Permit Number: D06-0040
Parcel: 14042075A

Review Status: Completed

Review Details: REVISION - DEV PLAN

Permit Number - D06-0040
Review Name: REVISION - DEV PLAN
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
10/15/2008 FERNE RODRIGUEZ START PLANS SUBMITTED Completed
10/16/2008 FERNE RODRIGUEZ PIMA COUNTY WASTEWATER Approved September 9, 2008

To: Darren Watson
Kimley-Horn & Associates

Thru: Patricia Gehlen, CDRC Manager
City of Tucson Development Services Department

____________________________________
From: Tom Porter, Sr. CEA (520-740-6579), representing the Pima County
Departments of Wastewater Management and Environmental Quality

Subject: Staybridge Suites
Development Plan –4th Submittal(Rev)
D06-0040

The proposed sewer collection lines for the above-referenced project have been reviewed on behalf of the Pima County Department of Environmental Quality (PDEQ) and the Pima County Wastewater Management Department (PCWMD). This review letter may contain comments pertaining to the concerns of either Department. The following comments are offered for your use.

The Pima County Department of Environmental Quality and Wastewater Management Department hereby approve the above referenced submittal of the development plan as submitted.

Please note the following: Approval of the above referenced submittal does not authorize the construction of public or private sewer collection lines, or water distribution lines. Prior to the construction of such features, a Construction Authorization (Approval To Construct) may need to be obtained from the Pima County Environmental Quality.

Also, air quality activity permits must be secured by the developer or prime contractor from the Pima County Department of Environmental Quality before constructing, operating or engaging in an activity which may cause or contribute to air pollution.
10/17/2008 RONALD BROWN ZONING HC SITE REVIEW Approved
10/21/2008 JASON GREEN ENGINEERING REVIEW Approved DATE: October 21, 2008
SUBJECT: Staybridge Suites Revised Development Plan- 2nd Engineering Review
TO: Patricia Gehlen, CDRC Manager
LOCATION: 2705 E Executive Dr, T15S R14E Sec17, Ward 5
REVIEWERS: Jason Green, CFM
ACTIVITY: D06-0040

SUMMARY: Engineering Division of Development Services Department has received the revised development plan. Engineering Division has reviewed the submitted development plan and recommends approval at this time.

GRADING PLAN:

DS Sec.11-01.2.1: For future reference a revised grading permit will be required for this project. A grading permit may not be issued prior to development plan approval.

Please ensure the grading plan is consistent with the revised development plan, Drainage Report, and Geotechnical Report. Grading standards may be accessed at: http://www.ci.tucson.az.us/dsd/DevStandsTOC.pdf.

GENERAL COMMENTS:

Please provide the Final development plan Mylar for review and approval.

For any questions or to schedule a meeting call me at 837-4929.



Jason Green, CFM
Senior Engineer Associate
Engineering Division
Development Services
10/22/2008 DAVID RIVERA ZONING REVIEW Approved CDRC TRANSMITTAL

TO: Development Services Department Plans Coordination Office
FROM: David Rivera
Principal Planner

PROJECT: D06-0040
Staybridge Suites
Development Plan (revised)

TRANSMITTAL DATE: October 22, 2008

DUE DATE: October 29, 2008

COMMENTS: Approved


If you have any questions about this transmittal, please call David Rivera, (520) 791-5608.

C:\planning\cdrc\developmentplan\D060040revdpa.doc
10/29/2008 ANDY VERA ENV SVCS REVIEW Approved
11/03/2008 PATRICIA GEHLEN ZONING-DECISION LETTER REVIEW Approved COMMUNITY DESIGN REVIEW COMMITTEE
DEVELOPMENT SERVICES


November 3, 2008

Dave Martin, P.E.
Kimley-Horn and Associates, Inc.
1860 East River Road, #100
Tucson, Arizona 85750

Subject: D06-0040 Staybridge Suites Revised Development Plan

Dear Dave:

The above referenced development plan has been APPROVED by the Community Design Review Committee. Once the necessary corrections are made per the on-line comments, please submit the following documents for sign-off.

1 Rolled blueline COMPLETE SET of the Development Plan, Landscape Plan, and the Native Plant Preservation Plan (if part of the original submittal). Please include applicable sheets from any other concurrent reviews.
AND
1 Rolled blueline set of the Development Plan.
AND
1 CD that contains all of the drainage/hydrology and other reports submitted for the review and approval of this plan.

The extra rolled blueline set that you submit will be delivered to Pima County for permanent recording. Additional blackline copies will be made from the complete set and distributed to various review agencies for their files. These copies will be ordered from the City's contracted print company and billed to you unless you already have an account at another printing company. Please let us know which printing company you would prefer to use and list them on your attached transmittal form when submitting your mylars to the CDRC office for sign-off approval. Your printing company will deliver the rolled blueline to your office. If you are out of town you will need to contact the printing company for pick up or mailing arrangement options.

PLEASE HAVE THE CITY OF TUCSON APPROVAL STAMP PLACED ON EACH SHEET OF THE SUBMITTAL SET, PREFERABLY IN THE LOWER RIGHT HAND CORNER NEAR THE TITLE BLOCK. THE STAMP IS LOCATED AT http://www.tucsonaz.gov/dsd/CDRC___Rezoning/CDRC/CDRC_Stamp/cdrc_stamp.html. BLUELINE SETS THAT DO NOT HAVE THE STAMP WILL BE RETURNED FOR CORRECTION.

Should you have any questions, please call me at 837-4919.

Sincerely,



Patricia Gehlen
CDRC Manager