Permit Number - D07-0030
Review Name: DEVELOPMENT PLAN
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
07/05/2007 FRODRIG2 START PLANS SUBMITTED Completed
07/09/2007 JIM EGAN COT NON-DSD FIRE Denied Portions of several buildings are over 300 feet from the existing hydrant. Another hydrant or automatic fire sprinklers will be required.
07/11/2007 TOM MARTINEZ OTHER AGENCIES AZ DEPT TRANSPORTATION Approved >>> "Douglas Kratina" <DKratina@azdot.gov> 07/11/2007 12:57 PM >>>
ADOT has NO COMMENT
D07-0030
LEADS. INC.
CIRCLE K STORE
07/17/2007 ED ABRIGO PIMA COUNTY ASSESSOR Passed
07/19/2007 KAROL ARAGONEZ ZONING REVIEW Denied CDRC TRANSMITTAL

TO: Development Services Department Plans Coordination Office

FROM: Karol Aragonez
Planner

PROJECT: D07-0030
Circle K Store
Development Plan

TRANSMITTAL DATE: July 19, 2007

DUE DATE: August 2, 2007

COMMENTS: Please resubmit revised drawings along a response letter, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed.

1. Section 5.3.8.2, LUC, permits a maximum of one year from the date of application to obtain approval of a development plan. If, at the end of that time, the development plan has not been approved, it must be revised to be in compliance with all regulations in effect at that time, and must be resubmitted for a full CDRC review. The one-year expiration date for this development plan is July 5, 2008.

2. All lettering and dimensions shall be the equivalent of twelve (0.12) point or greater in size. Please revise as necessary.
DS 2-05.2.1.C

3. List the rezoning case number C9-06-10 in the lower right corner next to the title block of all plan sheets including landscape and NPPO sheets. Please add all conditions of rezoning on the development plan preferably on the first sheet and provide a separate response letter detailing compliance with rezoning conditions as they apply to the development plan.
DS 2-05.2.1.K & DS 2-05.2.4.K

4. Case number D07-0030 has been assigned to this development plan (DP). Please place this number in the right corner of all sheets of the development plan, landscape plan, NPPO, and any other associated sheets.
DS 2-05.2.2.B.2

5. Please add to note on sheet 2 of 5 that project is designed to meet the overlay zone criteria of 2.8.4, Gateway Corridor Zone and 2.8.5, Airport Environs Zone (AEZ).
DS 2-05.2.2.B.10

6. Please revise proposed use to "general merchandise sales subject to 3.5.9.2.A" and specify the type of commercial use to be provided in phase 2. If phase 2 is the same use as phase 1 (general merchandise sales) then state that as proposed use. The commercial services use group has many different uses with many different parking requirements. Please be specific. Staff is continuing this review utilizing criteria required for general merchandise sales. If proposed uses require different parking calculations additional comments may be generated upon resubmittal of development plan.

7. As a general note list the area of the site by square footage and acreage.
DS 2-05.2.2.B.11

8. Please draw all existing easements on the plan along with recordation information, location, width, and purpose. If an easement is no longer in use and scheduled to be vacated or has been abandoned, so indicate. If none exist provide response to reviewer's comments. Also if easements are purposed please draw, dimension and label as to their purpose and whether they will be public or private. If none exist provide response to reviewer's comments.
DS 2-05.2.3.B & DS 2-05.2.4.G

9. Please provide the recordation information for Nogales Highway. Please relabel right-of-way distance for Valencia Road and Nogales Highway as being half (1/2) right-of-way dimensions. Indicate if there are existing sidewalks within both streets and provide dimensions of sidewalk accordingly. Provide location and width of existing curbs within both streets.
DS 2-05.2.3.C

10. A minimum distance of five (5) feet for a pedestrian refuge must be maintained between any enclosed structure and a PAAL and is to contain a minimum four (4) foot wide sidewalk that is set back one (1) foot from the PAAL and physically separated from the PAAL. Please provide on the south side of both proposed buildings.
DS 3-05.2.2.B.1

11. A sidewalk will be provided adjacent and parallel to any PAAL on the side where buildings are located. All sidewalks are to be flood free for all storm discharges of up to ten (10) year flood event. Sidewalks are to a minimum of four (4) feet wide and be installed to avoid any obstruction which decreases the minimum width to less than four (4) feet. The cross slope on all sidewalks will not exceed two (2) percent.
DS 2-08.4.1.B, DS 2-08.5.1.A & D

12. Please correct the provided parking shown for phase 1. Twenty-six spaces (26) spaces are shown on the plan view but the calculations indicate that twenty-four (24) spaces are provided.

13. Please correct the parking number provided for spaces east of phase 2 future building. Seven (7) spaces are shown but the number indicates that there are eight (8) spaces.

14. Nogales highway has a proposed MS&R right-of-way width of one hundred and twenty (120) feet which requires a taper. It appears that part of the site is within this intersection widening section. For Nogales Highway the taper has half R/W of seventy-five (675) feet in width for a length of three hundred (300) feet measured from the centerline of Valencia Road, then tapers for three hundred (300) feet to meet the future half R/W of sixty (60) feet. Please verify with City Engineering if this additional widening is required for this intersection.
DS 2-05.2.3.C & DS 2-05.2.4.F

15. Please revise the provided MS&R building setback from both streets. This measurement is taken from the future curb location within both streets and is the greater of twenty-one (21) or the building wall height. This will vary for Nogales Highway because of the required taper (see comment 13).

