Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: D07-0008
Parcel: 14122004G

Address:
8500 S RITA RD

Review Status: Completed

Review Details: CORE REVIEW

Permit Number - D07-0008
Review Name: CORE REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/07/2009 DAVID RIVERA ZONING REVIEW Approv-Cond CDRC TRANSMITTAL

TO: Development Services Department Plans Coordination Office
FROM: David Rivera
Principal Planner

PROJECT: D07-0008
Global Solar Energy
Revised Development Plan

TRANSMITTAL DATE: January 7, 2009

DUE DATE: January 26, 2009

COMMENTS: Conditional Approval

1. Zoning conditionally approves the development plan pending approval by the Fire Department. It is not clear if the relocation of the fence and gate will create any problems for fire access. If so what type of lock box is proposed and is this area location that would have to be accessed by Fire in case of an emergency. If Fire was not included in the Core Review, confirmation from Dave Mann is needed related to the gate and fence location.

The applicable landscape plan sheet must be revised to match the changes made to the development plans sheet.

If you have any questions about this transmittal, please call David Rivera, (520) 791-5608.

C:\planning\cdrc\developmentplan\D070008dpcarev.doc
01/13/2009 PAUL MACHADO ENGINEERING REVIEW Approv-Cond To: Patricia Gehlen DATE: January 13, 2009
CDRC/Zoning Manager

SUBJECT: Global Solar Energy, 8500 S. Rita Ranch Road
Development Plan D07-0008 Revision No. 4, (First Review)
T15S, R15E, Section 28

RESUBMITTAL REQUIRED: Development Plan and Drainage Statement.

The Development Plan (DP) and Drainage Statement (DS) cannot be approved as submitted. Please address the following review comments prior to the next submittal.

Development Plan:

1. Provide a response letter to the comments along with the corrected copies of the DP.
2. The DP has been cond.-appr. provided all comments have been addressed correctly. Contact Paul P. Machado for any questions regarding the following comments.
3. Show a detail along with a cross-section of the containment pads and coordinate the plans with the architectural plans i.e.: "See architectural plans for details…..".
4. Show details of the sump pits.
5. Show height of pipe-bridge for vehicles crossing underneath.
6. Show distance between containment pads and edge of pavement.
7. Revise revision block to reflect the most recent revision.

Drainage Statement:
1. Please include a response letter to the comments along with the corrected copies of the DS.
2. A Drainage Statement is a brief description of drainage conditions applicable for a site which are not affected by 100 year flows of 100 cfs, of more……per S.M.D.D.F.M., chap. II, 2.1.2. The DS must be submitted along with the site plan and accepted with the approval of the grading plan.
3. The content and format of the Drainage Statement should follow S.M.D.D.F.M., chap. II, 2.2.
4. Show the project address or administration address on the cover sheet of the DS.

If you have any questions, I can be reached at 837-4932 or Paul.Machado@ci.tucsonaz.govs
Paul P. Machado
Senior Engineering Associate
City of Tucson/Development Services Department
201 N. Stone Avenue
P.O. Box 27210
Tucson, Arizona 85726-7210
(520) 837-4932 office
(520) 879-8010 fax, C:/8500 S. Rita Ranch Rd CDRC_REV_4
01/14/2009 JOE LINVILLE LANDSCAPE REVIEW Approved
01/21/2009 RONALD BROWN ZONING HC SITE REVIEW Approved
01/27/2009 LIZA CASTILLO UTILITIES TUCSON ELECTRIC POWER Approved 4350 E. Irvington Road, Tucson, AZ 85714
Post Office Box 711, Tucson, AZ 85702


WR#207238 January 27, 2009

DOWLHKM
Attn: Richard Cordova
166 W Alameda
Tucson, AZ 85701

To Mr. Cordova:

SUBJECT: Global Solar Energy – New Facility - Revision
D07-0008


Tucson Electric Power Company has reviewed and approved the development plan submitted January 20, 2009 It appears that there are no conflicts with the existing facilities within the boundaries of this proposed development.

Enclosed is a copy of a TEP facilities map showing the approximate location of the existing facilities. There is a 138K V line and an underground Feeder line along Houghton Road that doesn’t appear to be in conflict. The customer is responsible for the new trenching to relocate them as well as the relocation cost.

