Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL - CDRC - DEV PLAN
Permit Number - D07-0022
Review Name: RESUBMITTAL - CDRC - DEV PLAN
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/04/2007 | FERNE RODRIGUEZ | START | PLANS SUBMITTED | Completed | |
| 10/16/2007 | KAROL ARAGONEZ | ZONING | REVIEW | Approv-Cond | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: Karol Aragonez Planner PROJECT: D07-0022 Davis Selected Advisers Development Plan TRANSMITTAL DATE: October 16, 2007 DUE DATE: October 31, 2007 COMMENTS: The Zoning Review Section approves the development plan for this project, subject to the following changes on the sign-off copies. However, should there be any changes requested by other CDRC members, the Zoning Review Section approval is void, and we request copies of the revised development plan to verify that those changes do not affect any zoning requirements. 1. Please revise detail 9/4. Correct handicap signage height placement to a minimum of seven (7) feet as required by TDOT. 2. Please revise location of truncated domes leading into access aisle of the handicap parking east of the building. All accessible curb ramps shall have truncated domes installed that shall be twenty-four (24) inches minimum in the direction of travel and extend the full width of the access aisle. The domes shall be located so the edge is six (6) inches to eight (8) inches from the access aisle. This is to alert sight impaired individuals that they are leaving the pedestrian path and entering onto a vehicle use area. ANSI 406.12, ANSI 705 If you have any questions about this transmittal, please call Karol Aragonez, (520) 837-4960. KAA S:\zoning review\karol\planning\cdrc\developmentplan\D07-0022dpr.doc |
| 10/31/2007 | ANDY VERA | ENV SVCS | REVIEW | Denied | Sheet 4, Enclosure detail must show the abilty to secure the gates in the open position as well as the closed position. Not shown or annotated as previously noted. |
| 11/04/2007 | ELIZABETH EBERBACH | ENGINEERING | REVIEW | Approved | TO: Patricia Gehlen; CDRC Coordinator SUBJECT: Davis Selected Advisors Development Plan 2nd resubmittal Engineering Review LOCATION: T15S R14E Section 9, Ward 5, Tucson International Gateway Center lot 14 REVIEWER: Elizabeth Eberbach ACTIVITY NUMBER: D07-0022 SUMMARY: The revised Development Plan package was reviewed in a meeting on 1NOV07 and discussed on 26OCT07. A revised drainage report was submitted 2NOV07. Engineering has reviewed the revised items and recommends approval of the Development Plan. Once all reviewing entities have approved the Development Plan, the Grading Plan may be approved by Engineering, with the condition that there are no vegetative conflicts within the SVT's. If you have any questions, please call me at 837-4934. Elizabeth Eberbach, PE Civil Engineer Engineering Division Development Services |
| 11/06/2007 | PATRICIA GEHLEN | ZONING-DECISION LETTER | REVIEW | Approv-Cond | COMMUNITY DESIGN REVIEW COMMITTEE DEVELOPMENT SERVICES November 6, 2007 Becky Hammond Engineering and Environmental Consultants, Inc. 4625 East Fort Lowell Road, Suite 200 Tucson, Arizona 85712 Subject: D07-0022 Davis Selected Advisors Development Plan Dear Becky: The above referenced development plan has been CONDITIONALLY APPROVED by the Community Design Review Committee. Once the necessary corrections are made per the on line comemnts, please submit the following documents for sign-off. 1 Double Matte right-reading Océ or Photo Mylar of the COMPLETE SET of the Development Plan, Landscape Plan, and the Native Plant Preservation Plan (if part of the original submittal). AND 1 Double Matte right-reading Océ or Photo Mylar of the Development Plan. AND 1 CD that contains all of the drainage/hydrology and other reports submitted for the review and approval of this plan. The extra Double Matte right-reading Océ or Photo Mylar that you submit will be delivered to Pima County for permanent recording. Additional blackline copies will be made from the complete mylar set and distributed to various review agencies for their files. These copies will be ordered from the City's contracted print company and billed to you unless you already have an account at another printing company. Please let us know which printing company you would prefer to use and list them on your attached transmittal form when submitting your mylars to the CDRC office for sign-off approval. Your printing company will deliver the mylar and two (2) blackline copies to your office. If you are out of town you will need to contact the printing company for pick up or mailing arrangement options. TO ENSURE A MORE RAPID REVIEW OF THE MYLARS, PLEASE HAVE THE CITY OF TUCSON APPROVAL STAMP PLACED ON EACH SHEET OF THE SUBMITTAL SET, PREFERABLY IN THE LOWER RIGHT HAND CORNER NEAR THE TITLE BLOCK. THE STAMP IS LOCATED AT http://www.ci.tucson.az.us/dsd/CDRC Rezoning/CDRC/CDRC Stamp/cdrc stamp.html. PRIOR TO SUBMITTING THE MYLARS TO THE CDRC OFFICE, THEY MUST BE REVIEWED AND APPROVED BY PIMA COUNTY WASTEWATER AND CITY OF TUCSON ENVIRONMENTAL SERVICES DEPARTMENT. APPROVAL MUST BE IN A WRITTEN FORMAT TO THE CDRC OFFICE (E-MAIL IS OKAY) Should you have any questions, please call me at 837-4919. Sincerely, Patricia Gehlen CDRC Manager All comments for this case are available on our website at http://www.ci.tucson.az.us/dsd/ Via fax: 321-0333 |
| 11/06/2007 | PGEHLEN1 | PIMA COUNTY | WASTEWATER | Approv-Cond | per the 2nd review comments. |
| 11/06/2007 | PATRICIA GEHLEN | ZONING-DECISION LETTER | REVIEW | Approv-Cond | November 16, 2007 To: Becky Hammond, EEC, Inc. Thru: Patricia Gehlen, CDRC Manager City of Tucson Development Services Department ____________________________________ From: Tom Porter, Sr. CEA (520-740-6579), representing the Pima County Departments of Wastewater Management and Environmental Quality Subject: Davis Selected Advisers, Lots 13 & 14 Development Plan – 3rd Submittal D07-0022 The proposed sewer collection lines for the above-referenced project have been reviewed on behalf of the Pima County Department of Environmental Quality (PDEQ) and the Pima County Wastewater Management Department (PCWMD). This review letter may contain comments pertaining to the concerns of either Department. The following comments are offered for your use. The Pima County Department of Environmental Quality and Wastewater Management Department hereby approve the above referenced submittal of the development plan as submitted. Please note the following: Approval of the above referenced submittal does not authorize the construction of public or private sewer collection lines, or water distribution lines. Prior to the construction of such features, a Construction Authorization (Approval To Construct) may need to be obtained from the Pima County Environmental Quality. Also, air quality activity permits must be secured by the developer or prime contractor from the Pima County Department of Environmental Quality before constructing, operating or engaging in an activity which may cause or contribute to air pollution. If you have any questions regarding the above mentioned comments, please contact me . |