Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: D07-0053
Parcel: 13628005K

Review Status: Completed

Review Details: RESUBMITTAL - CDRC - DEV PLAN

Permit Number - D07-0053
Review Name: RESUBMITTAL - CDRC - DEV PLAN
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
11/18/2008 FERNE RODRIGUEZ START PLANS SUBMITTED Completed
11/25/2008 TERRY STEVENS ZONING REVIEW Approved CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: Terry Stevens
Lead Planner

PROJECT: D07-0053
Call Center Employee Parking
Development Plan

TRANSMITTAL: 11/25/2008

DUE DATE: 12/17/08

COMMENTS:

1. The Zoning Review Section approves the development plan for this project. However, should there be any changes requested by other CDRC members, the Zoning Review Section approval is void, and we request copies of the revised development plan to verify that those changes do not affect any zoning requirements.

If you have any questions about this transmittal, please call Terry Stevens, (520) 837-4961

TLS C:\planning\cdrc\developmentplan\D07-0053 -a.doc
12/02/2008 JASON GREEN ENGINEERING REVIEW Approved DATE: December 2, 2008
SUBJECT: Call Center Employee Parking Development Plan- 4th Engineering Review
TO: Patricia Gehlen, CDRC Manager
LOCATION: 4110 S Pantano Road, T14S R15E Sec32 Ward 1
REVIEWERS: Jason Green, CFM
ACTIVITY: D07-0053


SUMMARY: Engineering Division of Development Services Department has received and reviewed the revised Development Plan and Landscape Plan. Engineering Division recommends approval of the Development Plan at this time. The Drainage Report was reviewed for Development Plan purposes only.


DEVELOPMENT PLAN:

1) Completed.

2) Completed.

3) Restated: Review and approval from TDOT Permits and Codes for all improvements within the public right-of-way will be required. A right-of-way use permit application will be required prior to construction. Refer to the following links for TDOT Forms and applications:

a) http://www.tucsonaz.gov/dsd/Forms_Fees___Maps/Applications/applications.html /

b) http://www.dot.ci.tucson.az.us/engineering/pia.php

c) Or contact Thad Harvison at 837-6592 for all additional questions regarding r-o-w.


GRADING PLAN:

4) Restated: DS Sec.11-01.2.1: A grading permit is required for this project. A grading plan and a grading permit application will be required after Development Plan approval and prior to any construction activity. A grading permit may not be issued prior to Development Plan approval.

5) Restated: Please ensure that any future grading plan will be consistent with the Development Plan, Drainage Report, and Geotechnical Report. Grading standards may be accessed at: http://www.ci.tucson.az.us/dsd/DevStandsTOC.pdf

6) Restated: Arizona Pollutant Discharge Elimination System (AZPDES) requirements are also applicable to this project. Stormwater Pollution Prevention Plans (SWPPP) and text addressing stormwater controls for all areas affected by construction activities related to this development will be required with a grading plan submittal. For further information, visit www.adeq.state.az.us/environ/water/permits/stormwater.html.


GENERAL COMMENTS:

Submit the Development Plan Mylar Package to the CDRC Department for review and approval.

For any questions or to schedule a meeting call me at 837-4929.



Jason Green, CFM
Senior Engineer Associate
Engineering Division
Development Services
12/03/2008 JOE LINVILLE LANDSCAPE REVIEW Denied 1) Remove note 26 on sheet 1 of the Development Plan. There is no applcable DDO case.

2) Revise sheet 1 of the Development Plan and Landscape Plan to include the correct and the same language for rezoning condition 3.

3) Revise the landscape plan to locate the required vegetative groundcover within the landscape border. LUC 3.7.2.4.A.5

4) Revise the landsape plan such that the required screening along Pantano Road is located within the back three feet of the landscape border in accordance with LUC 3.7.3.2.C.

5) Revise the landscape plan to provide continuous screening of the parking lot along the street frontage.
12/04/2008 PATRICIA GEHLEN ZONING-DECISION LETTER REVIEW Denied COMMUNITY DESIGN REVIEW COMMITTEE
DEVELOPMENT SERVICES

December 4, 2008

Steve Oliverio/David Whitney
The WLB Group, Inc.
4444 East Broadway Blvd.
Tucson, Arizona 85711

Subject: D07-0053 Call Center Employee Parking Development Plan

Dear Steve/David:

Your submittal of November 18, 2008 for the above project has been reviewed by the Community Design Review Committee and the comments reflect the outstanding requirements which need to be addressed before approval is granted. Please review the comments carefully. Once you have addressed all of the comments, please submit the following revised documents and a DETAILED cover letter explaining how each outstanding requirement has been addressed:

ALL BLACKLINES MUST BE FOLDED

2 Copies Revised Development Plan (Landscape, DSD)

2 Copies Revised Landscape Plan (Landscape, DSD)







Should you have any questions, please call me at 837-4919.

Sincerely,


Patricia Gehlen
CDRC Manager

All comments for this case are available on our website at http://www.ci.tucson.az.us/dsd/

Via fax: 881-7492
dp-resubmittal