16. Within all development, a continuous accessible pedestrian circulation path is required. This path must connect all public access areas of the development and the pedestrian circulation path located in adjacent streets. All building within the site must be connected. Please provide a connection between the C-store and future building.
DS 2-08.3.1

17. Please provide at least one (1) four (4) foot wide sidewalk from the project site to Valencia Road and Nogales Highway. The sidewalks are to be located to minimize any conflict with vehicular access to the project.
DS 2-08.4.1.A

18. Please provide a detail of required curb ramps with truncated domes. Curb ramps or diagonal curb ramps shall be provided at all pedestrian crossings of vehicle use areas and streets where accessible routes are required. They shall be located so they do not project into vehicular traffic lanes, parking spaces, or parking access aisles. Ramps shall be located or protected to prevent their obstruction by parked vehicles.
ANSI 406

Curb ramps shall be a minimum of three (3) feet in width, exclusive of flared sides. The curb ramp flares shall not be steeper than 1:10. Counter slopes of adjoining gutters and road surfaces immediately adjacent to the curb ramp shall not be steeper than 1:20. The adjacent surfaces at transitions at curb ramps to walks, gutters and streets shall be at the same level. All slopes are to be indicated on the plan/plat and associated details.
ANSI 406.2, 3, & 4

The area covered by the truncated domes shall be twenty-four (24) inch deep and extend the full width of the ramp. Crosswalk, or access aisle, preceding the crosswalk or access aisle in the direction of pedestrian travel. The domes shall be located so the edge nearest the curb line is six (6) inches to eight (8) inches from the curb line.
ANSI 406.12, ANSI 705

19. Please correct the provided loading space note on sheet 1. The note indicates the size of the provided space as twelve (12) by fifty-nine (59) but the drawing shows the space as being twelve (12) by thirty-five (35).

20. The location for the loading space for the future building is within the twenty-four (24) foots wide PAAL. Please relocate space.

21. Please label that the bicycle parking required and provided for both phases is to be Class 2.

22. Per DS 2-09.4.1 Class 2 bicycle parking facilities will be located no more than fifty (50) feet from the main building entrance(s). Please verify main entrance to both buildings in relation to bicycle parking location.

23. Please provide a plan view detail of the proposed class 2 bicycle parking spaces. Single rack spaces placed in a row will allow a minimum of seventy -two (72) inch length per bicycle parking space and a minimum of thirty (30) inches between spaces of racks. A five (5) foot wide access aisle measured from the front or rear of the seventy-two (72) inch long parking space will be provided beside each row. Lighting will be provided such that all facilities are thoroughly illuminated and visible from adjacent sidewalks, parking lots, or buildings, during working hours. The surface of the facility can be surfaced the same as for motor vehicle parking or with a minimum of one (1) inch thickness of one-fourth (1/4) inch aggregate material.
DS 2-09.5.1, DS2-09.5.2, DS 2-09.5.4, & DS 2-09.6.2

24. Please add the boundary line between the CUZ-1 and CUZ-2; and NCD-65 and NCD-75 on the development plan.

25. The entire site is within the AEZ Airport Hazard District (AHD). No structure, use of land, or tree may exceed the height limitations by the Airport Hazard Districts within the Airport Environs Zone (AEZ). Refer to official maps established. Certain uses are prohibited from these districts as noted below and as determined by the Federal Aviation Administration (FAA). The height limits around Tucson International Airport are based on distances away from established ends of runways. Where two (2) or more height restrictions are placed on a parcel, the more restrictive height limit prevails. Height limit exceptions noted in Sec. 3.2.7.3 do not apply within the Airport Environs Zone (AEZ).
LUC 2.8.5.11

26. Please add the following notes to the development plan:
a. No more than one (1) employee for every two hundred fifty (250) square feet of GFA of all buildings on the project site at any time may be accommodated by intention, design, or in fact.
b. Structures or uses with fifty (50) or more employees must develop an emergency evacuation plan and training program and implement it as approved by the Fire Department.
c. Offices on site will be sound attenuated, to reduce the interior noise level to 45 Ldn or less, as specified by DS9-05.0.
d. Day care is a prohibited use within NCD-65 & NCD-70; elementary and secondary schools are prohibited in NCD-70 as noted on plan.
e. Special exception land uses within NCD-70 are per LUC Sec. 2.8.5.6.B.4
f. Any structure, use of land, or tree within the Airport Environs Zone (AEZ) which obstructs the space required for flight of aircraft in taking off and landing at an airport or is otherwise hazardous to aircraft taking off or landing are prohibited.

27. Please provide the maximum allowed FAR (0.90) and provided FAR.
LUC 3.2.3.2.B

28. Please advise to the origin of general note 8. New rezoning conditions would replace older annexation conditions.

29. Please relocate dimension provided on south of property for landscape border. It appears to read 1.01 feet instead of the actual 11.01.

30. Please correct permitting note 8. Remove "Board of Supervisors" and replace with "City of Tucson".

31. Per rezoning condition 2 please provide documentation of right-of-way dedication.
C9-06-10 Condition 2

32. Per rezoning condition 4 please provide copy of recorded airport disclosure statement. The statement must also be included as a note on the development plan.
C9-06-10 Condition 4

33. Per rezoning condition 5 PAALs and pedestrian access is to be designed and located on the site to allow future connectivity with adjacent parcels to the west and south. The development plan does not show these required connections. Please provide.
C9-06-10 Condition 5

34. Per rezoning condition 6 please add note if applicable stating outdoor lighting mounted on west or south building elevation shall be mounted at a minimum height to provide safe security lighting and shall be shielded so that bulb/element glare is not visible from adjacent properties.
C9-06-10 Condition 6

35. Per rezoning condition 7 please provide verification that the Dept. of Transportation has reviewed the project for compliance with future Regional Transportation Authority limited Parkway requirements as it applies to Valencia Road.
C9-06-10 Condition 7

36. Per rezoning condition 9 please provide verification that colored elevations that demonstrate architectural design elements comparable to front facade applied to side and rear of proposed structures have been supplied to the Department of Urban Planning and Design for review.
C9-06-10 Condition 9

37. Per rezoning condition 12 please provide verification that a category II traffic impact analysis was submitted.
C9-06-10 Condition 12

38. Per rezoning condition 19 and 20 provide a note on the development plan concerning all walls visible from public rights-of-way and/or adjacent residential development and their construction.
C9-06-10 Condition 19

39. Please indicate the location and type of postal service to assure there are no conflicts with other requirements. If mail is to be delivered to an area within a building please state so on the plan.
DS 2-05.2.4.V

40. All changes, modifications, and/or corrections must be made on all applicable plans including the development plan, landscape plan, and NPPO. Once changes, modifications, and/or corrections are made and reviewed further comments may result.


