Permit Number: D08-0005
Parcel: 11901051L

Address:
3390 S 6TH AV

Review Status: Completed

Review Details: REVISION - DEV PLAN

Permit Number - D08-0005
Review Name: REVISION - DEV PLAN
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
02/25/2010 FERNE RODRIGUEZ START PLANS SUBMITTED Completed
03/01/2010 MATT FLICK ENGINEERING REVIEW Approved PDSD Engineering has no objection or adverse comment to approval of the revised (Rev. #4) development plan.
03/01/2010 JIM EGAN COT NON-DSD FIRE Approved
03/03/2010 RONALD BROWN ZONING HC REVIEW Approved
03/04/2010 STEVE SHIELDS ZONING REVIEW Denied CDRC TRANSMITTAL

TO: Planning and Development Services Department
Plans Coordination Office

FROM: Steve Shields
Lead Planner

PROJECT: La Curacao Department Store
Site Plan - Revision #4 (1st Review)
D08-0005

TRANSMITTAL DATE: March 4, 2010

DUE DATE: March 11, 2010

DEVELOPMENT PLAN COMMENTS: Please resubmit revised drawings along with a response letter, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed.

1. D.S. 2-05.3.9.G.5.a Sheet 2A The parking calculation appears to be opposite of the proposed phasing. The parking calculation shows a single building under PHASE 1 of 90,312 sq. ft. and PHASE 2 shows a total square footage of 107,095. Based on the drawings PHASE 1 should account for the 107,095 sq. ft. of building and PHASE 2 should account for the entire site. Please clarify the phasing and parking calculation.

2. D.S. 2-05.3.9.G.5.a Sheet 18 provide a vehicle parking space dimension from the handrail along the east side of the trash compactor. Per D.S. 3-05.2.1.3 When the side(s) of a parking space abuts any vertical barrier over six (6) inches in height, other than a vertical support for a carport, the required width for the space is ten (10) feet to provide extra width to allow passengers to enter and exit the vehicle on the side where the barrier exists.

If you have any questions about this transmittal, please Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.com

Sshield1 on DS1/planning/New Development Package/ d08-0005-REV4.doc

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package.
03/09/2010 GLYNDA ROTHWELL UTILITIES TUCSON ELECTRIC POWER Approved 4350 E. Irvington Road, Tucson, AZ 85714
Post Office Box 711, Tucson, AZ 85702

WR#193349 March 5, 2010

Stantec Consulting Inc.
Attn: Mathew Connors
201 N Bonita Ave, 101
Tucson, Arizona 85745

Dear Mr. Connors :

SUBJECT: La Curacao Department Store
D08-0005

Tucson Electric Power Company has reviewed and approved the development plan submitted March 1, 2010. It appears that there are no conflicts with the existing facilities within the boundaries of this proposed development.

Enclosed is a copy of a TEP facilities map showing the approximate location of the existing facilities. Any relocation and removal of Overhead facilities will be billable to the customer.

In order to apply for electric service, call the New Construction Department at (520) 918-8300. Submit a final set of plans including approved site, electrical load, paving off-site improvements and irrigation plans, if available include a CD with the AutoCAD version of the plans.

If easements are required, they will be secured by separate instrument. Your final plans should be sent to:
Tucson Electric Power Company
Attn: Mr. ricahrd Harrington
New Business Project Manager
P. O. Box 711 (DB-101)
Tucson, AZ 85702
520-917-8726

Should you have any technical questions, please call the area Designer Mike Kaiser at (520) 918-8244.

Sincerely,


Elizabeth Miranda
Office Support Specialist
Design/Build
lm
Enclosures
cc: DSD_CDRC@tucsonaz.gov, City of Tucson (email)
M. Kaiser, Tucson Electric Power
03/10/2010 FRODRIG2 ENV SVCS REVIEW Approved Due Date Case Number Project Address
March 11, 2010 D08-0005 La Curacao Department Store
Comments: Approved Development Plan
Environmental Services
03/10/2010 JOE LINVILLE LANDSCAPE REVIEW Denied Phase 1, as proposed, does not
allow for use of the Pima County Trail along the Tucson Diversion Channel. Revise the plans to ensure that this asphalt trail remains safe and functional until the Phase 2 improvements are completed. Provide information on any necessary temporary improvements or obtain approval to close the trail until Phase 2 construction is completed.
03/15/2010 JOSE ORTIZ COT NON-DSD TRAFFIC Approved
03/16/2010 JOHN WILLIAMS ZONING-DECISION LETTER REVIEW Approv-Cond COMMUNITY DESIGN REVIEW COMMITTEE
PLANNING & DEVELOPMENT SERVICES


March 16, 2010

Corey Thompson
Stantec Consulting, Inc.
201 N. Bonita Avenue #101
Tucson, Arizona 85745

Subject: D08-0005 La Curacao Department Store Development Package

Dear Corey:

The above referenced development plan has been CONDITIONALLY APPROVED by the Community Design Review Committee. Once the necessary corrections are made per Zoning, please submit the following documents for sign-off.

1 Rolled blue line COMPLETE SET of the Development Package, Landscape Plan, and the Native Plant Preservation Plan (if part of the original submittal). Please include applicable sheets from any other concurrent reviews.

1 CD that contains all of the drainage/hydrology and other reports submitted for the review and approval of this plan.

Additional blackline copies will be made from the complete set and distributed to various review agencies for their files. These copies will be ordered from the City's contracted print company and billed to you unless you already have an account at another printing company. Please let us know which printing company you would prefer to use and list them on your attached transmittal form when submitting your plans to the CDRC office for sign-off approval.

PLEASE HAVE THE CITY OF TUCSON APPROVAL STAMP PLACED ON EACH SHEET OF THE SUBMITTAL SET, PREFERABLY IN THE LOWER RIGHT HAND CORNER NEAR THE TITLE BLOCK. THE STAMP IS LOCATED AT http://www.tucsonaz.gov/dsd/CDRC___Rezoning/CDRC/CDRC_Stamp/cdrc_stamp.html BLUELINE SETS THAT DO NOT HAVE THE STAMP WILL BE RETURNED FOR CORRECTION.

Should you have any questions, please call me at 837-4917.


Sincerely,





John Williams
Planning Technician

All comments for this case are available on our website at http://www.tucsonaz.gov/dsd/

Via fax: (520) 750-7470