E Sec06 Ward 2
REVIEWERS: Jason Green, CFM
ACTIVITY: D08-0031


SUMMARY: Engineering Division of Development Services Department has received and reviewed the revised Development Plan and Geotechnical Investigation (Fugro Consultants, Inc., 18MAR08). Engineering Division recommends conditional approval of the Development Plan at this time. The Drainage Report was reviewed for Development Plan purposes only. The following item needs to be addressed prior to Mylar approval:


DEVELOPMENT PLAN:

1) Complied

2) Complied

3) Complied

4) Complied

5) DS Sec.2-05.2.3.B: Revise the Development Plan Mylar to provide the recordation information for the abandonment of the No Access Easement. Easement abandonment is required prior to Mylar approval.

6) Complied

7) Complied

8) Complied

9) Complied

10) Complied

11) Complied

12) Complied

13) Complied

14) Complied

15) Complied

16) Complied

17) Complied

18) Complied.

19) Complied.

20) Complied.

21) Complied

22) Complied

23) Complied

24) Complied.

25) Complied.


GEOTECHNICAL REPORT:

26) Complied


GENERAL COMMENTS:

Provide the above corrections at Mylar submittal. The final Development Plan Mylar will not be approved prior to the abandonment of the NAE.

For any questions or to schedule meetings call me at 837-4929.



Jason Green, CFM
Senior Engineer Associate
Engineering Division
Development Services
10/10/2008 RONALD BROWN ZONING HC SITE REVIEW Approved
10/10/2008 JOE LINVILLE LANDSCAPE REVIEW Approv-Cond 1) Revise the development plans to provide a screen wall per LUC Table 3.7.2-I for the loading area proposed near Tanque Verde Road. Call out the wall on the plan.
10/15/2008 FERNE RODRIGUEZ PIMA COUNTY WASTEWATER Denied October 15, 2008

To: Steven W. Hill
Leadstar Engineering

Thru: Patricia Gehlen, CDRC Manager
City of Tucson Development Services Department

___________________________
From: Tom Porter, Sr. CEA (520-740-6579), representing the Pima County
Departments of Wastewater Management and Environment Quality

Subject: UASA Expansion for USMD Tucson Cancer Center
Dev. Plan – 3rd Submittal
D08-031


The proposed sewer collection lines for the above-referenced project have been reviewed on behalf of the Pima County Department of Environmental Quality (PDEQ) and the Pima County Wastewater Management Department (PCWMD). This review letter may contain comments pertaining to the concerns of either Department. The following comments are offered for your use.

Provide a letter from the owner of the existing private collection sewers, authorizing this connection and indicating that the existing private sewers have sufficient capacity to handle the additional flow. 3rd Request.

This office will require a revised set of bluelines, and a response letter, addressing these comments. Additional comments may be made during the review of these documents.

Pima County Code Title 13.20.030.A.2 requires that a wastewater review fee be paid for each submittal of the development plan. The fee for the first submittal is $166 plus $50 per sheet. For the second submittal, the review fee is $50 per sheet. For all subsequent submittals, the review fee is $39 per sheet.

The next submittal of this project will be the fourth (4th ) submittal. A check for the review fee of this submittal in the amount of $39.00 (made out to PIMA COUNTY TREASURER) must accompany the revised set of bluelines and response letter.

If the number of sheets changes, please adjust the review fee accordingly. If you have any questions regarding the above-mentioned comments, please contact me.
10/15/2008 FERNE RODRIGUEZ PIMA COUNTY WASTEWATER Denied November 20, 2008

To: Steven W. Hill
Leadstar Engineering

Thru: Patricia Gehlen, CDRC Manager
City of Tucson Development Services Department

From: Chandubhai C Patel, P.E., Civil Eng. Manager
Development Review Division ( Wastewater)

Subject: UASA Expansion for USMD Tucson Cancer Center
Dev. Plan – 3rd Submittal (REVISED)
D08-031


The proposed sewer collection lines for the above-referenced project have been reviewed on behalf of the Pima County Department of Environmental Quality (PDEQ) and the Pima County Regional Wastewater Reclamation Department (PCRWRD). This review letter may contain comments pertaining to the concerns of either Department. The following comments are offered for your use.

The PDEQ and the PCRWRD hereby approve the above referenced submittal of the Development Plan as received by us on November 18, 2008.

Please note the following: Approval of the above referenced submittal does not authorize the construction of public or private sewer collection lines, or water distribution lines. Prior to construction of such features, a Construction Authorization (Approval To Construct) may need to be obtained from the Pima County Environmental Quality Department.

Also, air quality activity permits must be secured by the developer or prime contractor from the Pima County Department of Environmental Quality before constructing, operating, or engaging in any activity which may cause or contribute to air pollution.


If you have any questions regarding the above comments, please do not hesitate to contact me.


Copy: Project File
11/13/2008 FERNE RODRIGUEZ COT NON-DSD REAL ESTATE Approved All real estate matters have been concluded no further comment.
11/14/2008 ANDY VERA ENV SVCS REVIEW Denied 1. The 14 ft x 40 ft required clear approach as shown does not allow adequate maneuverability for positioning the solid waste collection vehicle perpendicular in front of the enclosure without conflicting with concrete island. This needs to be modified to demonstrate adequate maneuverability without conflict.

2. Sheet 4 - The desing criteria for the trash enclosure is inconsistent within each detail drawing. Does not meet the minimum requirements. Please contact Andy Vera to obtain acceptable design.

Please provide corrections on resubmittal.

If you have any questions you may contact Andy Vera at (520) 791-5543 ext 1212 or e-mail: Andy.Vera@tucsonaz.gov

P.S... Left voice message with Joe Zeman on 11/13/08 to address concerns but received no response as of 11/14/08 10:30am.
11/17/2008 PATRICIA GEHLEN ZONING-DECISION LETTER REVIEW Denied COMMUNITY DESIGN REVIEW COMMITTEE
DEVELOPMENT SERVICES

November 17, 2008

Joe Zeman
Leadstar
1010 North Finance Center Drive, Suite200
Tucson, Arizona 85710

Subject: D08-0031 Urological Associates of Southern Arizona Development Plan

Dear Joe:

Your submittal of October 9, 2008 for the above project has been reviewed by the Community Design Review Committee and the comments reflect the outstanding requirements which need to be addressed before approval is granted. Please review the comments carefully. Once you have addressed all of the comments, please submit the following revised documents and a DETAILED cover letter explaining how each outstanding requirement has been addressed:

ALL BLACKLINES MUST BE FOLDED

3 Copies Revised Development Plan (Wastewater, ESD, DSD)








Should you have any questions, please call me at 837-4919.

Sincerely,


Patricia Gehlen
CDRC Manager

All comments for this case are available on our website at http://www.ci.tucson.az.us/dsd/