Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL - CDRC - DEV PLAN
Permit Number - D08-0023
Review Name: RESUBMITTAL - CDRC - DEV PLAN
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/09/2009 | FERNE RODRIGUEZ | START | PLANS SUBMITTED | Completed | |
01/22/2009 | JOE LINVILLE | LANDSCAPE | REVIEW | Approved | |
01/22/2009 | TERRY STEVENS | ZONING | REVIEW | Denied | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: Terry Stevens Lead Planner PROJECT: D08-0023 D & K Trucking (Phase 2) Development Plan TRANSMITTAL: 01/22/2009 DUE DATE: 02/09/09 COMMENTS: 1. Section 5.3.8.2, LUC, permits a maximum of one year from the date of application to obtain approval of a development plan. If, at the end of that time, the development plan has not been approved, it must be revised to be in compliance with all regulations in effect at that time, and must be resubmitted for a full CDRC review. The one-year expiration date for this development plan is 03/30/08. 2. Provide documentation showing that the canopy located west of the modular building for the truck driving school has been permitted, if the canopy was not permitted it can be included on this development plan and submit for a building plan as well.. Provide documentation from El Paso Natural Gas clearly indicating approval of the modular building and the canopy being located within the gas line easement. The last approved Development plan indicates the modular building being located outside of the easement. The submitted development plan shows the modular building encroaching into the easement. It appears the modular building was incorrectly located at the time of construction. On the plan clearly indicate what the rectangular shaped areas north and south of the modular building are. They appear to be truck parking areas, if so label as such. 3. DS 2-05.2.4.D.3 Clearly indicate in the legend the surfacing materials for the existing vehicular parking/PAAL area and the existing trailer storage area. 4. Provide on the plan the required 2 loading zones (12 X 55), per the last approved development plan. Add in the general note for loading zones the number of required and the number of provided loading zones. In the parking calculations note, provide the number of required parking spaces (45) and the number of provided parking spaces for the entire site (104). Per IBC Sec. 1106.1, the number of required handicap spaces is 5 not 3 as indicated in the parking calculations. Five have been provided on the plan a revision to the parking calculations is required. Add a note stating: "See Development Plan D99-0047 for zoning data information already approved and not changed by this vehicle area expansion". 5. Per The ADC-2 Airport Environs Zone overlay the maximum allowed Floor Area Ratio (FAR) is 0.30 not 6.00. Provide note indicting the existing and allowed FAR. See LUC 2.8.5.8.B.1.c. 6. On the detail for the handicap parking sign revise the dimension from grade to the bottom of the sign to the required minimum of seven (7) feet. If you have any questions about this transmittal, please call Terry Stevens, (520) 837-4961 TLS C:\planning\cdrc\developmentplan\D08-0023-2dp.doc |
01/27/2009 | FERNE RODRIGUEZ | UTILITIES | TUCSON ELECTRIC POWER | Approved | 4350 E. Irvington Road, Tucson, AZ 85714 Post Office Box 711, Tucson, AZ 85702 WR#196056 January 26, 2009 Greg Carlson Engineering 1521 E. Broadway Blvd. Tucson, AZ 85653 To Mr Carlson: SUBJECT: D & K Trucking Phase II - Resubmittal D08-0023 Tucson Electric Power Company has reviewed and approved the development plan submitted January 22, 2009. It appears that there are no conflicts with the existing facilities within the boundaries of this proposed development. Enclosed is a copy of a TEP facilities map showing the approximate location of the existing facilities. There is a 138K V line and an underground Feeder line along Houghton Road that doesn’t appear to be in conflict. The customer is responsible for the new trenching to relocate them as well as the relocation cost. In order to apply for electric service, call the New Construction Department at (520) 918-8300. Submit a final set of plans including approved site, offsite and electrical load plans. Include a CD with the AutoCAD version of the plans. If easements are required, they will be secured by separate instrument. Your final plans should be sent to: Tucson Electric Power Company Attn: Rich Harrington New Business Project Manager P. O. Box 711 (DB-101) Tucson, AZ 85702 520-918-8726 Please call the area Designer Warren McElyea at (520) 918-8268 should you have any questions. Sincerely, Henrietta Noriega Office Specialist Design/Build hn Enclosures cc: City of Tucson, (Email only) W. McElyea Tucson Electric Power |
02/09/2009 | ELIZABETH LEIBOLD | ENGINEERING | REVIEW | Approved | DATE: February 9, 2009 TO: Patricia Gehlen; CDRC Manager SUBJECT: Development Plan Engineering Review resubmittal PROJECT: D&K Trucking Phase 2 LOCATION: 6251 S Wilmot Rd, Ward 4 FEMA PANEL: 2265K REVIEWER: Elizabeth Leibold ACTIVITY NUMBER: D08-0023 SUMMARY: The revised Development Plan package was submitted and reviewed by Engineering Division of Development Services Department. Engineering Division recommends approval of the Development Plan. Grading Plan submittal shall require additional topographic clarification, floodplain use permit and SWPPP submittal. If you have questions or would like to set up a meeting, call me at 837-4934. Elizabeth Leibold, PE Civil Engineer Engineering Division Development Services Department |
02/11/2009 | ANDY VERA | ENV SVCS | REVIEW | Approved | |
02/13/2009 | PATRICIA GEHLEN | ZONING-DECISION LETTER | REVIEW | Denied | COMMUNITY DESIGN REVIEW COMMITTEE DEVELOPMENT SERVICES February 13, 2009 Greg Carlson Greg Carlson Engineering 1521 East Broadway Blvd. Tucson, Arizona 85719 Subject: D08-0023 D&K Trucking Phase 2 Development Plan Dear Greg: Your submittal of January 12, 2009 for the above project has been reviewed by the Community Design Review Committee and the comments reflect the outstanding requirements which need to be addressed before approval is granted. Please review the comments carefully. Once you have addressed all of the comments, please submit the following revised documents and 2 copies of the DETAILED cover letter explaining how each outstanding requirement has been addressed: ALL BLACKLINES MUST BE FOLDED 2 Copies Revised Development Plan (Zoning, DSD) 2 Copies Revised Landscape Plan (Zoning, DSD) Should you have any questions, please call me at 837-4919. Sincerely, Patricia Gehlen CDRC Manager All comments for this case are available on our website at http://www.ci.tucson.az.us/dsd/ Via fax: 624-4197 dp-resubmittal |