Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: D06-0059
Parcel: 10119007D

Review Status: Completed

Review Details: RESUBMITTAL - CDRC - DEV PLAN

Permit Number - D06-0059
Review Name: RESUBMITTAL - CDRC - DEV PLAN
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
07/11/2007 FERNE RODRIGUEZ START PLANS SUBMITTED Completed
07/26/2007 ROGER HOWLETT COT NON-DSD COMMUNITY PLANNING Approved DEPARTMENT OF URBAN PLANNING & DESIGN COMMENTS

Regarding

SUBJECT: Community Design Review Committee Application

CASE NUMBER: CASE NAME: DATE SENT

D06-0059 TEP El Camino Del Cerro Sub 07/25/07

() Tentative Plat
(XXXX) Development Plan
(XXXX) Landscape Plan
() Revised Plan/Plat
() Board of Adjustment
() Other

CROSS REFERENCE: SE-06-36 TEP – Silverbell Road

NEIGHBORHOOD PLAN: Santa Cruz – Key Parcel 6

GATEWAY/SCENIC ROUTE: Silverbell Road

COMMENTS DUE BY: 08/08/07

SUBJECT DEVELOPMENT PLAN/PLAT HAS BEEN REVIEWED BY COMMUNITY PLANNING AND PRESERVATION, AND STAFF SUBMITS THE FOLLOWING COMMENTS:

() No Annexation or Rezoning Conditions, Not an RCP - No Comment
() Proposal Complies with Annexation or Rezoning Conditions
() RCP Proposal Complies with Plan Policies
() See Additional Comments Attached
(XXXX) No Additional Comments - Complies With Planning Comments Submitted on: 01/26/07
() Resubmittal Required:
() Tentative Plat
() Development Plan
() Landscape Plan
() Other – Detail Color Elevations of Wall

REVIEWER: drcorral 791-4505 DATE: July 25, 2007
07/31/2007 KAROL ARAGONEZ ZONING REVIEW Approved CDRC TRANSMITTAL

TO: Development Services Department Plans Coordination Office

FROM: Karol Aragonez
Planner

PROJECT: D06-0059
TEP El Camino Del Cerro
Development Plan Resubmittal

TRANSMITTAL DATE: July 27, 2007

DUE DATE: August, 8, 2007

COMMENTS:

The Zoning Review Section approves the development plan for this project. However, should there be any changes requested by other CDRC members, the Zoning Review Section approval is void, and we request copies of the revised development plan to verify that those changes do not affect any zoning requirements.

Please note the site and access easement is outside of the four hundred (400) foot SCZ zone. SCZ overlay zone review would not be required.


If you have any questions about this transmittal, please call Karol Aragonez, (520) 837-4960.

KAA S:\zoning review\karol\planning\cdrc\developmentplan\D06-0059dp1.doc
08/02/2007 JOE LINVILLE LANDSCAPE REVIEW Denied 1) Revise the plan to note the overlay case file number, date of approval, and any conditions of approval. DS 2-03.2.2.B.7

2) Applications for projects within the Scenic Corridor Zone (SCZ) shall be reviewed in accordance with the DSD Full Notice Procedure, Sec. 23A-50 and 23A-51. Contact Patricia Gehlen-Zoning Manager for application information. The decision to approve or deny the project will be based on the purpose, intent, and specific regulations of LUC 2.8.2.

The response letter indicates that the application was included with this submittal, but the Landscape Section did not receive the plans or review request from CDRC.

3) Revise the native plant preservation submittal to address the private access/utility easement from El Camino Del Cerro to the substation. DS 2-15.

4) Revise the notes on sheet 2 of the landscape submittal to correctly characterize the landscape border requirements. A 20' wide landscape border is required per the plans approved for SE-06-36. The Special Exception PDP and associated conditions refine the "code" for the site, thus the statement that the landscape border is not required by code is incorrect.

5) Add the Special Exception and SCZ Overlay case numbers to the landscape plans in the lower right corner.

