| 03/01/2007 | FERNE RODRIGUEZ | START | PLANS SUBMITTED | Completed | |
| 03/06/2007 | PAUL MACHADO | ENGINEERING | REVIEW | Denied | To: Patricia Gehlen DATE: April 16, 2007 CDRC/Zoning Manager SUBJECT: Brown/Rita Ranch Lot 32, 9034 E. Camino De Abril Development Plan D06-0048 (Second Review) T15S, R15E, Section 27 RESUBMITTAL REQUIRED: Development Plan and Drainage Statement. The Development Plan (DP) and Drainage Statement (DS) cannot be approved as submitted. Please address the following review comments prior to the next submittal. Development Plan: 1. Please include a response letter to the comments along with the corrected copies of the DP. 2. Please list estimated cut & fill quantities. The DP is a Site plan with a re-zoning history. The c/f quantities will be checked against the grading plan for consistency. The c/f quantities an estimate only. Revise as required. 3. Show refuse container location, size, and access thereto fully dimensioned per D.S. 2-02.2.1.32 and D.S. 6-01.0. The approach to the refuse enclosure still does not meet standards. Perhaps a meeting to discuss its location is necessary. Contact Paul Machado for an appt. Drainage Statement: 1. The DS has been accepted for DP purposes only. If you have any questions, I can be reached at 837-4932 or Paul.Machado@tucsonaz.gov Paul P. Machado Senior Engineering Associate City of Tucson/Development Services Department 201 N. Stone Avenue, P.O. Box 27210 Tucson, Arizona 85726-7210, (520) 837-4932 office, (520) 879-8010 fax, C:/9034 E Camino De Abril CDRC Lot 32_2 |
| 03/07/2007 | JOSE ORTIZ | COT NON-DSD | TRAFFIC | Approved | |
| 03/15/2007 | KAROL ARAGONEZ | ZONING | REVIEW | Denied | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: Karol Aragonez Planner PROJECT: D06-0048 East Camino Abril Lot 32 Development Plan Resubmittal TRANSMITTAL DATE: March 15, 2007 DUE DATE: March 29, 2007 COMMENTS: Please resubmit revised drawings along a response letter, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed. 1. Uses that are indicated on the development plan must meet minimum motor vehicle and bicycle parking, off-street loading, and AEZ criteria. From the list of proposed uses and parking calculations, please remove the following uses: Salvaging, Communication, and Trade Service and Repair Major. These uses will require additional parking and/or special requirements to be done to the site which currently cannot be met as drawn. 2. Please make sure that surrounding zoning is readable. Current font/style does not reproduce well and cannot be read. 3. The GFA area that is provided on the cover sheet in the parking calculations and vicinity map is 2400 sq. ft. The GFA shown on sheet C-1.2 within the building footprint indicates a total of 2925 sq. ft. Parking required for the larger GFA is fifteen (15) spaces. Please determine which is GFA is right and revise plan and calculations accordingly. 4. Placement of truncated domes at the beginning of the access aisle at the transition from pedestrian walkway to vehicle use area is required to serve as a warning device. Detectable warnings (truncated domes) are required at all accessible aisles. The area covered by the truncated domes shall be twenty-four (24) inch deep and extend the full width of the access aisles of handicapped motor vehicle parking spaces. The domes shall be located so the edge nearest the curb line is six (6) inches to eight (8) inches from the curb line. Please review areas on the plan where truncated domes are called out to verify that their placement meets the ANSI requirements and purpose in mind. ANSI 406.12, ANSI 705 5. Signage for accessible parking is to be posted at seven (7) feet from the curb to the bottom of the sign per TDOT requirements. Please revise detail B/3. 6. Please revise the off-street loading calculations using the correct GFA of 2,925 sq. ft. Please add the off-street loading requirements per Table 3 (LUC 3.4.5.3), two (2) spaces are required for GFA between 10,001-30,000 sq. ft. This will require the addition of a second off-street loading space twelve (12) feet wide by thirty-five (35) feet long. Provide the required length and wide of both spaces with the revised calculations. LUC 3.4.5.1 & LUC 3.4.5.3 7. Please dimension the separation between bicycle parking spaces as thirty (30) inches. The spacing is currently shown as twenty-nine (29) inches. DS 2-09.5.1.A 8. Please correct the acronyms from AHD to ADC in general note 22. The reviewer provided the wrong acronym. 9. Please indicate that gate will remain open during business hours to allow access to required parking. If you have any questions about this transmittal, please call Karol Aragonez, (520) 791-5550, ext. 1197. KAA S:\zoning review\karol\planning\cdrc\developmentplan\D06-0048dpr.doc RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development plan and additional requested documents. |
