Permit Number: D06-0040
Parcel: 14042075A

Review Status: Completed

Review Details: RESUBMITTAL - CDRC - DEV PLAN

Permit Number - D06-0040
Review Name: RESUBMITTAL - CDRC - DEV PLAN
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
07/20/2007 FERNE RODRIGUEZ START PLANS SUBMITTED Completed
07/25/2007 FRODRIG2 PIMA COUNTY WASTEWATER Approved July 25, 2007

To: Dave Martin, Kimley-Horn & Associates

Thru: Patricia Gehlen, CDRC Manager
City of Tucson Development Services Department

____________________________________
From: Tom Porter, Sr. CEA (520-740-6579), representing the Pima County
Departments of Wastewater Management and Environmental Quality

Subject: Staybridge Suites
Development Plan –3rd Submittal
D06-0040

The proposed sewer collection lines for the above-referenced project have been reviewed on behalf of the Pima County Department of Environmental Quality (PDEQ) and the Pima County Wastewater Management Department (PCWMD). This review letter may contain comments pertaining to the concerns of either Department. The following comments are offered for your use.

The Pima County Department of Environmental Quality and Wastewater Management Department hereby approve the above referenced submittal of the development plan as submitted.

Please note the following: Approval of the above referenced submittal does not authorize the construction of public or private sewer collection lines, or water distribution lines. Prior to the construction of such features, a Construction Authorization (Approval To Construct) may need to be obtained from the Pima County Environmental Quality.

Also, air quality activity permits must be secured by the developer or prime contractor from the Pima County Department of Environmental Quality before constructing, operating or engaging in an activity which may cause or contribute to air pollution.

If you have any questions regarding the above mentioned comments, please contact me .
08/08/2007 KAROL ARAGONEZ ZONING REVIEW Approv-Cond CDRC TRANSMITTAL

TO: Development Services Department Plans Coordination Office

FROM: Karol Aragonez
Planner

PROJECT: D06-0040
Staybridge Suites
Development Plan Resubmittal

TRANSMITTAL DATE: August 8, 2007

DUE DATE: August 17, 2007

COMMENTS:

The Zoning Review Section approves the development plan for this project, subject to the following changes on the sign-off copies. However, should there be any changes requested by other CDRC members, the Zoning Review Section approval is void, and we request copies of the revised development plan to verify that those changes do not affect any zoning requirements.

1. The curb ramp flares shall not be steeper than 1:10. Counter slopes of adjoining gutters and road surfaces immediately adjacent to the curb ramp shall not be steeper than 1:20. The adjacent surfaces at transitions at curb ramps to walks, gutters and streets shall be at the same level. All slopes are to be indicated on the ramp details.
ANSI 406.2, 3, & 4


If you have any questions about this transmittal, please call Karol Aragonez, (520) 837-4960.

KAA S:\zoning review\karol\planning\cdrc\developmentplan\D0D06-0040dpr1.doc

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development plan
08/09/2007 JOE LINVILLE LANDSCAPE REVIEW Approv-Cond 1) Revise the native plant preservation plan to provide mitigation for plants that are proposed to be removed from site. If plants 3-5 are not TOS or PIP it is assumed that they will be Removed From Site. Please clarify and correct the calculations. LUC Table 3.8.6-I

Our calculations based on DS 2-15.0 Exhibit 1:

Species: Prosopis velutina

Enter total viable plants 5
Preservation Required @ 30% 1.5

Minimum PIP and/or TOS 2

Enter Proposed PIP 0
Minimum TOS (if negative, enter 0) 2

Enter Proposed TOS 2
Excess TOS (=TOS Credit) 1
Total Plants On Site 2

Total Plants RFS (if negative, enter 0) 3

Enter Preservation Credits Quantity
Barrel Cacti >2' H x2
Other Cacti >4" H x2
Ocotillos >6' H x2
Yuccas >2' H x2
Other Trees 6-14" cal. X2
Other Trees >14" cal. X4
Shrubs >6' H or D x2
Total Preservation Credits 0

TOS Mitigation 2

RFS Mitigation Requirements 6

Total Mitigation (w/o credits) 8
Minus Excess TOS Credit Equals: 8
Minus PIP Credit Equals: 8
Total Mitigation (if negative, enter 0) 8

Total Plants of This Species On Site 10


OK to submit mylars with requested changes.
08/16/2007 ANDY VERA ENV SVCS REVIEW Approv-Cond 1. There is not adequate area for service vehicle to back away from enclosure, turn south into PAAL, manuever within development to exit, without having to back into 24 ft access easement/moving traffic.
If access easement is identified as low volume traffic ES may allow backing as DP currently shows to require.

Requires a DSMR to DS 6-01.4.1.I
08/20/2007 JASON GREEN ENGINEERING REVIEW Approv-Cond DATE: August 20, 2007
SUBJECT: Staybridge Suites Development Plan- 3rd Engineering Review
TO: Patricia Gehlen, CDRC Manager
LOCATION: 2705 E Executive Dr, T15S R14E Sec17, Ward 5
REVIEWERS: Jason Green, CFM
ACTIVITY: D06-0040


SUMMARY: Engineering Division of Development Services Department has received the revised development plan, revised drainage report (Kimley-Horn and Associates, Inc, 14JUL07), last approved Drainage Report for Bay Colony Technology Center, Lots 3 and 13 (CMG Drainage Engineering, Inc, 18SEP02), and Geotechnical Investigation Report (Forsee&Vann, Inc, 16FEB06). Engineering Division has reviewed the submitted development plan and recommends conditional approval at this time. The following items need to be addressed prior to Mylar approval:


DEVELOPMENT PLAN:

1) DS Sec.2-05.2.4.T: The refuse vehicle must have a maximum back-up distance of 40-feet and can not back-up into or over a pedestrian circulation. Per the last submitted development plan the refuse vehicle has to back up greater than the allowed 40-foot distance and will be required to back into one lane of a 24-foot ingress egress easement. A Development Standard Modification Request (DSMR) is required in order to approve the proposed maneuverability.

2) Provide the approved DSMR to the CDRC Department prior to Mylar approval. The Development Plan Mylar can not be approved prior to DSMR approval


GENERAL COMMENTS:

Please provide the approved DSMR for the refuse vehicle maneuverability and the Development Plan Mylars.

For any questions, or to schedule a meeting call me at 837-4929.



Jason Green, CFM
Senior Engineer Associate
Engineering Division
Development Services
08/20/2007 PATRICIA GEHLEN ZONING-DECISION LETTER REVIEW Denied COMMUNITY DESIGN REVIEW COMMITTEE
DEVELOPMENT SERVICES

August 20, 2007

Dave Martin, P.E.
Kimley-Horn and Associates, Inc.
1860 East River Road, #100
Tucson, Arizona 85750

Subject: D06-0040 Staybridge Suites Development Plan

Dear Dave:

Your submittal of July 24, 2007 for the above project has been reviewed by the Community Design Review Committee and the comments reflect the outstanding requirements which need to be addressed before approval is granted. Please review the comments carefully. Once you have addressed all of the comments, please submit the following revised documents and a DETAILED cover letter explaining how each outstanding requirement has been addressed:

ALL BLACKLINES MUST BE FOLDED

4 Copies Revised Development Plan (Zoning, Landscape, Engineering, DSD)

2 Copies Revised NPPO Plan (Landscape, DSD)






Should you have any questions, please call me at 837-4919.

Sincerely,



Patricia Gehlen
CDRC Manager

All comments for this case are available on our website at http://www.ci.tucson.az.us/dsd/
Via fax: 615-9292