If you have any questions about this transmittal, please call Karol Aragonez, (520) 837-4960.

KAA S:\zoning review\karol\planning\cdrc\developmentplan\D07-0030dp.doc

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development plan and additional requested documents.
07/30/2007 PETER MCLAUGHLIN LANDSCAPE REVIEW Denied The Landscape Section does not recommend approval of the plans at this time due to inconsistencies with adopted codes and standards. The plan was reviewed for compliance with the Land Use Code (LUC), Development Standards (DS) and other applicable standards and guidelines referred to in the comments. Revise the plans as necessary to comply

1) The site is required to include screening per LUC Table 3.7.2-I. Revise as necessary. LUC 3.7.3 & DS 2-06.3.7.

2) All lettering and dimensions shall be the equivalent of twelve (0.12") point or greater in size. Revise sheet L-1 as necessary. DS 2-05.2.1.A

3) Canopy trees must be evenly distributed throughout the vehicular use area. Every parking space shall be located within forty (40) feet of the trunk of a canopy tree (as measured from the center of the tree trunk).
Revise the landscape plan as necessary. LUC 3.7.2.3.A

4) All disturbed, grubbed, graded, or bladed areas not otherwise improved shall be landscaped, reseeded, or treated with an inorganic or organic ground cover to help reduce dust pollution. Revise landscape plan to identify the type and locations proposed for inert ground cover materials (or seeded areas). A minimum two-inch layer is required.
LUC 3.7.2.7. DS 2-06.5.2.C

5) The area between the right-of-way line and sidewalk and the area between the sidewalk and the curb, if not covered with vegetation, shall be covered with an appropriate inorganic ground cover, such as decomposed granite. Revise the plans to clarify compliance. LUC 3.7.2.4.A.4

6) Provide a landscape plan for Phase 2 to accompany the proposed parking plan.

7) Revise the landscape plans to show the limits of grading. Clarify if Phase 2 is to be graded and indicate the type of dust control application. DS 2-07.2.2.B.5

8) Add the CDRC case number (D07-0030) and any related case numbers to the landscape plans. DS 2-07.2.1.B

9) Revise project note 2 on sheet L-1 to reference the Development Services Department Landscape Section rather than the Planning Department.

10) Submit an irrigation plan. LUC 3.7.4.5.C

11) Revise "Construction Notes" 6 & 10 on sheet C-3. They appear to transposed.

12) Revise the NPPO application to address existing mature vegetation at the southeast and southwest corners of the site. DS 2-15.2.0 & 2-15.3.0

13) Revise the landscape plans to show required pedestrian access paths to adjacent streets. DS 2-08.0

14) Revise the plans to provide an interior landscape border wherever the site is adjacent to R-2 or other residentially zoned property. LUC Table 3.7.2-I

15) Revise the plans to provide 6' high masonry screen walls for loading areas per LUC Table 3.7.2-I.
08/02/2007 CDRC1 OTHER AGENCIES PIMA ASSN OF GOVTS Approved CASE: D07-0030, CIRCLE K STORE, DEVEL PLAN

COMMENT: NO OBJECTIONS OR ADVERSE COMMENTS




Vehicle Trip Generation: Daily: 3,721 PM Peak:
267



Please call if you have questions



Tom Cooney, Travel Forecasting Manager

Pima Association of Governments

177 N. Church Ave, #405

Tucson, AZ 85701

Tel: (520) 792-1093, Fax: (520) 620-6981

Web: www.PAGnet.org and www.RTAmobility.com
08/02/2007 LIZA CASTILLO UTILITIES TUCSON ELECTRIC POWER Approved 4350 E. Irvington Road, Tucson, AZ 85714
Post Office Box 711, Tucson, AZ 85702


WR#185261 August 2, 2007




Dear Hank Hubert :

SUBJECT: CIRCLE K STORES
D07-0030


Tucson Electric Power Company has reviewed and approved the development plan submitted May 25, 2007. It appears that there are no conflicts with the existing facilities within the boundaries of this proposed development.

Enclosed is a copy of a TEP facilities map showing the approximate location of the existing facilities. Any relocation costs will be billable to the customer.

In order to apply for electric service, call the New Construction Department at (520) 918-8300. Submit a final set of plans including approved site, offsite and electrical load plans. Include a CD with the AutoCAD version of the plans. If easements are required, they will be secured by separate instrument. Your final plans should be sent to:

Tucson Electric Power Company
Attn: Ms. Mary Boice
New Business Project Manager
P. O. Box 711 (DB-101)
Tucson, AZ 85702
520-917-8732

Please call the area Designer Steve Garcia at (520) 917-8739, should you have any questions.


Sincerely,



Henrietta Noriega
Office Specialist
Design/Build
hn
Enclosures
cc: S. Garica
08/02/2007 KAY MARKS PIMA COUNTY ADDRESSING Denied 201 N. STONE AV., 1ST FL
TUCSON, AZ 85701-1207

KAY MARKS
ADDRESSING OFFICIAL
PH: 740-6480
FAX #: 740-6370


TO: CITY PLANNING
FROM: KAY MARKS, ADDRESSING OFFICIAL
SUBJECT: D07-0030 CIRCLE K STORE/DEVELOPMENT PLAN
DATE: 8/02/07



The above referenced project has been reviewed by this Division for all matters pertaining to street naming/addressing, and the following matters must be resolved prior to our approval:

1.) Delete direction from street names in Location Map.

