10/07/2008 FERNE RODRIGUEZ START PLANS SUBMITTED Completed
10/15/2008 FERNE RODRIGUEZ PIMA COUNTY WASTEWATER Approved October 14, 2008

To: TONY TSANG
A.C. TSANG ENGINEERING GROUP, INC.

Thru: Patricia Gehlen, CDRC Manager
City of Tucson Development Services Department

____________________________________
From: Tom Porter, Sr. CEA (520-740-6579), representing the Pima County
Departments of Wastewater Management and Environmental Quality

Subject: HOLIDAY INN EXPRESS
Development Plan – 3rd Submittal (Rev)
D08-019

The proposed sewer collection lines for the above-referenced project have been reviewed on behalf of the Pima County Department of Environmental Quality (PDEQ) and the Pima County Wastewater Management Department (PCWMD). This review letter may contain comments pertaining to the concerns of either Department. The following comments are offered for your use.

The Pima County Department of Environmental Quality and Wastewater Management Department hereby approve the above referenced submittal of the development plan as submitted.

Please note the following: Approval of the above referenced submittal does not authorize the construction of public or private sewer collection lines, or water distribution lines. Prior to the construction of such features, a Construction Authorization (Approval To Construct) may need to be obtained from the Pima County Environmental Quality.

Also, air quality activity permits must be secured by the developer or prime contractor from the Pima County Department of Environmental Quality before constructing, operating or engaging in an activity which may cause or contribute to air pollution.

If you have any questions regarding the above mentioned comments, please contact me .
10/15/2008 JOSE ORTIZ COT NON-DSD TRAFFIC Approved
10/24/2008 STEVE SHIELDS ZONING REVIEW Approved CDRC TRANSMITTAL

TO: Development Services Department Plans Coordination Office
FROM: Steve Shields
Lead Planner

PROJECT: Holiday Inn Express - Wilmot & I-10
D08-0019
Development Plan (3rd Review)

TRANSMITTAL DATE: October 24, 2008

DUE DATE: November 04, 2008

COMMENTS: Please resubmit revised drawings along a response letter, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed.

1. The Zoning Review Section approves the development plan for this project. However, should there be any changes requested by other CDRC members, the Zoning Review Section approval is void, and we request copies of the revised development plan to verify that those changes do not affect any zoning requirements

If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956.

C:\planning\cdrc\developmentplan\D08-0019dp-3rd.doc

RESUBMITTAL OF THE FOLLOWING IS REQUIRED:
10/29/2008 ANDY VERA ENV SVCS REVIEW Approved
11/04/2008 ELIZABETH EBERBACH ENGINEERING REVIEW Denied DATE: November 4, 2008
TO: Patricia Gehlen; CDRC Coordinator
FOR: A. C. Tsang Engineering
SUBJECT: Wilmot/I-10 Holiday Inn Express 3rd submittal Engineering Review
REVIEWER: Elizabeth Eberbach
ACTIVITY NUMBER: D08-0019

SUMMARY: The revised Development Plan was reviewed by Engineering as part of the development for the Wilmot I-10 Commercial Center. The package included the revised Development Plan for the Holiday Inn Express, drainage report, 2 pages of an access agreement, and response letter. Development Services Department Engineering Division does not recommend approval of the Development Plan at this time. The drainage report was reviewed for Development Plan purposes only.

