Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL - CDRC - DEV PLAN
Permit Number - D07-0002
Review Name: RESUBMITTAL - CDRC - DEV PLAN
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 05/15/2007 | FRODRIG2 | PIMA COUNTY | WASTEWATER | Approved | May 11, 2007 To: Kevin Hall, DCC Company Thru: Patricia Gehlen, CDRC Project Manager City of Tucson Development Services Department ____________________________________ From: Tom Porter (520-740-6579), representing the Pima County Departments of Wastewater Management and Environmental Quality Subject: Ace Hardware at Bear Canyon Road Development Plan – 2nd Submittal D07-0002 The proposed sewer collection lines for the above-referenced project have been reviewed on behalf of the Pima County Department of Environmental Quality (PDEQ) and the Pima County Wastewater Management Department (PCWMD). This review letter may contain comments pertaining to the concerns of either Department. The following comments are offered for your use. The Pima County Department of Environmental Quality and Wastewater Management Department hereby approve the above referenced submittal of the development plan as submitted. Please note the following: Approval of the above referenced submittal does not authorize the construction of public or private sewer collection lines, or water distribution lines. Prior to the construction of such features, a Construction Authorization (Approval To Construct) may need to be obtained from the Pima County Environmental Quality. Also, air quality activity permits must be secured by the developer or prime contractor from the Pima County Department of Environmental Quality before constructing, operating or engaging in an activity which may cause or contribute to air pollution. If you have any questions regarding the above mentioned comments, please contact me at the telephone number shown under my signature on the first page of this letter CC: Project File |
| 05/22/2007 | JOE LINVILLE | LANDSCAPE | REVIEW | Denied | 1) Revise the numbering of the PIP plant in the scenic route buffer area on the landscape plan to match the inventory number on the NPP. 2) Add the CDRC case number and any related case numbers to the landscape and native plant preservation plans. DS 2-07.2.1.B 3) Revise the landscape plan to locate the Acacia greggii a safe distance away from the parking spaces. Trees with thorns that present hazards to pedestrians, bicycles, or vehicles are to be located to minimize hazards. These trees are not ideal for parking islands. 4) Revise the plans to eliminate the conflict between the plantings behind the scenic route buffer and the parking spaces. Plantings cannot be located within the parking space. Show the parking space dimension on the landscape plan to eliminate conflicts. RESUBMITTAL OF ALL PLANS IS REQUIRED. |
| 05/22/2007 | KAY MARKS | PIMA COUNTY | ADDRESSING | Approved | 201 N. STONE AV., 1ST FL TUCSON, AZ 85701-1207 KAY MARKS ADDRESSING OFFICIAL PH: 740-6480 FAX #: 740-6370 TO: CITY PLANNING FROM: KAY MARKS, ADDRESSING OFFICIAL SUBJECT: D07-0002 ACE HARDWARE BEAR CANYON RD/REVISED DEVELOPMENT PLAN DATE: 5/22/07 The above referenced project has been reviewed by this Division for all matters pertaining to street naming/addressing, and we hereby approve this project. Submit a 24 x 36 Reverse Reading Double Matte Photo Mylar of approved Development Plan to City Planning. Signed and dated Mylar will be forwarded to Pima County Addressing prior to assignment of addresses. 2.) All addresses will need to be displayed per Pima County Address Standards at the time of final inspection. ES |
| 05/25/2007 | ANDY VERA | ENV SVCS | REVIEW | Approved | 1. Trash enclosure detail on sheet 3, gates must be constructed with the ability to be secured in the open position. DS 6-01.4.2.C.4. Add (2) additional cane bolt sleeves and identify/annotate on detail. Also, recommend mounting gates to the face of the CMU wall or post so that they do not encroach within the 10ft inside clear area. Design to open a minimum of 180 degrees when possible. 2. Access and approach to enclosure area works and maneuverability within development is okay. |
| 06/04/2007 | STEVE SHIELDS | ZONING | REVIEW | Approved | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: Steve Shields Lead Planner PROJECT: Ace Hardware - Bear Canyon Road D07-0002 Development plan (2nd Review) TRANSMITTAL DATE: June 4, 2007 DUE DATE: June 6, 2007 COMMENTS: Please resubmit revised drawings along a response letter, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed. 1. Section 5.3.8.2, LUC, permits a maximum of one year from the date of application to obtain approval of a development plan. If, at the end of that time, the development plan has not been approved, it must be revised to be in compliance with all regulations in effect at that time, and must be resubmitted for a full CDRC review. The one-year expiration date for this development plan is January 16, 2008. 2. This comment was not fully addressed. The dimension shown for the future sidewalk is incorrect, see engineering comments. D.S. 2-05.2.4.F Show the location of the future sidewalk on the plan. 3. D.S. 2-05.2.4.F Per D.S. 2-08.4.1 the sidewalk located along the south side of the building must be physically separated from any vehicular travel lane, by means of curbing, grade separation, barriers, railings, or other means. Revise plan. 4. The Zoning Review Section approves the development plan for this project, subject to the following changes on the sign-off copies. However, should there be any changes requested by other CDRC members, the Zoning Review Section approval is void, and we request copies of the revised development plan to verify that those changes do not affect any zoning requirements. If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956 C:\planning\cdrc\developmentplan\D07-0002dp-2nd.doc RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development plan, and additional requested documents. |
| 06/18/2007 | PAUL MACHADO | ENGINEERING | REVIEW | Approved | |
| 06/20/2007 | PATRICIA GEHLEN | ZONING-DECISION LETTER | REVIEW | Denied | COMMUNITY DESIGN REVIEW COMMITTEE DEVELOPMENT SERVICES June 21, 2007 Kevin Hall DCC Company 2828 North Country Club, Suite 100 Tucson, Arizona 85716 Subject: D07-0002 Ace Hardware - Bear Canyon Development Plan Dear Kevin: Your submittal of May 8, 2007 for the above project has been reviewed by the Community Design Review Committee and the comments reflect the outstanding requirements which need to be addressed before approval is granted. Please review the comments carefully. Once you have addressed all of the comments, please submit the following revised documents and a DETAILED cover letter explaining how each outstanding requirement has been addressed: ALL BLACKLINES MUST BE FOLDED 3 Copies Revised Development Plan (ESD, Landscape, DSD) 2 Copies Revised Landscape Plan (Landscape, DSD) 2 Copies Revised NPPO Plan (Landscape, DSD) Should you have any questions, please call me at 791-5608 extension 1179. Sincerely, Patricia Gehlen CDRC Manager All comments for this case are available on our website at http://www.ci.tucson.az.us/dsd/ Via fax: 829-7856 dp-resubmittal |
| 06/21/2007 | FERNE RODRIGUEZ | START | PLANS SUBMITTED | Completed | |
| 06/21/2007 | ZELIN CANCHOLA | COT NON-DSD | TRAFFIC | Approved |