2.) Label section corners on Location Map.

3.) Correct "A Portion of the Southeast Quarter" to "Northeast Quarter" in Title Block and in the heading on sheet 1.

4.) Add brief legal description that includes lot, subdivision name and Book and Page to Title Block.

5.) Correct Nogales Hwy to Nogales Highway on sheets 2 and 3.

es
08/03/2007 JOSE ORTIZ COT NON-DSD TRAFFIC Denied August 3, 2007
ACTIVITY NUMBER: D07-0030
PROJECT NAME: Circle K Store
PROJECT ADDRESS: Valencia /Nogales SWC
PROJECT REVIEWER: Jose E. Ortiz PE, Traffic Engineer

Resubmittal Required: Traffic Engineering does not recommend approval of the Development Plan; therefore a revised Development Plan is required for re-submittal.

The following items must be revised or added to the development plan.

1. Include a response letter with the next submittal that states how all comments have been addressed.

2. Call out the radius on all access curb returns. The access points shall have 25' radius curb returns. (DS 3-01.0 figure 6)

3. Provide six foot wide sidewalks along Valencia Rd and Nogales Hwy.

4. Remove striping annotation for bike lanes. This information will be provided on the PIA. Dimensions for new lanes shall remain.

5. A private improvement agreement (PIA) will be necessary for the proposed work to be performed within the Right-of-way. An approved tentative plat is required prior to applying for a PIA. Contact the PIA Coordinator for additional PIA information at 791-5550 ext. 1107.


If you have any questions, I can be reached at 791-4259 x76730 or Jose.Ortiz@tucsonaz.gov
08/06/2007 GLENN HICKS COT NON-DSD PARKS & RECREATION Approved DATE: August 06, 2007

TO: DSD_CDRC@ tucsonaz.gov

FROM: Glenn Hicks
Parks and Recreation
791-4873 ext. 215
Glenn.Hicks@tucsonaz.gov


SUBJECT: D07-0030 Circle K Store: Development Plan(7-06-07)

Staff has no comments.
08/07/2007 PGEHLEN1 TUCSON WATER NEW AREA DEVELOPMENT REVIEW Passed
08/07/2007 FRODRIG2 COT NON-DSD REAL ESTATE Denied >>> Jim Stoyanoff 08/07/2007 2:37 PM >>>
Denied, if any right of way needs to be dedicated per the re-zoning (conditions are required to be shown on the development plans) then submit the following items to the Real Estate Division;

Legal description and sketch for any area to be dedicated to the City and a title report dated within 30 days.
08/07/2007 TIM ROWE PIMA COUNTY WASTEWATER Denied July 16, 2007

To: Hank Hulbert
LEADS

Thru: Patricia Gehlen, CDRC Manager
City of Tucson Development Services Department

___________________________
From: Tom Porter, Sr. CEA (520-740-6579), representing the Pima County
Departments of Wastewater Management and Environment Quality

Subject: Circle K SWC E. Valencoa Road & S. Nogales HWY Tucson, AZ.
Dev. Plan - 1st Submittal
D07-030

The proposed sewer collection lines for the above-referenced project have been reviewed on behalf of the Pima County Department of Environmental Quality (PDEQ) and the Pima County Wastewater Management Department (PCWMD). This review letter may contain comments pertaining to the concerns of either Department. The following comments are offered for your use.

1. Obtain a letter from the PCWMD's Development Services Section, written within the past 90 days, stating that treatment and conveyance system capacity for the project is available in the downstream public sewerage system and provide a copy of that letter to this office. The required form to request such a letter may be found at:

http://www.pima.gov/wwm/forms/docs/CapResponseRequest.pdf.

The development plan for this project cannot be approved until a copy of this letter has been received by this office.

2. Show the jurisdiction's case number, D07-030, in or near the title block of each sheet. This case number should be shown larger and bolder than any associated cross-reference numbers.

3. Sheet 1: Show the public and private sewer lines using different line-types, so that they can readily be distinguished from each other. Also, show and describe examples of these different linetypes in the legend on Sheet 1.

4. Sheet 3: Sewer directional flow arrows are missing.

5. Sheet 3: The IMS#'s are missing for the existing public manholes along Nogales Hwy and Valencia Rd.. The sewer plan #'s are also missing. Also the existing sewer line show on plan is very hard to discern.

6. Sheet 3: The existing sewer lines and manholes should be marked as public and the pipe size should be clearly shown.

7. Sheet 3: The existing public sewer should be shown running north thru the intersection and running along Valencia north of the property.

8. Sheet 3: Both the rim and invert elevations should be shown for the cleanouts on site. The cleanouts should also be marked sequentially.

9. Sheet 3: The inverts should have a 2' drop at 2% over 100' for the sewer segment running along the east edge of property. The 4" private sewer line running from the public sewer and to the store should be marked as private BCS.

10. Sheet 3: The BCS should be a minimum of 2% slope for the entirety of its length.

This office will require a revised set of bluelines, and a response letter, addressing these comments. Additional comments may be made during the review of these documents.

Pima County Code Title 13.20.030.A.2 requires that a wastewater review fee be paid for each submittal of the development plan. The fee for the first submittal is $166 plus $50 per sheet. For the second submittal, the review fee is $50 per sheet. For all subsequent submittals, the review fee is $39 per sheet.

The next submittal of this project will be the second (2nd) submittal. A check for the review fee of this submittal in the amount of $100.00 (made out to PIMA COUNTY TREASURER) must accompany the revised set of blue lines and response letter.

