Permit Number: D07-0008
Parcel: 14122004G

Address:
8500 S RITA RD

Review Status: Completed

Review Details: REVISION - DEV PLAN

Permit Number - D07-0008
Review Name: REVISION - DEV PLAN
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
05/07/2008 FERNE RODRIGUEZ START PLANS SUBMITTED Completed
05/08/2008 JIM EGAN COT NON-DSD FIRE Approved
05/23/2008 JOE LINVILLE LANDSCAPE REVIEW Approved
05/27/2008 TERRY STEVENS ZONING REVIEW Denied CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: Terry Stevens
Lead Planner

PROJECT: D07-0008
Global Solar Energy
Development Plan --Revision

TRANSMITTAL: 05/28/2008

DUE DATE: 06/05/08

COMMENTS:

1. Section 5.3.8.2, LUC, permits a maximum of one year from the date of application to obtain approval of a development plan. If, at the end of that time, the development plan has not been approved, it must be revised to be in compliance with all regulations in effect at that time, and must be resubmitted for a full CDRC review. The one-year expiration date for this development plan is 05/06/09.

2. DS 2-05.2.2.A.1 List the names, addresses, and telephone numbers of the primary property owner of the site and developer of the project.

3. DS 2-05.2.3.B All easements shall be drawn on the plan. The recordation information, location, width, and purpose of all easements on site will be stated.

On sheet 3A of 4 in the easement information portion of the plan, keynote #8 indicates a communication easement. Clearly indicate on the plan the location, width, recordation information, and purpose of the easement. If the solar panels are to be constructed over the easement provide documentation from the affected utility approving construction within the easement.

Provide on the plan the recordation information (docket and page) for all easements which have been indicated on the plan as being recorded by separate instrument.

Provide recordation information (docket and page) for the abandonment of the easement indicated in keynote #5 on page 3 of 4.

4. Per DS 3-05.2.3.C.1 A vehicular use area must be provided with post barricades or wheel stop curbing designed to prevent parked vehicles from extending beyond the
property lines; damaging adjacent landscaping, walls, or buildings; or overhanging adjacent sidewalk areas or unpaved areas on or off site and to prevent vehicles from driving onto unimproved portions of the site.

Are overhead vehicular use doors being install on the south side of the building where the pavement is indicated adjoining the building? Clearly indicate location of doors. If doors are not being installed and these areas are for vehicle maneuverability only then wheel stop curbing or barriers are required to prevent damage to the building. (minimum 2'-6" from building to barriers)

Wheel stop curbing or barriers are required along the PAALs wherever there is not fencing to act as a barrier. Required at the south end of the north/south PAAL. Required along the north and west side of the PAAL near substation #6.

If you have any questions about this transmittal, please call Terry Stevens, (520) 837-4961

TLS C:\planning\cdrc\developmentplan\D07-0008-r2dp.doc
05/30/2008 ROGER HOWLETT COT NON-DSD COMMUNITY PLANNING Approved DEPARTMENT OF URBAN PLANNING & DESIGN COMMENTS

Regarding

SUBJECT: Community Design Review Committee Application

CASE NUMBER: CASE NAME: DATE SENT

D07-0008 Global Solar Energy New Facility 05/29/08

( ) Tentative Plat
(XXXX) Development Plan
(XXXX) Landscape Plan
( ) Revised Plan/Plat
( ) Board of Adjustment
( ) Other

CROSS REFERENCE: C9-84-84 & C15-00-04

NEIGHBORHOOD PLAN: Esmond Station

GATEWAY/SCENIC ROUTE:

COMMENTS DUE BY: 06/05/08

SUBJECT DEVELOPMENT PLAN/PLAT HAS BEEN REVIEWED BY DEPARTMENT OF URBAN PLANNING AND DESIGN, AND STAFF SUBMITS THE FOLLOWING COMMENTS:

( ) No Annexation or Rezoning Conditions, Not an RCP - No Comment
(XXXX) Proposal Complies with Annexation or Rezoning Conditions
( ) RCP Proposal Complies with Plan Policies
( ) See Additional Comments Attached
( ) No Additional Comments - Complies With Planning Comments Submitted on:
( ) Resubmittal Required:
( ) Tentative Plat
( ) Development Plan
( ) Landscape Plan
( ) Other

REVIEWER: drcorral 791-4505 DATE: May 19, 2008
06/09/2008 GLYNDA ROTHWELL UTILITIES TUCSON ELECTRIC POWER Approved SUBJECT: Global Solar Energy - New Facility Revision
D07-0008


Tucson Electric Power Company has reviewed and approved the development
plan submitted May 23, 2008. It appears that there are no conflicts
with the existing facilities within the boundaries of this proposed
development.
06/11/2008 PAUL MACHADO ENGINEERING REVIEW Denied To: Patricia Gehlen DATE: June 17, 2008
CDRC/Zoning Manager

SUBJECT: Global Solar Energy, 8500 S. Rita Ranch Road
Development Plan D07-0008 Revision (First Review)
T15S, R15E, Section 28

RESUBMITTAL REQUIRED: Development Plan and Drainage Statement.

The Development Plan (DP) and Drainage Statement (DS) cannot be approved as submitted. Please address the following review comments prior to the next submittal.

Development Plan:

1. Please include a response letter to the comments along with the corrected copies of the DP.
2. Address the existing drainage and what will be used in place of the rip-rap being removed.

Drainage Statement:
1. The DS is accepted by engineering for DP purposes only.
2. Describe why the rip-rap that was removed and what will used in its place.

If you have any questions, I can be reached at 791-5550 x1193 or Paul.Machado@ci.tucsonaz.govs
Paul P. Machado
Senior Engineering Associate
City of Tucson/Development Services Department
201 N. Stone Avenue
P.O. Box 27210
Tucson, Arizona 85726-7210
(520) 837-4932 office
(520) 879-8010 fax,
C:/8500 S. Rita Ranch Rd CDRC_REV_2
06/19/2008 PATRICIA GEHLEN ZONING-DECISION LETTER REVIEW Denied COMMUNITY DESIGN REVIEW COMMITTEE
DEVELOPMENT SERVICES

June 19, 2008

Richard Corodova
DOWL Engineers
166 W Alameda
Tucson, Arizona 85701

Subject: D07-0008 Global Solar Energy Facility Revised Development Plan

Dear Richard:

Your submittal of May 7, 2008 for the above project has been reviewed by the Community Design Review Committee and the comments reflect the outstanding requirements which need to be addressed before approval is granted. Please review the comments carefully. Once you have addressed all of the comments, please submit the following revised documents and a DETAILED cover letter explaining how each outstanding requirement has been addressed:

ALL BLACKLINES MUST BE FOLDED

3 Copies Revised Development Plan (Engineering, Zoning, DSD)

3 Copies Revised Landscape Plan (Zoning, Engineering, DSD)

2 Copies Revised Drainage Statement (Engineering, DSD)




Should you have any questions, please call me at 837-4919.

Sincerely,


Patricia Gehlen
CDRC Manager

All comments for this case are available on our website at http://www.ci.tucson.az.us/dsd/

Via fax: 624-0384
dp-resubmittal