Permit Number: D06-0047
Parcel: 141113920

Review Status: Completed

Review Details: RESUBMITTAL - CDRC - DEV PLAN

Permit Number - D06-0047
Review Name: RESUBMITTAL - CDRC - DEV PLAN
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
03/15/2007 FERNE RODRIGUEZ START PLANS SUBMITTED Completed
03/16/2007 PAUL MACHADO ENGINEERING REVIEW Denied To: Patricia Gehlen DATE: May 23, 2007
CDRC/Zoning Manager
SUBJECT: Brown/Rita Ranch Lot 29, 9082 E. Camino De Abril
Development Plan D06-0047 (First Review) T15S, R15E, Section 27

RESUBMITTAL REQUIRED: Development Plan and Drainage Statement.

The Development Plan (DP) and Drainage Statement (DS) cannot be approved as submitted. Please address the following review comments prior to the next submittal.

Development Plan:

1. Please include a response letter to the comments along with the corrected copies of the DP.
2. Show refuse container location, size, and access thereto fully dimensioned per D.S. 2-02.2.1.32 and D.S. 6-01.0. The service vehicle cannot exceed more than 40' straight back (or on a curve) to begin the maneuver to exit the property.
3. Fully-dimensioned loading space(s) and maneuvering area(s) per D.S. 2-02.2.1.14.

Drainage Statement:
1. Please include a response letter to the comments along with the corrected copies of the DS.
2. The DS has been accepted for DP purposes only. Final acceptance will be at the grading plan stage.


If you have any questions, I can be reached at 791-5550 x1193 or Paul.Machado@tucsonaz.gov
Paul P. Machado
Senior Engineering Associate
City of Tucson/Development Services Department
201 N. Stone Avenue, rP.O. Box 27210
Tucson, Arizona 85726-7210,
(520) 791-5550 x1193 office,
(520) 879-8010 fax,
C:/9082 E Camino De Abril CDRC Lot 29_2
03/26/2007 JOSE ORTIZ COT NON-DSD TRAFFIC Denied April 10, 2007
ACTIVITY NUMBER: D06-0047
PROJECT NAME: East Camino Abril Lot # 29
PROJECT ADDRESS: 9082 E. Camino Abril
PROJECT REVIEWER: Jose E. Ortiz PE, Traffic Engineer

Resubmittal Required: Traffic Engineering does not recommend approval of the Development Plan; therefore a revised Development Plan is required for re-submittal.

The following items must be revised or added to the plan.

1. Include a response letter with the next submittal that states how all comments have been addressed.

2. Ensure that the solid waste vehicle can maneuver on-site to gather and leave the site without backing into the public roadway. The exhibit provided does not correctly illustrate the maneuvering motion of a standard solid waste vehicle. Please revisit and revise exhibit to ensure that solid waste vehicles can maneuver on site and leave the site face forward.



If you have any questions, I can be reached at 791-4259 x305 or Jose.Ortiz@tucsonaz.gov
04/11/2007 JOE LINVILLE LANDSCAPE REVIEW Approv-Cond Revise the Development Plan keynote 20. The referenced detail is not shown on the plans.
04/11/2007 KAY MARKS PIMA COUNTY ADDRESSING Approved 201 N. STONE AV., 1ST FL
TUCSON, AZ 85701-1207

KAY MARKS
ADDRESSING OFFICIAL
PH: 740-6480
FAX #: 740-6370


TO: CITY PLANNING
FROM: KAY MARKS, ADDRESSING OFFICIAL
SUBJECT: D06-0047 EAST CAMINO ABRIL LOT 29/REVISED DEVELOPMENT PLAN
DATE: 4/11/07



The above referenced project has been reviewed by this Division for all matters pertaining to street naming/addressing, and we hereby approve this project.


Submit a 24 x 36 Reverse Reading Double Matte Photo Mylar of approved Development Plan to City Planning. Signed and dated Mylar will be forwarded to Pima County Addressing prior to assignment of addresses.

2.) All addresses will need to be displayed per Pima County Address Standards at the time of final inspection.



ES
04/11/2007 ANDY VERA ENV SVCS REVIEW Denied * Enclosure detail on page 3 is not in alignment. Please correct on re-submittal.

* Vehicle maneuverability does not work as shown on page 3. Service vehicle requires adequate space to maneuver and position itself safely within the development without having to back into the street.
Requires a 36' inside rear wheel and 50' outside front bumper turning radii which the drawing does not demonstrate accurately.
04/16/2007 KAROL ARAGONEZ ZONING REVIEW Denied CDRC TRANSMITTAL

TO: Development Services Department Plans Coordination Office

FROM: Karol Aragonez
Planner

PROJECT: D06-0047
East Camino Abril-Lot 29
Development Plan

TRANSMITTAL DATE: April 16, 2007

DUE DATE: April 12, 2007

COMMENTS: Please resubmit revised drawings along a response letter, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed.