In order to apply for electric service, call the New Construction Department at (520) 918-8300. Submit a final set of plans including approved site, offsite and electrical load plans. Include a CD with the AutoCAD version of the plans. If easements are required, they will be secured by separate instrument. Your final plans should be sent to:

Tucson Electric Power Company
Attn: Rich Harrington
New Business Project Manager
P. O. Box 711 (DB-101)
Tucson, AZ 85702
520-918-8726

Please call the area Designer Warren McElyea at (520) 918-8268, should you have any questions.


Sincerely,



Henrietta Noriega
Office Specialist
Design/Build
hn
Enclosures
cc: City of Tucson (Email only)
W. McElyea Tucson Electric Power
01/27/2009 FERNE RODRIGUEZ PIMA COUNTY WASTEWATER Denied January 26, 2009

To: Richard Cordova
DOWL Engineers

Thru: Patricia Gehlen, CDRC Manager
City of Tucson Development Services Department

From: Chandubhai C. Patel, P.E., Civil Eng. Manager
Development Review Division ( Wastewater)

Subject: Global Solar Energy New Facility
Development Plan (Revised)– 1st Submittal, D07-008

The proposed sewer collection lines for the above-referenced project have been reviewed on behalf of the Pima County Department of Environmental Quality (PDEQ) and the Pima County Regional Wastewater Reclamation Department (PCRWRD). This review letter may contain comments pertaining to the concerns of either Department. The following comments are offered for your use.


Provide a letter from PCRWRD Capacity Management Section, written within the past 90 days, stating that the treatment and conveyance system capacity for this project is available. A capacity request form may be found at http://www.pima.gov/wwm/forms/docs/CapResponseRequest.pdf

Sheet 1, LEGEND: Show the legends for existing and proposed sewer lines using different line types and identify them as public or private sewers.

Sheet 2 & 3: Differentiate between existing and proposed sewer lines using different line types.

Sheet 2 & 3: Show the flow direction arrows for the sewer lines.

5. Sheet 1: It is noticed that the new private sewers will be connected to the existing private sewer. If this is true, Add a General Note that states:

THE ON-SITE SANITARY SEWERS WILL BE PRIVATE AND WILL BE CONSTRUCTED, OPERATED AND MAINTAINED ON A PRIVATE BASIS, AND IN ACCORDANCE WITH AN APPROVED OPERATION AND MAINTENANCE PLAN, IF REQUIRED. NO NEW CONNECTION TO AN EXISTING PUBLIC SANITARY SEWER IS PROPOSED.

Add a General Note:

HIS PROJECT HAS --------- PROPOSED AND--------- EXISTING WASTEWATER FIXTURE UNIT EQUIVALENTS, PER TABLE 13.20.040(F)(1) in PIMA COUNTY CODE 13.20.040(F)

and fill in the blanks.

If you have any questions regarding the above mentioned comments, please contact me .
02/02/2009 ANDY VERA ENV SVCS REVIEW Approved
02/05/2009 PATRICIA GEHLEN ZONING-DECISION LETTER REVIEW Denied COMMUNITY DESIGN REVIEW COMMITTEE
DEVELOPMENT SERVICES

February 5, 2009

Richard Corodova
DOWL Engineers
166 W Alameda
Tucson, Arizona 85701

Subject: D07-0008 Global Solar Energy Facility Revised Development Plan

Dear Richard:

Your submittal of December 24, 2008 for the above project has been reviewed by the Community Design Review Committee and the comments reflect the outstanding requirements which need to be addressed before approval is granted. Please review the comments carefully. Once you have addressed all of the comments, please submit the following revised documents and 3 sets of the DETAILED cover letter explaining how each outstanding requirement has been addressed:

ALL BLACKLINES MUST BE FOLDED

3 Copies Revised Development Plan (Engineering, Wastewater, DSD)

Copies Revised Landscape Plan (Engineering, DSD)

2 Copies Revised Drainage Statement (Engineering, DSD)




Should you have any questions, please call me at 837-4919.

Sincerely,


Patricia Gehlen
CDRC Manager

All comments for this case are available on our website at http://www.ci.tucson.az.us/dsd/

Via fax: 624-0384
dp-resubmittal
12/24/2008 FERNE RODRIGUEZ START PLANS SUBMITTED Completed
12/29/2008 JOSE ORTIZ COT NON-DSD TRAFFIC Approved
12/29/2008 JIM EGAN COT NON-DSD FIRE Approved