Permit Number: D06-0050
Parcel: 12701005D

Review Status: Completed

Review Details: RESUBMITTAL - CDRC - DEV PLAN

Permit Number - D06-0050
Review Name: RESUBMITTAL - CDRC - DEV PLAN
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
06/28/2007 FERNE RODRIGUEZ START PLANS SUBMITTED Completed
06/29/2007 PATRICIA GILBERT ENGINEERING REVIEW Approved TO: Patricia Gehlen; CDRC Coordinator DATE: June 29, 2007

SUBJECT: Engineering review of the Pavilion Development Plan. The activity number is D06-0050.

SUMMARY: The Development Plan and Drainage Report were received by Engineering on June 28th, 2007 Engineering has reviewed the received items and recommends approval of the Development Plan.

DEVELOPMENT PLAN: APPROVED
07/05/2007 JOE LINVILLE LANDSCAPE REVIEW Approved Landscape borders proposed in right-of-way or MS&R areas must be approved by the City Engineer or designee and comply with the City Engineer's requirements on construction, irrigation, location, and plant type. Provide verification, in writing, of any approvals obtained. Contact Gary Wittwer, DOT Landscape Architect for specific requirements.
07/10/2007 KAROL ARAGONEZ ZONING REVIEW Approved CDRC TRANSMITTAL

TO: Development Services Department Plans Coordination Office

FROM: Karol Aragonez
Planner

PROJECT: D06-0050
The Pavilions
Development Plan Resubmittal

TRANSMITTAL DATE: July 10, 2007

DUE DATE: July 13, 2007

COMMENTS:

The Zoning Review Section approves the development plan for this project. However, should there be any changes requested by other CDRC members, the Zoning Review Section approval is void, and we request copies of the revised development plan to verify that those changes do not affect any zoning requirements.


If you have any questions about this transmittal, please call Karol Aragonez, (520) 791-5550, ext. 74960.

KAA S:\zoning review\karol\planning\cdrc\developmentplan\D06-0050dpr2.doc
07/17/2007 ANDY VERA ENV SVCS REVIEW Approv-Cond 1. Sheet 2, refuse enclosure detail - Dimensions shown for width of enclosure do not represent detail as shown. i.e. if bollards are 6" Dia. then the inside diemnsion of CMU wall is 11' 4" and the outside dimension is 12' 8".

2. Sheet 4 on DP, east enclosure does not provide adequate maneuverability or approach for service vehicle and is in conflict with loading zone.
Met with Quinn Quihui, Project Engineer and proposed repostioning of enclosures to satisfy this concern.

Correction as requested above will satisfy ES for approval.
07/18/2007 CDRC1 PIMA COUNTY WASTEWATER Denied June 22, 2007

To: John Lupo, P.E.
Castro Engineering

Thru: Patricia Gehlen, CDRC Manager
City of Tucson Development Services Department

_____________________________________________________
From: Tom Porter, Sr. CEA (520-740-6579), representing the Pima County
Departments of Wastewater Management and Environmental Quality

Subject: Pavilions at 5151 E Broadway Blvd
Development Plan - 4th Submittal
D06-0050

The drawings for the proposed Development Plan for the above-referenced project have been reviewed on behalf of the Pima County Department of Environmental Quality (PDEQ) and the Pima County Wastewater Management Department (PCWMD). This review letter may contain comments pertaining to the concerns of either Department. The following comments are offered for your use.

1. Sheet 3:Mark the manholes and sewer lines along Rosemont as public. Also mark the Exist. 4" Private Sewer as Exist. 4" BCS with slope/length and pipe material.

2. Sheet 3: Show the sewer directional flow arrows on the existing public sewer line along Rosemont.

3. Sheet 3: The proposed private sewer line should be centered in the PAAL. Also the slope/length and pipe material should be shown for each sewer line segment.

4. Sheet 3: The BCS for all proposed buildings with slope/size and pipe material should be shown on plan.

This office will require a revised set of bluelines, and a response letter, addressing these comments. Additional comments may be made during the review of these documents.

Pima County Code Title 13.20.030.A.2 requires that a wastewater review fee be paid for each submittal of the development plan. The fee for the first submittal is $166 plus $50 per sheet. For the second submittal, the review fee is $50 per sheet. For all subsequent submittals, the review fee is $39 per sheet.

The next submittal of this project will be the 5th submittal. A check for the review fee of this submittal in the amount of $39.00 (made out to PIMA COUNTY TREASURER) must accompany the revised set of bluelines and response letter.

If the number of sheets changes, please adjust the review fee accordingly.
07/19/2007 PATRICIA GEHLEN ZONING-DECISION LETTER REVIEW Denied COMMUNITY DESIGN REVIEW COMMITTEE
DEVELOPMENT SERVICES

July 19, 2007

John Lupo
Castro Engineering Corp.
3580 West Ina Road, Suite 200
Tucson, Arizona 85741

Subject: D06-0050 The Pavilions Development Plan

Dear John:

Your submittal of June 28, 2007 for the above project has been reviewed by the Community Design Review Committee and the comments reflect the outstanding requirements which need to be addressed before approval is granted. Please review the comments carefully. Once you have addressed all of the comments, please submit the following revised documents and a DETAILED cover letter explaining how each outstanding requirement has been addressed:

ALL BLACKLINES MUST BE FOLDED

3 Copies Revised Development Plan (ESD, Wastewater, DSD)







Should you have any questions, please call me at 791-5608 extension 1179.

Sincerely,


Patricia Gehlen
CDRC Manager

All comments for this case are available on our website at http://www.ci.tucson.az.us/dsd/

Via fax: 293-2115
dp-resubmittal