DEVELOPMENT PLAN COMMENTS:
1) City of Tucson Development Standards (DS) Section No. 2-05.2.3.I.1, 2-05.2.3.E.1, 2-05.2.4.H, & 10-02.2.3.1.5, 10-02.1.5: Address the remaining drainage comments for the development plan and drainage report:
a) Clarify pedestrian access area across basin showing grades/slopes to reflect sufficient area for accessible ramp on north side of south basin.
b) Clarify basin outlets details for Basins A and B.
c) Clarify runoff discharge amounts on planview to reflect drainage report.
d) Basin maintenance access ramp is in conflict with proposed parking. Revise basin design to provide basin access.
e) A scupper is indicated at southwest side of building; for the proposed roof drainage from north side of proposed bldg, show where sidewalk scuppers will be needed at north side of sidewalk, and provide calculations in report.
f) Planview sheets for the development plan shall match drainage report. Address the following comments:
i) Check west and south basin designs to reflect drainage report for 100-yr ponding depth, basin bottom elevations, and outlet invert data.
ii) May need to revise drainage design for basins to assure sufficient volume is provided and sufficient runout is available to accommodate ponding depth given northwest basin rim elevations for west basin and to accommodate for accessible ramps for south basin. Show more details in these areas to assure design is feasible.
g) Revise basin design to assure sufficient ramp construction area and to reflect current ANSI standards for accessible ramps south of basin.
2) DS Sec.2-05.3.2.D, 2-05.1.1: Regarding Rezoning condition 26, it was stated in response letter that the CofO's will not be issued until all access improvements are completed. Add note to Development Plan regarding this.
3) DS Sec.2-05.2.4.D.4: Label offsite construction easement for north side improvements.
4) DS Sec.2-05.2.4.L: Further clarify the following elements:
a) Clarify truncated domes for the proposed southside of the pedestrian accessible walkway at the south pavement area north of basin area.
b) Revise the access ramps to ANSI standards and provide details clarifying accessible access along south pedestrian route.
c) Clarify widths of all pedestrian walkways and sidewalks. Distinguish between flush sidewalk and raised sidewalk with elevations or other clarification.
d) Clarify locations of all curb (with type of curb) on planview.
e) Clarify elevations for each element, distinguishing between top of curb and pavement elevations. This may be clarified with legend or planview.
f) Dimension south pedestrian accessible route on planview.
5) DS Sec.2-05.2.4.R: Assure SVT information is correct on all planviews.
6) DS Sec.3-01.5.1.A.1: Other than trees as noted below, plant materials located within existing and future sight visibility triangles shall be limited to ground cover or low-growing vegetation of a species that will not grow higher than thirty inches. Trees may be located within existing and future sight visibility triangles only if clear of leaves and branches to a height of at least six feet above grade upon installation, and at all times thereafter. The trunk caliper of any species selected may not exceed twelve inches in diameter at maturity. Trees with multiple trunks are not allowed. Trees may not be planted in a line that could result in a solid wall effect as viewed from the motorist's perspective. The number and location of trees within existing and future sight visibility triangles may be restricted or modified by the City of Tucson in order to preserve visibility. Revise sheet L2 to assure sight visibility; relocate / remove proposed / existing trees from SVT's to assure visibility. Remove / relocate trees from basin access areas.

Submit the revised Development Plan addressing all of the comments. Include the revised development plan, the revised drainage report, copies of the Tentative & the revised Final Plat block plat, copy of rezoning conditions, copy of cross access agreement, and response letter thoroughly explaining each comment. If you have questions or would like to set up a meeting, call me at 837-4934.

Elizabeth Eberbach, PE
Civil Engineer
Engineering Division
Development Services
11/06/2008 PATRICIA GEHLEN ZONING-DECISION LETTER REVIEW Denied COMMUNITY DESIGN REVIEW COMMITTEE
DEVELOPMENT SERVICES

November 6, 2008

Antony C. Tsang
A.C. Tsang Engineering Group, Inc.
4626 East Fort Lowell Road, Suite S
Tucson, Arizona 85712

Subject: D08-0019 Holiday Inn Express Development Plan

Dear Tony:

Your submittal of October 7, 2008 for the above project has been reviewed by the Community Design Review Committee and the comments reflect the outstanding requirements which need to be addressed before approval is granted. Please review the comments carefully. Once you have addressed all of the comments, please submit the following revised documents and a DETAILED cover letter explaining how each outstanding requirement has been addressed:

ALL BLACKLINES MUST BE FOLDED

2 Copies Revised Development Plan (Engineering, DSD)

2 Copies Revised Landscape Plan (Engineering, DSD)

2 Copies Revised Drainage Report (Engineering, DSD)

2 Copies Cross Access Agreement (Engineering, DSD)





Should you have any questions, please call me at 837-4919.