If the number of sheets changes, please adjust the review fee accordingly.

If you have any questions regarding the above-mentioned comments, please contact me.
08/08/2007 ANDY VERA ENV SVCS REVIEW Denied 1. Sheet 4, Trash enclosure detail.
A. Require at minimum a 10 ft x 10 ft inside clear service area between the side and rear wall protectors and the front gates. DS 6-01.4.1.B & 6-01.4.2.C.2.
Inside clear deminsions must be shown from the face of the wall protectors not to center.
B. Recommend gates and/or post be installed to the face of the CMU wall with the gate opening 180 degrees or at minimum 12 ft with the steel sleeves appropriately positioned to secure gates within recommended positions.

2. DP sheet 2
Does not appear to be adequate access and manueverability to and from south enclosure area. DS 6-01.3.1.A & 6-01.4.1.A
Demonstrate, with deminsions, the required 14 ft x 40 ft clear approach. Service vehicle should be perpendicular to refuse enclosure 10 ft in front of the enclosure or 5 ft if gates open to 180 degrees.
Also show path lines with turning radii of service vehicle manuevering within development to each enclosure area and exiting. Require minimum of 3 ft clearance from parking spaces or structures for manuevering. See DS 6-01.0 Figure 1, turning radii.

Please correct on resubmittal.

3. Recommend south enclosure be positioned to a 30 degree angle to allow for adequate approach to refuse enclosure. Also recommend designing for a double enclosure, in place of the single enclosure shown, to accomodate for both garbage and recycle service since Circle K stores require both services/dumpsters.
08/10/2007 ROGER HOWLETT COT NON-DSD COMMUNITY PLANNING Denied DEPARTMENT OF URBAN PLANNING & DESIGN COMMENTS

Regarding

SUBJECT: Community Design Review Committee Application

CASE NUMBER: CASE NAME: DATE SENT

D07-0030 Circle K Store

() Tentative Plat
(X) Development Plan
(X) Landscape Plan
() Revised Plan/Plat
() Board of Adjustment
() Other

CROSS REFERENCE: C9-06-10

NEIGHBORHOOD PLAN: 12th -Valencia Rd Area Plan

GATEWAY/SCENIC ROUTE: Yes

COMMENTS DUE BY: August 2, 2007

SUBJECT DEVELOPMENT PLAN/PLAT HAS BEEN REVIEWED BY COMMUNITY PLANNING AND PRESERVATION, AND STAFF SUBMITS THE FOLLOWING COMMENTS:

() No Annexation or Rezoning Conditions, Not an RCP - No Comment
() Proposal Complies with Annexation or Rezoning Conditions
() RCP Proposal Complies with Plan Policies
(X) See Additional Comments Attached
() No Additional Comments - Complies With Planning Comments Submitted on:
(X) Resubmittal Required:
() Tentative Plat
(X) Development Plan
(X) Landscape Plan
() Other

REVIEWER: msp 791-4505 DATE: August 2, 2007

Department of Urban Planning and Design comments
D07-0030 Circle K Store: Development Plan
August 2, 2007

Please revise development plan to include as part of the general notes/rezoning notes, rezoning case C9-06-10. List all rezoning conditions (1 through 24), write the conditions verbatim as approved by Mayor and Council.

Please revise development plan and include as a general note the required documentation as outlined on rezoning case C9-0 6-10, condition # 4.

Please revise development plan to provide on-site parking access lanes (PAALS) and the on-site pedestrian circulation system to meet rezoning case C9-06-10, condition # 5.

Please revise development plant to show future on-site access points for PAALs and for on-site pedestrian circulation between phase I, phase II, and phase III development.

As a requirement of compliance on rezoning case C9-06-10, condition # 9, please provide building four sided building elevations for “Building A.” The sides and rear elevations of “Building A” will remain visible from both Valencia Road and the Nogales Highway until such time as Phase II and III are built out and until then, “Building A” will remain highly visible from all angles.
08/23/2007 JASON GREEN ENGINEERING REVIEW Denied DATE: August 23, 2006
SUBJECT: Circle K Development Plan- Engineering Review
TO: Patricia Gehlen, CDRC Manager
LOCATION: Parcel ID 138-16-001F, T15S R13E Sec13 Ward 1
REVIEWERS: Jason Green, CFM
ACTIVITY: D07-0030


SUMMARY: Engineering Division of Development Services Department has received and reviewed the proposed Development Plan and Drainage Statement (L.E.A.D.S., Inc., 28JUN07). Engineering Division does not recommend approval of the Development Plan at this time. The Drainage Statement was reviewed for Development Plan purposes only. The following items need to be addressed:


DRAINAGE STATEMENT: All Drainage Statements and reports submitted to the City of Tucson must follow the requirements outlined within the City of Tucson Development Standards Sections 10-01 and 10-02. These standards can be accessed online at http://www.tucsonaz.gov/dsd/DevStandsTOC.pdf.

1) Revise Section 5.0 and all hydrology calculations within the Drainage Statement to meet the minimum requirements outlined within DS Sec.10-02.4.2. The hydrology sheets must show that the areally reduced 100-year, one-hour rainfall depth from Table 4.1 is being used for all calculations. Refer to steps 1-19 within this section for determination of hydrology calculations. If the 2-hour storm event is being used for the hydrology calculations the minimum rainfall depth would be 3.42 inches (100-year return interval within a 1.0 or less square mile area is equal to a rainfall depth of 3.0 inches times a multiplication factor of 1.14 for the 2-hour storm would give you 3.42 inches), revise.

