Permit Number: D06-0048
Parcel: 141113950

Review Status: Completed

Review Details: RESUBMITTAL - CDRC - DEV PLAN

Permit Number - D06-0048
Review Name: RESUBMITTAL - CDRC - DEV PLAN
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
05/29/2007 FERNE RODRIGUEZ START PLANS SUBMITTED Completed
06/12/2007 KAROL ARAGONEZ ZONING REVIEW Denied CDRC TRANSMITTAL

TO: Development Services Department Plans Coordination Office

FROM: Karol Aragonez
Planner

PROJECT: D06-0048
East Camino Abril Lot 32
Development Plan Resubmittal

TRANSMITTAL DATE: June 9, 2007

DUE DATE: June 26, 2007

COMMENTS: Please resubmit revised drawings along a response letter, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed.

1. Remove "Day Care from allowed uses in proposed use and motor vehicle parking calculations. Use is not allowed within AEZ ADC-2.

2. Please add truncated domes at the entrance to the cross walk. The domes are to provide a warning and direction to visually impaired individuals of a vehicle use area. The current placement would direct that person into fencing or directly into traffic. The area covered by the truncated domes shall be twenty-four (24) inches deep and extend the width of the crosswalk.
ANSI 406.12, ANSI 705

3. With the required addition of a second off-street loading space maneuvering ability on-site must be provided. When there is only one off-street loading space the street within the industrial zoned area can be used for maneuvering in and out of a space. When a second space is added street maneuvering is no longer allowed (LUC Sec. 3.4.4.2.A). Staff suggest placing the off-street loading spaces in the rear work area (34 ft. x 102 ft.), making that area part of the vehicle use area. This will allow a truck to enter and back-up. It would also reduce the work area square footage which would allow the number of required off-street loading spaces to be reduced to one (1).


If you have any questions about this transmittal, please call Karol Aragonez, (520) 791-5550, ext. 74960.

KAA S:\zoning review\karol\planning\cdrc\developmentplan\D06-0048dpr1.doc

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development plan.
06/18/2007 PAUL MACHADO ENGINEERING REVIEW Approved
06/25/2007 PATRICIA GEHLEN ZONING-DECISION LETTER REVIEW Denied COMMUNITY DESIGN REVIEW COMMITTEE
DEVELOPMENT SERVICES

June 25, 2007

Steve Wollerman
Southwestern Consulting Engineers, LLC
435 East 9th Street
Tucson, Arizona 85705

Subject: D06-0048 East Camino Abril Lot 32 Development Plan

Dear Steve:

Your submittal of May 29, 2007 for the above project has been reviewed by the Community Design Review Committee and the comments reflect the outstanding requirements which need to be addressed before approval is granted. Please review the comments carefully. Once you have addressed all of the comments, please submit the following revised documents and a DETAILED cover letter explaining how each outstanding requirement has been addressed:

ALL BLACKLINES MUST BE FOLDED

2 Copies Revised Development Plan (Zoning, DSD)

2 Copies Revised Landscape Plan (Zoning, DSD)







Should you have any questions, please call me at 791-5608 extension 1179.

Sincerely,

Patricia Gehlen
CDRC Manager

All comments for this case are available on our website at http://www.ci.tucson.az.us/dsd/
Via fax: 628-1063