6) TDOT maps indicate a watercourse identified as
"Xeroriparian Low Habitat" that may be afected by the proposed grading and site development. Revise the existing or provide a new Environmental Resource Report if the watercourse is a regulatory floodplain along with a mitigation plan as appropriate. DS 2-12.1.1

7) A vehicular use area must be provided with post barricades or wheel stop curbing designed to prevent parked vehicles from extending beyond the property lines; damaging adjacent landscaping, walls, or buildings and to prevent vehicles from driving onto unimproved portions of the site.
per DS 3-05.2.3.C. Revise the plans as necessary to either restrict access to the access maintenance easement with a (Parks Department approved) gate at El Camino Del Cerro or provide some other suitable barrier at the perimeter of the paved access.
08/08/2007 FRODRIG2 COT NON-DSD REAL ESTATE Denied >>> Jim Stoyanoff 08/08/2007 2:01 PM >>>
TEP needs to finalize the purchase of this property from the City before the development is approved. Please contact Gracie Ochoa @ 837-6710.
08/09/2007 JOSE ORTIZ COT NON-DSD TRAFFIC Approved
08/27/2007 PATRICIA GEHLEN ZONING-DECISION LETTER REVIEW Denied COMMUNITY DESIGN REVIEW COMMITTEE
DEVELOPMENT SERVICES

August 27, 2007

Joe Zeman
Engineering & Environmental Consultants, Inc
4625 East Fort Lowell Road
Tucson, Arizona 85712

Subject: D06-0059 TEP El Camino Del Cerro Substation Development Plan

Dear Joe:

Your submittal of July 11, 2007 for the above project has been reviewed by the Community Design Review Committee and the comments reflect the outstanding requirements which need to be addressed before approval is granted. Please review the comments carefully. Once you have addressed all of the comments, please submit the following revised documents and a DETAILED cover letter explaining how each outstanding requirement has been addressed:

ALL BLACKLINES MUST BE FOLDED

3 Copies Revised Development Plan (Landscape, Real Estate, DSD)

2 Copies Revised Landscape Plan (Landscape, DSD)

2 Copies Revised NPPO Plan (Landscape, DSD)








Should you have any questions, please call me at 837-4919.

Sincerely,


Patricia Gehlen
CDRC Manager
All comments for this case are available on our website at http://www.ci.tucson.az.us/dsd/

Via fax: 321-0333
dp-resubmittal
08/27/2007 ELIZABETH EBERBACH ENGINEERING REVIEW Approv-Cond TO: Bruce Wilson, PE
SUBJECT: TEP Substation Engineering Resubmittal Review
LOCATION: 3510 W EL CAMINO DEL CERRO, T13S R13E Sec17, Ward 1
REVIEWER: Elizabeth Eberbach PE
ACTIVITY: D06-0059

SUMMARY: The revised Development Plan and Drainage Report were reviewed by Development Services Department Engineering Division. It is recommended for conditional approval.

DEVELOPMENT PLAN CONDITION OF APPROVAL:
1) Tucson Code 26-5.2.(9): Although the response letter stated that a floodplain use permit application was submitted, none was found. Submit a Floodplain Use Permit Application at re-submittal. In the Floodplain Use Permit submittal, provide 4 copies of an exhibit which has the information shown on the revised Development Plan and label it as a Floodplain Use Permit exhibit. An elevation certificate will be required to be completed and submitted to the Development Services Department Engineering Division, after the pad elevations for the TEP electrical equipment is constructed, before the TEP electrical equipment is placed on the pads, to show that the elevation meets the approved minimum elevation recommended by the consultant as shown on the revised Development Plan. Contact the DSD Floodplain Elevation Certificate coordinator for returning the elevation certificate or if you have questions about the form. Submit floodplain use permit application with one copy of the drainage report.
2) This project does not appear to have a "combo" or "site plan" permit application associated with it. It may be necessary to obtain a construction permit to do activity at the site and be issued with the floodplain use permit. Please submit a yellow card application with your blue card (floodplain use permit) application. You may use the Development Plan documents in the submittal for the permits - changing the words "Development Plan" on the title block to "Site Plan" or similar name for construction drawings. With the application, submit 3 copies of the site plans.

The re-submittal should address the above conditions. Please call me at 837-4934 to discuss processing of the floodplain use permit, so that the floodplain use permit can be issued with any associated permits for this project, if any.

Elizabeth Eberbach, PE
Civil Engineer
Engineering Division
Development Services