2) Revise the discussion within the Drainage Statement to include verbiage that the subject parcel is located within a balanced basin per the Balanced and Critical Basin Maps of Pima County and the City of Tucson. Per DS Sec.10-1.1.4 it is the policy that stormwater detention/retention facilities be incorporated within all new development to ensure that, at a minimum, the post development 2-, 10- and 100-year peak discharges from the site will not exceed the predevelopment values. Per Section 5.0 it is understood that the design is retaining all onsite flows, which would satisfy this requirement, however a balanced basin discussion is needed that state the minimum requirements have been met.

3) Dry wells are highly discouraged due to substantial drywell failure within the City of Tucson. Revise the Drainage Statement to include discussion on all requirements within DS 10-01.3.5.5 and 10-02.14.5 (1-10) for all systems, which utilize a method of subsurface disposal, i.e. dry wells and underground storage chambers. The Drainage Statement must meet or exceed the minimum criteria within both Development Standards.

4) The results of the required 30-foot-deep boring (DS Sec.10-02.14.2.6) should be examined to determine possible causes of slow infiltration or engineering measures needed to ensure infiltration. Threshold retention requirements may be waived in certain cases when stormwater retention is not feasible due to constraints imposed by subsurface conditions. In such cases detention criteria may be imposed in lieu of threshold retention requirements.

5) Floodplain Ordinance Tucson Code Section 26-10(c) states: The design of a detention or retention system, as reviewed and approved by the city engineer, shall include consideration of the degree of existing development within the basin and the capacity of the downstream drainage facilities. The systems will be designed with strict conformance to the public's health, safety and welfare. The effects of recharging storm runoff and possible pollution of the groundwater shall be evaluated for all systems employing infiltration systems, such as dry wells, in order to prevent contamination of the groundwater aquifer. The more technical requirements are listed in the City's drainage manual DS Sec.10-02.14.5. For review of a project we would need to see a Drainage Statement discussing and showing that the proposed dry well conforms to items 1-10 of this section.

6) Provide manufacture recommendations for maintenance of the underground stormwater retention/detention system. Revise the Drainage Statement and Development Plan to show that maintenance of the dry wells and underground stormwater retention/detention systems meets the recommendations of the manufacture.

7) Provide a geotechnical report that specifically assesses the proposed underground stormwater retention/detention system with dry wells beneath the pavement. The geotechnical report shall state whether the chambers are subject to collapsing or whether the pavement structure would be damaged from heavy traffic loads.

8) Provide references from the manufacture where these types of underground stormwater systems and dry wells have been used and their applicability to this project. All references should include use and maintenance of the underground stormwater system and how that system is achieving design criteria.

9) DS Sec. 3-01.4.4.F: Provide a revised Drainage Statement showing scupper calculations that demonstrate that the 10-year flood flow is contained under the sidewalk at all scupper concentration points. Provide details and dimensions in plan view for the scuppers on the proposed Development Plan.


DEVELOPMENT PLAN:

10) DS Sec.2-05.2.1.C: Verify that 12-point font is used throughout the Development Plan. Specifically within the legal description provided on Sheet C-1.

11) DS Sec.2-05.2.1.D: Revise the project location map on Sheet C-1 to identify conditions within the square mile area shown, such as major watercourses (Valencia and Airport Wash) and correctly label section corners.

12) DS Sec.2-05.2.1.J: Verify that all symbols used on the drawing are included within the legend, for example the proposed stormwater grate symbols shown on Sheets C-2 and C-3 must be included within the legend.

13) DS Sec.2-05.2.1.K: Provide the rezoning case number (C09-06-10) in the lower right hand corner next to the title block on all sheets. Please add all conditions of rezoning on the first sheet of the Development Plan and provide a separate response letter detailing compliance with rezoning conditions as they apply to the Development Plan.

14) DS Sec.2-05.2.1.K: The correct Development Plan number (D07-0006) may be added to the lower right hand corner of the plan on all sheets.

15) DS Sec.2-05.2.2.B.10: Revise the Note on Sheet C-2 to include verbiage that the project is also designed to meet the criteria of 2.8.4, Gateway Corridor Zone for Valencia Road. Provide additional Overlay notes as required.

16) DS Sec.2-05.2.3.A: Revise the basis of bearing shown on Sheet C-1 to read per the basis of bearing that is provided on Sheet C-2.

17) DS Sec.2-05.2.3.A: Clarify the difference in the Benchmark reference that is shown on Sheets C-1 and C-2. Either provide a discussion on the need for 2 different Benchmark or remove one from the Development Plan.

18) DS Sec.2-05.2.3.B: Verify that all easements as shown on the submitted Title Report are drawn with recordation information, location, width, and purpose of on the Development Plan. Specifically Items 4, 7 and 9.

19) DS Sec.2-03.2.3.C: Revise the Development Plan to provide for the intersection widening for Nogales Hwy and Valencia Road. Nogales Hwy has a proposed MS&R r-o-w of 120-feet which requires a taper. For Nogales Hwy the taper has ½ r-o-w of 75-feet in width for a length of 300-feet measured from the centerline of Valencia Road, then tapers for an additional 300-feet to meet the future ½ r-o-w of 60-feet. No improvements are allowed within this future r-o-w area. Contact Tucson Department of Transportation, Jose Ortiz, for clarity on the additional widening that is required for this intersection.

20) DS Sec.2-05.2.3.C: Provide the right-of-way (r-o-w) recordation information for Nogales Hwy. Label and dimension the shown r-o-w as the future or existing ½ r-o-w width for both Valencia Road and Nogales Hwy on the Development Plan.

21) DS Sec.2-05.2.3.C: Dimension from the centerline of both Valencia Road and Nogales Hwy the existing or proposed curb and 6-foot sidewalk.

22) DS Sec.2-05.2.3.E: Provide the City of Tucson field book number and page with datum reference for the existing and proposed spot elevations and topography used on the Development Plan.