| 03/26/2007 | JOE LINVILLE | LANDSCAPE | REVIEW | Approv-Cond | Revise the native plant preservation plans and the landscape plans to show the same limits of grading. DS 2-15.3.4.A |
| 03/30/2007 | KAY MARKS | PIMA COUNTY | ADDRESSING | Approved | 201 N. STONE AV., 1ST FL TUCSON, AZ 85701-1207 KAY MARKS ADDRESSING OFFICIAL PH: 740-6480 FAX #: 740-6370 TO: CITY PLANNING FROM: KAY MARKS, ADDRESSING OFFICIAL SUBJECT: D06-0048 EAST CAMINO ABRIL LOT 32/REVISED DEVELOPMENT PLAN DATE: 3/29/07 The above referenced project has been reviewed by this Division for all matters pertaining to street naming/addressing, and we hereby approve this project. Submit a 24 x 36 Reverse Reading Double Matte Photo Mylar of approved Development Plan to City Planning. Signed and dated Mylar will be forwarded to Pima County Addressing prior to assignment of addresses. 2.) All addresses will need to be displayed per Pima County Address Standards at the time of final inspection. ES |
| 04/24/2007 | PATRICIA GEHLEN | ZONING-DECISION LETTER | REVIEW | Denied | COMMUNITY DESIGN REVIEW COMMITTEE DEVELOPMENT SERVICES April 24, 2007 Steve Wollerman Southwestern Consulting Engineers, LLC 435 East 9th Street Tucson, Arizona 85705 Subject: D06-0048 East Camino Abril Lot 32 Development Plan Dear Steve: Your submittal of March 1, 2007 for the above project has been reviewed by the Community Design Review Committee and the comments reflect the outstanding requirements which need to be addressed before approval is granted. Please review the comments carefully. Once you have addressed all of the comments, please submit the following revised documents and a DETAILED cover letter explaining how each outstanding requirement has been addressed: ALL BLACKLINES MUST BE FOLDED 3 Copies Revised Development Plan (Zoning, Engineering, DSD) 3 Copies Revised Landscape Plan (Zoning, Engineering, DSD) 2 Copies Revised Drainage Statement (Engineering, DSD) Should you have any questions, please call me at 791-5608 extension 1179. Sincerely, Patricia Gehlen CDRC Manager All comments for this case are available on our website at http://www.ci.tucson.az.us/dsd/ Via fax: 628-1063 |
| 04/24/2007 | FRODRIG2 | PIMA COUNTY | WASTEWATER | Approved | March 28, 2007 TO: Steve Wollerman, P.E. Southwestern Consulting Engineers, LLC THRU: Patricia Gehlen, CDRC Manager City of Tucson, Development Services Department FROM: Chandubhai C. Patel, P.E., Civil Engg. Manager Development Review Division (Wastewater) Pima County Development Services Department SUBJECT: Lot 32, Industrial/Commercial Services Site Development Plan – 2nd. Submittal D06-0048 The proposed sewer collection lines to serve the above-referenced project have been reviewed on behalf of the Pima County Department of Environmental Quality (PDEQ) and the Pima County Wastewater Management Department (PCWMD). This review letter may contain comments pertaining to the concerns of either Department. The following comments are offered for your use. The Pima County Department of Environmental Quality and the Wastewater Management Department hereby approve the above referenced submittal of the development plan as received on February 28, 2007.. Please note the following: Approval of the above referenced submittal does not authorize the construction of public or private sewer collection lines, or water distribution lines. Prior to the construction of such features, a Construction Authorization (Approval to Construct) may need to be obtained from the Pima County Department of Environmental Quality. Also, air quality active permits must be secured by the developer or prime contractor from the Pima County Department of Environmental Quality before constructing, operating, or engaging in any activity which may cause or contribute to air pollution. If you have any questions regarding the above comments, please do not hesitate to contact me. Sincerely, Chandubhai C. Patel, P.E. Telephone: (520) 740-6563 Copy: RSE Job # 0432.08.1 |