1. Uses that are indicated on the development plan must meet minimum motor vehicle and bicycle parking, off-street loading, and AEZ criteria. From the list of proposed uses and parking calculations, please remove the following uses: Salvaging, Communication, and Trade Service and Repair Major. These uses will require additional parking and/or special requirements to be done to the site which currently cannot be met as drawn.

2. Please make sure that surrounding zoning is readable. Current font/style does not reproduce well and cannot be read.

3. Please provide a minimum distance of five (5) feet for a pedestrian refuge area between the building and PAAL. Within this refuge area a four (4) foot wide sidewalk must be provided and be physically separated with curbing. (DS 3-05.2.2.B.1) The minimum width of a two-way traffic aisle is twenty-four (24) feet. (DS 3-05.2.1.C.1). Please provide the required refuge area and sidewalk along the northwest side of the building.

4. The pedestrian refuge area located along the northwest property line linking the bicycle parking to parking spaces to the north must be a four (4) foot wide concrete sidewalk and be physically separated from the vehicular travel lane by means of curbing, grade separation, barriers, railings, or other means.
DS 2-08.4.1 & DS 2-08.5.1.A & C

5. Please revise the handicap parking detail C/3. For every six accessible spaces provided at least one shall be van accessible. The aisle is to increase to eight (8) feet per TDOT requirements for van accessible spaces for a total of sixteen (16) feet for both parking space and access aisle.

6. Signage for accessible parking is to be posted at seven (7) feet from the curb to the bottom of the sign per TDOT requirements. Please revise detail B-1/3

7. Please add the off-street loading requirements per Table 3 (LUC 3.4.5.3), two (2) spaces are required for GFA between 10,001-30,000 sq. ft. This will require the addition of a second off-street loading space twelve (12) feet wide by thirty-five (35) feet long. Provide the required length and wide of both spaces with the revised calculations.
LUC 3.4.5.1 & LUC 3.4.5.3

8. Detail O-3 is for trash pick-up. Please denote how large semi-trucks can maneuver into the proposed off-street loading space. It appears that the way the space is located it large trucks will not be able to get in and out of the space. The size of the maneuvering area is based on national standards for turning radii required of the vehicles for which the space is designed.
LUC 3.4.4.2.C

9. Please dimension the distance between the building and the northwest and southwest property line.
DS 2-05.2.4.I

10. It is suggested that Class 1 bicycle parking be removed from the development plan. Any use providing less than fifty (50) motor vehicle parking spaces may substitute Class 2 spaces for Class 1 spaces.
LUC 3.3.7.8.A

11. Please correct the acronyms from AHD to ADC in general note 22. The reviewer provided the wrong acronym.

12. Please indicate that gate will remain open during business hours to allow access to required parking.

If you have any questions about this transmittal, please call Karol Aragonez, (520) 791-5550, ext. 7496.

KAA S:\zoning review\karol\planning\cdrc\developmentplan\D06-0044dpr.doc

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development plan and additional requested documents.
05/23/2007 PATRICIA GEHLEN ZONING-DECISION LETTER REVIEW Denied COMMUNITY DESIGN REVIEW COMMITTEE
DEVELOPMENT SERVICES

May 23, 2007

Steve Wollerman
Southwestern Consulting Engineers, LLC
435 East 9th Street
Tucson, Arizona 85705

Subject: D06-0047 East Camino Abril Lot 29 Development Plan

Dear Steve:

Your submittal of March 15, 2007 for the above project has been reviewed by the Community Design Review Committee and the comments reflect the outstanding requirements which need to be addressed before approval is granted. Please review the comments carefully. Once you have addressed all of the comments, please submit the following revised documents and a DETAILED cover letter explaining how each outstanding requirement has been addressed:

ALL BLACKLINES MUST BE FOLDED

6 Copies Revised Development Plan (ESD, Zoning, Traffic, Landscape, Engineering, DSD)

4 Copies Revised Landscape Plan (Zoning, Landscape, Engineering, DSD)

2 Copies Revised Drainage Statement (Engineering, DSD)








Should you have any questions, please call me at 791-5608 extension 1179.

Sincerely,

Patricia Gehlen
CDRC Manager

All comments for this case are available on our website at http://www.ci.tucson.az.us/dsd/
Via fax: 628-1063