23) DS Sec.2-05.2.4.D.3: Revise the Development Plan to relocate the proposed loading zone for the Phase II building outside of the required 24-foot PAAL. Loading zones can not be placed in a PAAL as to interfere with the minimum width requirement.

24) DS Sec.2-05.2.4.D.3: Depict and label the 25-feet radii concrete curbs per City of Tucson/Pima County Standard Detail 213 (PC/COT SD 213) at all of the driveway entrances. The curbs should be constructed at the edge of pavement, which must also be depicted on the Development Plan. Curb returns must be constructed entirely within the subject parcel

25) DS Sec.2-05.2.4.D.3: Verify that the Development Plan reflects handicap access ramps with truncated domes (see ANSI 705.5. for design criteria) at all existing and proposed handicap ramp location. Please refer to this standard and the figures provided for additional curb access ramps requirements.

26) DS Sec.2-05.2.4.D.3: Verify that all PAAL meet the minimum 24-foot width requirement. Specifically the PAAL located north of building II just south of the (2) 15-foot x 59-foot loading zones.

27) DS Sec.2-05.2.4.E: Revise the Development Plan to show all right-of-way dedications, specifically the intersection widening. Label both Valencia Road and Nogales Hwy as an MS&R. Per the rezoning condition #2 please provide documentation of right-of-way dedication.

28) DS Sec.2-05.2.4.F: Clarify the shown r-o-w width on the Development Plan for both Valencia Rd and Nogales Hwy. Label the r-o-w has a ½ right-of-way and revise to clarify if the shown r-o-w is existing or future.

29) DS Sec.2-05.2.4.G: Provide the location of all proposed utilities and provide any applicable easements for sewer, electric, water, gas, etc.

30) DS Sec.2-05.2.4.H: Dry wells are highly discouraged due to substantial drywell failure within the City of Tucson. Revise the Drainage Statement to include discussion on all requirements within DS 10-01.3.5.5 and 10-02.14.5 (1-10) for all systems, which utilize a method of subsurface disposal, i.e. dry wells and underground storage chambers. The Drainage Statement must meet or exceed the minimum criteria within both Development Standards.

31) DS Sec.2-05.2.4.H.3: The scuppers proposed under the sidewalk must be designed and constructed to convey the 10-year flood flow. Provide a revised Drainage Statement showing scupper calculations and design that demonstrate that the 10-year flood flow is contained under the sidewalk.

32) DS Sec.2-05.2.4.K: Provide a continuous pedestrian circulation path that connects all public access areas of the proposed buildings and the sidewalk areas located on Valencia Road and Nogales Hwy. Both buildings must also be connected with a pedestrian circulation path, provide a connection between the C-store and future building. Per DS Sec.2-08 sidewalks are to be flood free for all storm discharges of up to a ten (10) year flood, provide a revised Drainage Statement showing calculations, sizing and a detail for all sidewalk scuppers.

33) DS Sec.2-05.2.4.K: Revise the site plan to show the minimum distance of 5-feet for a pedestrian refuge that must be maintained between any enclosed structure and the proposed PAAL. The pedestrian circulation is required to be a minimum 4-foot wide and set back 1-foot from the PAAL and must be physically separated from the PAAL with curbing or 6" raised concrete sidewalk. Per DS 3-05.2.2.B.1 provide this circulation on the south side of both proposed buildings.

34) DS Sec.2-05.2.4.L: Revise the Development Plan and details to show the required 6-foot sidewalk along both abutting right-of-ways. Revise dimensions on Development Plan to show the proposed 6-foot wide sidewalk along Valencia Road and Nogales Hwy. Per the adopted Mayor and Counsel policy all sidewalks along MS&R right-of-ways for arterial and collector streets require 6-foot wide sidewalks. All sidewalks must comply with ADA accessibility requirements.

35) Revise the Development Plan to show the required conditions per rezoning condition #5. PAALs and pedestrian access is to be designed and located on the site to allow future connectivity with adjacent parcels to the west and south, verify.

36) DS Sec.2-05.2.4.T: Revise the detail dimensions for refuse containers, the enclosure must have a minimum inside clear dimension of 10 feet by 10 feet between the steel bollards that are required between the container and the enclosure's rear and sidewall. The inside clear dimensions must be shown from the face of the wall protectors not to center. Refer to DS Sec.6-01.4.2 for specifications and requirements on access, placement of containers, bin enclosure and construction.

37) DS Sec.2-05.2.4.T: Show maneuverability for the refuse vehicles in plan view. Label and show the turning radius. Specifically show the required 14-foot x 40-foot clear approach for the refuse container located along the south of the property. Refuse vehicle should be perpendicular to the refuse enclosure 10-foot in front of the enclosure or 5-foot if gates open to 180 degrees.

38) DS Sec.2-05.2.4.U: Indicate graphically, where possible, and by notes, in all other instances, compliance with conditions of rezoning, specifically for engineering:

a) Rezoning Condition # 2- The owner/developer shall dedicate the applicable r-o-w along Valencia Road and Nogales Hwy street frontage including applicable intersection widening.
b) Rezoning Condition # 3- The owner/developer shall dedicate a 30-foot radius spandrel at the northeast corner of the site.
c) Rezoning Condition # 5- Parking area access lanes and on-site pedestrian circulation systems shall be designed and located on the site to allow for future connectivity with the adjacent parcels to the west and south.
d) Rezoning Condition # 7- Prior to Development Plan approval, the Department of Transportation shall review the project for compliance with future Regional Transportation Authority limited Parkway requirements as it applies to Valencia Road.
e) Rezoning Condition # 10- The owner/developer shall construct a bus pull-out/pull-through and a bus shelter on the Old Tucson-Nogales Hwy (US 89) as determined by the Department of Transportation. Provide approval for the proposed bus shelter shown on the Development Plan.
f) Rezoning Condition # 16- The owner/developer shall provide for signal improvements at the intersection of Valencia Road and Nogales Hwy not to exceed $25,000.
g) Rezoning Condition # 21- An archaeological assessment and survey shall be performed by a qualified archaeologist before any grading or other ground modification takes place.

