Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/21/2008 | FERNE RODRIGUEZ | START | PLANS SUBMITTED | Completed | |
05/22/2008 | JIM EGAN | COT NON-DSD | FIRE | Approved | |
05/23/2008 | JOSE ORTIZ | COT NON-DSD | TRAFFIC | Approved | |
05/30/2008 | JOE LINVILLE | LANDSCAPE | REVIEW | Denied | 1) Submit revised landscape plans that document any proposed revisions made to the Development Plan. 2) The addition of parking spaces (cited in your May 19 transmittal, although it could not be verified) may require the addition of canopy trees. LUC 3.7.2.3 This submittal did not include a set of landscape plans for the Landscape Review Section and Sheet DP1 was also not included. Please include all relevant documents in future submittals. |
06/04/2008 | STEVE SHIELDS | ZONING | REVIEW | Denied | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: Steve Shields Lead Planner PROJECT: Midvale Commercial Center D06-0060 Development plan Revision TRANSMITTAL DATE: June 4, 2008 DUE DATE: June 4, 2008 COMMENTS: Please resubmit revised drawings along a response letter, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed. 1. Revise Detail 1, Sheet DP5 to match what is shown on the plan. D.S. 2-05.2.4.K The revised handicapped access ramps shown on the south side of Area #4 does not appear to work. Detail 1 Sheet DP5 does not match what is shown on the plan. A minimum four (4) foot landing is required at the top of ramp. 2. D.S. 2-05.2.4.O Based on the provided loading space calculation 13 required, 11 provided, a Board of Adjustment for Variance is required. Zoning acknowledges that development plan D06-0060 loading space calculation was approved incorrectly. Zoning recommends that the loading space calculation be revised as follows: Required Provided Tract 1 6 Requirements exceeded, Tract2 Areas 2, 3, 4, 5 & 6 3 4 Areas 7, 8, 9 & 10 2 2 Area 11 2 2 Area 12 1 1 Billboard 1 1 If the loading space calculation is revised as shown above no variance is required. 3. D.S. 2-05.2.4.P Please clarify where the addition provided 19 vehicle parking spaces, shown for Tract 1, have been provided on the plan. Based on approved Development Plan D06-006 there were 1195 parking spaces provide for Tract 1. 4. D.S. 2-05.2.4.P There appears to be three (3) vehicle parking spaces that have been added north of Area #2 along the west side of the Walmart building. If these parking spaces are to be included in the required parking calculation a sidewalk is required between the parking spaces and the building, see D.S. 2-08.4.1.C. If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956 C:\planning\cdrc\developmentplan\D06-0060dpR-2nd.doc RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development plan, and additional requested documents. |
06/04/2008 | ELIZABETH EBERBACH | ENGINEERING | REVIEW | Approv-Cond | DATE: June 4, 2008 TO: Patricia Gehlen; CDRC Manager SUBJECT: Midvale Commercial Center Lot 2 Revised Development Plan Engineering 4th resubmittal review REVIEWER: Elizabeth Eberbach ACTIVITY NUMBER: D06-0060 SUMMARY: The revised Development Plan Revision sheets were submitted for review. Development Services Department Engineering maintains conditional approval of the Development Plan due to maneuverability issues pertaining to solid waste pick-up and loading zones. DEVELOPMENT PLAN CONDITIONS: 1) DS Sec.2-05.2.3.B: Submit the revised Development Plan addressing the remaining comments: a) Address the following comments for sheet DP 4: i) It is unclear as to whether the CC&R's submitted provide cross access easement in Tract 1 lot 1 needed for proposed back-up maneuver for loading dock at north end of Area #3. ii) At north west corner of Area #5/6, clarify maneuverability of loading zone. 2) On sheets DP2 - DP4, a dashed line is indicated that surrounds the Wal-Mart and Areas #2-6. Clarify what this line is in the legend. As stated previously, a grading plan review will be required prior to issuance of a grading permit. If you have questions, call me at 837-4934. Elizabeth Eberbach, PE Civil Engineer Engineering Division Development Services |
06/06/2008 | PATRICIA GEHLEN | ZONING-DECISION LETTER | REVIEW | Denied | COMMUNITY DESIGN REVIEW COMMITTEE DEVELOPMENT SERVICES June 6, 2008 Thomas Sayler-Brown SBBL 1001 North Alvernon Way, Suite 105 Tucson, Arizona 85711-1019 Subject: D06-0060 Midvale Commercial Center Revised Development Plan Dear Thomas: Your submittal of May 21, 2008 for the above project has been reviewed by the Community Design Review Committee and the comments reflect the outstanding requirements which need to be addressed before approval is granted. Please review the comments carefully. Once you have addressed all of the comments, please submit the following revised documents and a DETAILED cover letter explaining how each outstanding requirement has been addressed: ALL BLACKLINES MUST BE FOLDED 4 Copies Revised Development Plan (Landscape, Zoning, Engineering, DSD) 4 Copies Revised Landscape Plan (Landscape, Zoning, Engineering, DSD) Should you have any questions, please call me at 837-4919. Sincerely, Patricia Gehlen CDRC Manager All comments for this case are available on our website at http://www.ci.tucson.az.us/dsd/ Via fax: 620-0535 |
06/06/2008 | ANDY VERA | ENV SVCS | REVIEW | Approved |