39) DS Sec.11-01.2.1: Provide estimated cut and fill quantities on the Development Plan for grading plan purposes.

40) DS Sec.10-02.14.3.2: Provide a note on the site plan stating that, (a) the owner or owners shall be solely responsible for operation, maintenance, and liability for drainage structures, underground Contech stormwater retention system and the Envibro dry well system; (b) that the owner or owners shall have an Arizona Registered Professional Civil Engineer prepare a certified inspection report for the drainage and detention/retention facilities at lease once every 6-months, and that these regular inspection reports will be on file with the owner for review by City staff, upon written request; (c) that City staff may periodically inspect the drainage and retention/detention facilities to verify that scheduled and unscheduled maintenance activities are being performed adequately; and (d) that the owner or owners agree to reimburse the City for any and all costs associated with the maintaining of the drainage structures, underground Contech stormwater retention system and the Envibro dry well system, should the City find the owner or owners deficient in their obligation to adequately operate and maintain their facilities."

41) A private improvement agreement (PIA) is required for the proposed work within the public right-of-way. An approved site plan is required prior to applying for a PIA. Contact the PIA Coordinator for additional PIA information at 791-5550 ext. 1107.

42) Review and approval from TDOT Permits and Codes for all improvements within the public right-of-way will be required. A right-of-way use permit application will be required prior to construction. Refer to the following links for TDOT Forms and applications:

a) http://www.tucsonaz.gov/dsd/Forms_Fees___Maps/Applications/applications.html /

b) http://www.dot.ci.tucson.az.us/engineering/pia.php

c) Or contact Steve Tineo at 741-3115 for all additional questions regarding r-o-w.


GEOTECHNICAL REPORT:

43) DS Sec.10-02.14.2.6: A geotechnical evaluation needs to be submitted for review, addressing the following:

a) Soils report should provide conformance with DS section 10-02.14.2.6 regarding 30-foot boring for the proposed retention systems, and provide discussion of potential for hydro-collapsible soils and any recommendation for setbacks from building to proposed retention systems.

b) The soils report shall provide identification / assessment of any potentially hazardous geotechnical areas, and state any geotechnical recommendations and whether there are special provisions for the soil preparation for this development.

c) Provide slope stability recommendations for any proposed constructed slopes.

d) Provide pavement structure design recommendations.

e) Provide infiltration rates for detention/retention design. If underground stormwater chambers and dry wells are proposed for the retention requirements a pre- and post percolation test will be required to assure that the system drains within the required time limit of 12-hours.


GRADING PLAN:

44) DS Sec.11-01.2.1: A grading permit will be required for this. A grading plan and a grading permit application will be required after Development Plan approval and prior to any construction activity. A grading permit may not be issued prior to Development Plan approval. Subsequent comments may be necessary, depending upon the nature and extent of revisions that occur to the Development Plans

45) Please ensure that any future grading plan will be consistent with the Development Plan, Drainage Statement, and geotechnical report. Grading standards may be accessed at: http://www.ci.tucson.az.us/dsd/DevStandsTOC.pdf

46) Arizona Pollutant Discharge Elimination System (AZPDES) requirements are applicable to this project. Stormwater Pollution Prevention Plans (SWPPP) and text addressing stormwater controls for all areas affected by construction activities related to this development will be required with a grading plan submittal. For further information, visit www.adeq.state.az.us/environ/water/permits/stormwater.html.

47) Provide a general note on the Development Plan that references the City of Tucson Development Standard 11-01.0 (excavation and grading requirements).


GENERAL COMMENTS:

Please provide a revised Development Plan, a revised Drainage Statement, and a geotechnical report that address the comments provided above. Include a comprehensive response letter addressing in detail responses to all of the above comments.

Further comments may be generated upon resubmittal of the Development Plan, Drainage Statement, and geotechnical report reviews.

For any questions, or to schedule a meeting call me at 837-4929.



Jason Green, CFM
Senior Engineer Associate
Engineering Division
Development Services
08/27/2007 PATRICIA GEHLEN ZONING-DECISION LETTER REVIEW Denied COMMUNITY DESIGN REVIEW COMMITTEE
DEVELOPMENT SERVICES

August 27, 2007

Hank Hulbert
LEADS, Inc.
2400 North Central Avenue, Suite 203
Phoenix , Arizona 85004

Subject: D07-0030 Circle K Store Development Plan

Dear Hank:

Your submittal of July 6, 2007 for the above project has been reviewed by the Community Design Review Committee and the comments reflect the outstanding requirements which need to be addressed before approval is granted. Please review the comments carefully. Once you have addressed all of the comments, please submit the following revised documents and a DETAILED cover letter explaining how each outstanding requirement has been addressed:

ALL BLACKLINES MUST BE FOLDED

11 Copies Revised Development Plan (Fire, Zoning, Landscape, Addressing, Traffic, Wastewater, Real Estate, ESD, DUPD, Engineering, DSD)

5 Copies Revised Landscape Plan (Zoning, Landscape, DUPD, Engineering, DSD)

2 Copies Revised NPPO Plan (Landscape, DSD)

2 Copies Revised Drainage Report (Engineering, DSD)

2 Copies Geotechnical Report (Engineering, DSD)

3 Copies Color Elevations (DUPD, Zoning, DSD)


Should you have any questions, please call me at 837-4919.

Sincerely,

Patricia Gehlen
CDRC Manager

All comments for this case are available on our website at http://www.ci.tucson.az.us/dsd/
Via fax: (602) 254-1700